Рет қаралды 22,273
This build started in Dec of 2020 and finished in May of 2021. It was the first full bike build I have ever done. The idea was to take a classic bike and modernize it a bit with newer suspension and a freshly rebuilt motor. I had such a great time building this bike and learned so much while doing so. This bike is definitely no trailer queen and gets ridden often. Be sure to follow me on instagram (Next_Project_AZ). I have documented this build in much more detail and have linked the videos below.
Check out Factory Edge (my motor builder) on factory_edge
Check out CM.Off-road for parts and vapor blasting cm.offroad
Links to more detailed videos of this bike build:
1993 YZ250 Build: Part 1 | Wash and Tear down
• 1993 YZ250 Build: Part...
1993 YZ250 Build: Part 2 | Motor disassembly
• 1993 YZ250 Build: Part...
1993 Yz250 Build: Part 3 Powder Coating and Color Scheme
• 1993 Yz250 Build: Part...
1993 YZ250 Build: Part 4 KYB SSS Fork Swap
• 1993 YZ250 Build: Part...
1993 YZ250 Build: Part 5 Motor going back in the bike
• 1993 YZ250 Build: Part...
1993 YZ250 Build: Part 6 Modern Brakes from a 2006 YZ450F
• 1993 YZ250 Build: Part...
1993 YZ250 Build: Part 7 Keihin PWK Carb
• 1993 YZ250 Build: Part...
1993 YZ250 Build: Part 8 Linkage and Swing Arm Rebuild
• 1993 YZ250 Build: Part...
#dirtbike #restomod #yz250