Рет қаралды 184,517
As the title says, we actually rode and verified if it is possible to ride all 444.2km of Meitetsu lines in one day using the "Meitetsu Train Line 2 Day Free Ticket"! Please enjoy this grueling journey, riding almost the entire line from the first train to the last!
Please watch this video with subtitles displayed.
Translation of the title, description, and subtitles is automatic, so there may be errors in translation.
~Rules of the Full Ride Journey~.
(1) You are free to set the challenge date, start, and goal.
(You may travel to the starting point the day before the challenge and stay the night before at a nearby hotel.)
(2) You may use a method of transportation other than Meitetsu on the way to the destination. Cabs, buses, etc. are acceptable.
(3) Toll trains may be used.
(4) Sections where regular passenger trains do not run, such as freight lines, are excluded from the conditions for achievement.
(5) When a train passes through a station, it is considered to have passed through the station even if it does not pass through a track that is adjacent to a platform, as long as it passes through the station premises.
(For stations such as double track sections, where it is difficult to determine whether a train has passed through a station by the above rules, the criteria for achieving each section are determined based on the route used for fare calculation as specified by each company.)
Correction: Departure time of the 38th train from Nagoya
Error: 21:18 → Correction: 22:18
Blog post
diagram-traveling.com/meitets...
Non-Meitetsu Challenge Travel Videos
Kintetsu Railway Railroad Track Route 1-Day All-Route Trip: • 近鉄鉄軌道路線を1日で全線走破できるのか!?...
Table of Contents
0:00 Opening
1:01 Before departure
2:44 First run
3:47 Explanation of rules
8:25 Introduction of tickets used in this event
11:39 Second run
15:43 Third run
17:19 Fourth run
18:33 Fifth run
20:07 Sixth run
23:43 Seventh run
25:30 8th run
28:56 9th run
30:57 Tenth run
31:11 11th run
34:42 12th run
41:18 13th run
41:54 14th run
45:14 15th run
46:59 16th run
47:38 17th run
51:20 18th run
53:16 19th run
54:46 20th run
55:27 21st run
57:10 22nd run
59:01 23rd run
1:00:00 24th run
1:01:17 25th run
1:09:15 26th run
1:12:02 27th run
1:13:51 28th run
1:16:49 29th run
1:22:30 30th run
1:25:00 31st run
1:25:22 32nd run
1:26:38 33rd run
1:26:52 34th run
1:27:36 35th run
1:28:52 36th run
1:30:26 37th run
1:31:07 38th run
1:33:08 39th run
1:35:34 40th run
1:40:13 41st run
1:41:03 42nd run
1:42:47 Finishing the challenge of running all the Meitetsu lines
1:48:42 Ending
References (including image sources)
Meitetsu (top.meitetsu.co.jp/)
Illustration AC (www.ac-illust.com/)
Geographical Survey Institute, Ministry of Land, Infrastructure, Transport and Tourism + Additions (www.gsi.go.jp/top.html)
Blog: diagram-traveling.com/
twitter: / sd4lsh
#Meitetsu #All lines in one day #2DAY free ticket for all Meitetsu train lines