6 Big Losses in Manufacturing | TPM 6 BIG LOSSES | How to Eliminate 6 BIG LOSSES BY TPM (हिंदी में)

  Рет қаралды 24,581

AYT India Academy

AYT India Academy

Күн бұрын

TPM SERIES VIDEO-03
6 Big Losses in Manufacturing | TPM 6 BIG LOSSES | How to Eliminate 6 BIG LOSSES by TPM (हिंदी में)
Developed in 1971 at the Japanese Institute of Plant Maintenance, the Six Big Losses in manufacturing have been used as a way to categorize equipment-based losses and maximize overall equipment effectiveness. The six big losses can be split into three general categories- Availability, Performance and Quality losses. The Six Big Losses are a very effective way to categorize equipment-based losses.
, to see how to identify & Eliminate 6 Big Losses Please watch the complete Video.
1971 में जापानी इंस्टीट्यूट ऑफ प्लांट मेंटेनेंस में विकसित, विनिर्माण में छह बड़े नुकसान का उपयोग उपकरण-आधारित नुकसान को वर्गीकृत करने और समग्र उपकरण प्रभावशीलता को अधिकतम करने के लिए किया गया है। छह बड़े नुकसानों को तीन सामान्य श्रेणियों- उपलब्धता, प्रदर्शन और गुणवत्ता के नुकसान में विभाजित किया जा सकता है। छह बड़े नुकसान उपकरण-आधारित नुकसान को वर्गीकृत करने के लिए एक बहुत प्रभावी तरीका है।
6 बड़े नुकसानों को कैसे पहचानें और कैसे दूर करें, यह जानने के लिए कृपया पूरा वीडियो देखें।
Our Website: www.aytindia.com
----------------------------------------------
For more details and other videos check Following:
MyKZfaqChannel: / @aytindia
Lean Manufacturing Training Videos: • LEAN Manufacturing
7 Quality Control Tools | 7 QC TOOLS | 7 Basic Quality Tools or Problem Solving Tools (हिंदी में) : • 7 Quality Control Tool...
What is TIMWOOD 7 Waste in Lean Manufacturing in Hindi (हिंदी में)| TOOL for COST REDUCTION by 50% : • What is TIMWOOD 7 Wast...
What is KAIZEN CONCEPT of LEAN: Continuous Improvement in Hindi (सीखे काइजन निरंतर सुधार हिंदी में) : • What is KAIZEN CONCEPT...
Howto Install, Use AAROGYA SETU APP आरोग्य सेतु APP क्या है और इसे कैसे इस्तेमाल करे FIGHT CORONA : • Howto Install, Use AAR...
---------------------------------------------------
Music: www.bensound.com
-------------------------------------------------------
About Myself: Shakir Mohd (B.TECH)
• I am a B.Tech in Mechanical Engineering
• I have total working Experience of Around 7 Years in Training, Execution and Implementations of Various Lean Tools and Techniques (such as VSM, KAIZEN, TPM, 5S, Visual Management, Poka-yoke, SMED etc.) in approx. 100 Units.
• I have a wide exposure for Implementation of Lean Manufacturing Tools & Techniques to different industries like Automobile, Engineering, Food Industries, Leather Handicrafts, Leather Garments, Garments, Printing, Packaging, Shoes Industries, Plastic Injection Moulding, Aluminum Die Casting, CNC Machining, Conventional Machining, Tool Room, Press Shop, Fan Industry, Bicycle Industry, Fabrication & Sheet Metal etc. for improving their Productivity, Reducing Manufacturing cost & Rejection, 5S Levels, Employees Trainings with proper resource utilization and Implementation of various Kaizens (Improvements).
Key Skills:
• Value Stream Mapping (VSM), TIMWOOD (Seven Wastages), PQCDSME (Seven Benefits) Productivity Improvement, Time & Motion Study,
• TPM (Total Productive Maintenance), FUGAI Tags, 8 Pillars of TPM , Elimination of Six Big Losses (SSSMCB) through TPM
• 5S, KAIZEN, 7 QC Tools, VA/NVA Activities, Root cause analysis, SMED, Safety Improvements, Visual Management, etc.
----
SOME OF MY ONSITE PROJECTs OF TRAINING & CONSULTANCY, COMPLETED/ UNDER-PROCESS ARE:
Ultratech Cement (4 Plants)- Truck Turn Around Time (TAT) Prject
Combit Shoes, Bahadurgarh (HR)- Plant Layout Setup Project
Printsmith (Infinity Advertising Pvt. Ltd.),Faridabad
MSME- Faridabad Engineering Cluster No.1 (9 Units)- LMCS Cluster
MSME- Faridabad Engineering Cluster No.2 (6 Units)- LMCS Cluster
MSME- Faridabad Engineering Cluster No.4 (7 Units)- LMCS Cluster
MSME- Yamuna Nagar Engineering & Fabrication Cluster (9 Units)- LMCS Cluster
MSME- Ludhiana Cycle Parts Cluster No.2 (7 Units)- LMCS Cluster
MSME- Manesar, Leather Handicraft Cluster No.1 (7 Units)- LMCS Cluster
MSME- Bahadurgarh Footwear Cluster (6 Units)- LMCS Cluster
MSME- GZB Food Cluster (9 Units)- LMCS Cluster
Raga Engineers- Core Pins Productivity Improvement Project, Faridabad (HR)
Raga Engineers- Crack Toyota Project, Faridabad (HR)
Technomech Industries, Faridabad (HR)
Woodpecker Systems, Faridabad
Falcon Vacuum Pumps, Faridabad
Welcome Footwear, Bahadurgarh
RKP Packers, Delhi
Presto Stantest Pvt., Faridabad
United Cores Private Limited, Faridabad
PMT Engineers, Faridabad
UD food Products Pvt. Ltd., Ghaziabad
GK Industries, Faridabad
Durga Engineering Works, Faridabad

Пікірлер: 31
@waseemahmad3777
@waseemahmad3777 4 жыл бұрын
Nice Information
@obendrayadav3099
@obendrayadav3099 2 жыл бұрын
Nice sir
@ankit_450
@ankit_450 4 жыл бұрын
Good
@Ronduck7
@Ronduck7 Жыл бұрын
Good information sir
@aytindia
@aytindia Жыл бұрын
Thank you !!! Keep Watching and sharing
@DeepakKumar-123.
@DeepakKumar-123. 3 жыл бұрын
aap bahut hi acche tarike se samjhate ho very nice .sir...
@aytindia
@aytindia 2 жыл бұрын
Thanks
@madanlalkalia7646
@madanlalkalia7646 3 жыл бұрын
Great Sir , nice and knowledgeable
@aytindia
@aytindia 3 жыл бұрын
Thanks for your feedback. Keep watching and sharing
@SKsinghania95
@SKsinghania95 2 жыл бұрын
Nice Knolage sir
@saurabhsingh9316
@saurabhsingh9316 4 жыл бұрын
thanks for making every topic easy.......thanks sir...plz make more videos......
@aytindia
@aytindia 4 жыл бұрын
Thanks and Sure..
@Aashishthakur11
@Aashishthakur11 3 жыл бұрын
Its nice, very easy to understand
@aytindia
@aytindia 3 жыл бұрын
Thanks
@M.E.786
@M.E.786 Жыл бұрын
Great Sir, sir you look like shoaib akhtar of pakistan
@aytindia
@aytindia Жыл бұрын
Thanks and Keep Watching
@tkpicture9495
@tkpicture9495 3 жыл бұрын
Sir ppap and msa 5 core tool ke bare me v btaye
@hamidraza4958
@hamidraza4958 Жыл бұрын
Sir,16 losses in Production ka v video banaye plz...
@AkashDixit-ik1ez
@AkashDixit-ik1ez 3 жыл бұрын
Sir OEE par bhi ek separate video baniye.
@aytindia
@aytindia 3 жыл бұрын
kzfaq.info/get/bejne/hqpdh7N9kpvSdZc.html
@aytindia
@aytindia 3 жыл бұрын
kzfaq.info/get/bejne/hqpdh7N9kpvSdZc.html
@NationalTV552
@NationalTV552 Жыл бұрын
👇👇👇👇👇👇👇👇👇👇👇👇👇👇👇👇👇👇 👉MHRA (medical and health products regulatory Agency) sir is pr bhi video bnaye 👆👆👆👆👆👆👆👆👆👆👆👆👆👆👆👆👆👆
@aytindia
@aytindia Жыл бұрын
sorry iske baare me abhi jankari nhi h
@kpeditingcreator6331
@kpeditingcreator6331 2 жыл бұрын
Me ek company me kam karta hu mene ek consept nikala he manager model machine karke , so jo TPM, oee , etc.. aap ke sab video dekhe mene or mujhe esi bare me aap se bat karni he sir
@aytindia
@aytindia Жыл бұрын
Pl send mail on smohd@aytindia.com
@somnathbhand7258
@somnathbhand7258 2 жыл бұрын
1 unplanned stop me 1 galti lag rahi hai aap bol rahe hai maintenance vale aaye aur bole Humein maintenance karna hai machine khadi kardo yes kaise hota hai , company ka planning hoga na ke kab machine maintenance karni hai Har machine ka mentainance plan schedule hota hai
@trickymathematics..6036
@trickymathematics..6036 2 жыл бұрын
Pdf provide kra do
@kishornagare5853
@kishornagare5853 Жыл бұрын
Display found blurr sir
@aytindia
@aytindia Жыл бұрын
check your net speed please
@kpeditingcreator6331
@kpeditingcreator6331 2 жыл бұрын
Sir mujhe aap se ek kam he kya aap ka number mil sakta he sir
@aytindia
@aytindia Жыл бұрын
7011382316
Now THIS is entertainment! 🤣
00:59
America's Got Talent
Рет қаралды 38 МЛН
Alex hid in the closet #shorts
00:14
Mihdens
Рет қаралды 10 МЛН
Mom's Unique Approach to Teaching Kids Hygiene #shorts
00:16
Fabiosa Stories
Рет қаралды 23 МЛН
16 LOSSES in manufacturing | TPM 16 LOSSES | OEE LOSSES
21:37
Lean Seekho
Рет қаралды 9 М.