Aluminium panel slab formwork - EVODECK [EN]

  Рет қаралды 10,145

INTERFAMA GMBH - SRL

INTERFAMA GMBH - SRL

3 жыл бұрын

The EVODECK system is a universal element slab formwork system made of aluminium. This system is suitable for different types of ceiling such as: solid concrete, floor slabs (panelled surfaces), mixed floor (concrete and masonry) and lightweight slabs.
This lightweight panel slab formwork enables effortless working from floor-level. Fast assembly and disassembly are guaranteed, accompanied by easy to handle and lightweight system components. The low individual weight of the elements (max. of 24 kg) and practical dimensions of the elements favour ergonomic work on the construction site.
The system is available with two different prop heads, the fixed head, and the drop head. Both can be mounted on all common types of props. The fixed prop head can be used for the shuttering of the slab formwork and also serves as a support for wall areas and corners. The drop-head construction instead permits early stripping already after 2 to 5 days from the casting, always depending on the strength of the concrete. Therefore, most of the formwork equipment can be reused right away in the next concrete operation, thus on-site material requirements are significantly reduced.
This aluminium slab formwork is used for various areas of construction (residential houses, office buildings, industrial buildings, etc.) and any height and ceiling thickness can be realized.

Пікірлер: 1
@loyakhangembam2399
@loyakhangembam2399 2 жыл бұрын
Price please
Step by Step - Assembling aluminium Formwork
14:38
FORSA USA
Рет қаралды 2,8 М.
Cool Items! New Gadgets, Smart Appliances 🌟 By 123 GO! House
00:18
123 GO! HOUSE
Рет қаралды 16 МЛН
THEY made a RAINBOW M&M 🤩😳 LeoNata family #shorts
00:49
LeoNata Family
Рет қаралды 41 МЛН
DAD LEFT HIS OLD SOCKS ON THE COUCH…😱😂
00:24
JULI_PROETO
Рет қаралды 13 МЛН
Cat Corn?! 🙀 #cat #cute #catlover
00:54
Stocat
Рет қаралды 15 МЛН
Kumkang Aluminum Formwork 3D presentation
5:59
Kumkang Kind Co., Ltd
Рет қаралды 33 М.
Drop Head Shoring System FORMADECK - ULMA Construction [en]
5:21
ULMA Construction
Рет қаралды 23 М.
How to pour and finish concrete like a PRO! - The Barndominium show E127
17:05
Texas Barndominiums
Рет қаралды 372 М.
aluminium-formwork-manufacturers in india
9:17
Mfs Formwork
Рет қаралды 21 М.
GETO Aluminium Formwork Animation
6:08
Connie Wisdom
Рет қаралды 50 М.
PRODUKT I PERI ALPHADECK aluminiowe deskowanie stropowe
5:54
PERI Polska
Рет қаралды 37 М.
MevaLite [US]
2:00
MEVA Schalungs-Systeme
Рет қаралды 16 М.
MIVAN Shuttering Procedure I 7 days Slab Cycle I aluminium formwork
13:02
Сколько реально стоит ПК Величайшего?
0:37
Battery  low 🔋 🪫
0:10
dednahype
Рет қаралды 11 МЛН