Рет қаралды 13,323
Originally installed in 1985-1986 by Mitsubishi. These are the internal elevators which serves the lower floors of the hotel. The upper floors are served by the exterior elevators.
*Wishes a Merry Christmas!
Capacity: 23 Persons/1565kg
Floors served: 1-4, 5-21*, 22 (22 floors)
Year installed / modernized: 1985-1986 / ?
History: Modernized by 9G Elevators
(*) Keycard required
Ride quality: 10 / 10
****
Camera: Nikon Coolpix S800C
Taken date: November 30, 2015
(C) 2015 IDLift3000 Productions