Рет қаралды 38,472
BNSF Manifest freight train through Sacramento headed southbound with a UP as a DPU locomotive on the UP Sacramento Sub with BNSF 8356, BNSF 4655, and BNSF 1085 as the head end and DPUs back end UP 3847, and BNSF 4215 passing the Sacramento Northern Railway Bike Trail pedestrain railroad crossing headed south.
Crossing Info:
Location: Sacramento Northern Bike Trail, Sacramento California.
Horn Setting: Horn Zone
Crossing Owner and Maintainer: Union Pacific Railroad
Bell Sequence: Bells ring till gates rise
- Signal Right
Bell: WCH Gen 2 Type 1.5 Electronic Bell
Lights: Two pairs of 12x24 inch WCH 2nd Generation LEDs with WCH Lights
Brackets: WCH
Gate Lights: WCH
Mechanism: Safetran
Base: Safetran
- Signal Left
Bell: WCH Gen 2 Type 2 Electronic Bell
Lights: Two pairs of 12x24 inch WCH 2nd Generation LEDs with WCH Lights
Brackets: WCH
Gate Lights: WCH
Mechanism: Safetran
Base: Safetran