Рет қаралды 186
Footage from Highway 32 to Skyway along the Bruce Road corridor. Drone started just south of Highway 32 and recorded footage heading south to Skyway.
Knife River is working on installing storm drain pipe along Bruce Road from E 20th Street to Skyway. Wards Concrete is pouring concrete for the drainage inlet boxes located between Highway 32 and the bridge, along Bruce Road.
© 2024 City of Chico