Рет қаралды 5,746
In this video I continue with the lower loop scenic progress and create a hill formation adjacent to the lower loop cutting to establish the correct elevation for the overhead bridge and continuing road.
Music: www.bensound.com
0:00 Introduction
1:04 The area explained
4:17 The material
4:52 Cardboard template
6:42 Test fitting
8:30 Overhead bridge elevation
11:05 Glueing polystyrene layers
12:19 Carving/shaping the hill
16:54 Carved hill in position
18:12 Conclusion