Рет қаралды 34,728
As part of the CIVIL @ UL Year 1 Engineering Mechanics module, students were tasked with providing a safe means for a person to cross the KBS / Schuman Pond. Over 11 weeks students, in groups, rigorously designed bridge structures. In the final week, the bridges were assembled and tested before the being brought to the pond where Prof. Tom Cosgrove confidently strolled from one side of the pond to the other on a combination of four bridges (two cable-stayed bridges and two truss bridges).
Well done to all involved!
Note:
Audio track - Infected Mushroom (extra terra mix)