If we were roughing in multiple buildings on a project, are we required to install a ground rod at each one? Are we required to bond our neutral conductor and grounding conductor at each location as well? In this latest episode of Electrician U, Dustin takes a look into the requirements for each of these to shed some light on the subject.
🤘⚡️MEMBERSHIP⚡️🤘
JOIN ELECTRICIAN U - become a member and get:
FREE Continuing Education every year
FREE Practice Exams
FREE Monthly Video Courses
FREE Weekly Live Instructor-Led Classes
FREE Monthly Educational Newsletter
Premium Members-Only Content
Private Discord Channel
Monthly Members-Only Discord Chats
Sign up here --- www.electricianu.com/electric...
🎧🎹MUSIC AND VIDEO:🎹🎧
/ descantmv
🎬✍️ART AND ILLUSTRATION:✍️🎬
www.daverussoart.com
Article 250.32 of the 2020 NEC governs buildings or structures supplied by a Feeder or Branch circuits. Under the exceptions to 250.32(A), the code states that a Grounding Electrode is NOT required in a building supplied with a single branch circuit (including multiwire branch circuits) IF that branch circuit includes an equipment grounding conductor. So, if we were supplying a separate building from our main building with a circuit for a light or a receptacle or something like that, as long as we included an equipment grounding conductor with our run.
Feeders are slightly different. Again, article 250.32 covers this, but we will be using part (B) for feeders. If we are supplying this separate building with a PANEL that will provide power for things within it, then we are to install an equipment grounding conductor WITH our feeder, and it needs to also be connected to the Grounding Electrode. In addition, part A of 250.32 does require a grounding electrode system and conductor (we used the EXCEPTION when talking about branch circuits!) to be installed. So, if it’s going to be a brand-new slab, we will be required to install our grounding system just like a normal commercial building would (Ufer, Building Steel, Cold Water, Ground Rod, Etc.). The equipment ground carried in our feeder is used to BOND the parts and the grounding electrode system still must be established!
Article 250.32 (B) also states “Any installed GROUNDED CONDUCTOR (Neutral) shall NOT be connected to the equipment grounding conductor or to the grounding electrode(s). So, this tells us that our neutral and ground should NOT be bonded together at our new building, as it is already bonded together at our service. Remember from previous videos, that Dustin established the bond is needed at ONE point only to complete the loop so that the OCPD can sense a LARGE current flow and trip. But we do not want to establish that bonding point twice and creating a choke point. That complete loop for a ground fault needs to happen RAPIDLY and since there are no motors, panels etc. to give us any resistance or loads to go through, the resulting current flow is massive (but very short lived) allowing the breaker to do its job and trip.
So, to recap, if you are installing a new building from an existing one, you are NOT required to install a grounding electrode if it is fed from a Branch Circuit. We ARE required to install a grounding electrode if it is being fed with a Feeder. And we do NOT want to rebond our ground and neutral at the new building as this bond is already made at the source building.
We hope this has been helpful in understanding where we are to install grounding electrodes and Neutral/Ground bonds. Is there a topic you would like to see discussed here on Electrician U? Leave a comment in the comment section below and let us know! Please continue to follow Dustin and Electrician U as we are constantly adding new content to assist our followers in becoming the best electricians that they can be!
#electrician #electrical #electricity #terms of trade #electrician exam # journeyman tips

Пікірлер: 269
@jakesully5402
@jakesully5402 2 жыл бұрын
I’m a licensed electrician. The more I learn about grounding and bonding, the more I realize I don’t know much about it. Grounding and bonding is incredibly complex. Nice video, Dustin !!! As usual, very informative. Cheers.
@bigbangcesar
@bigbangcesar 2 жыл бұрын
Extremely informative and well taught. You sir, have a gift from God to teach aside from being a tradesmen.
@benmardis8237
@benmardis8237 2 жыл бұрын
Just got my masters license two weeks ago, and I’ve been watching you ever since I got into the trade! You helped me out a ton with all the videos along the way! Thanks for all you do Justin
@erich1380
@erich1380 2 жыл бұрын
Justin 😂
@benmardis8237
@benmardis8237 2 жыл бұрын
@@erich1380 damn j ain’t even close to d 😂 I forgot
@jordanarreola9339
@jordanarreola9339 Жыл бұрын
Justin Seltzer
@albduke
@albduke Жыл бұрын
​@@benmardis8237 Master blaster
@PepperStone3
@PepperStone3 2 жыл бұрын
Today I learned what haberdashery means. But seriously, you are paving the way to my license and to become a well rounded electrician. Thank you, Justin, really.
@jeff-w
@jeff-w Жыл бұрын
Read your comment and was on the edge of my seat till the end of the vid.
@DaddyBeanDaddyBean
@DaddyBeanDaddyBean 2 жыл бұрын
There are lots of videos that explain how grounds & neutrals should not be bonded at a sub panel, and how subpanels in a separate building require their own grounding electrodes (whether a rod or concrete encased etc). Few of them explain *why*. Thank you sir.
@connecticutaggie
@connecticutaggie 2 жыл бұрын
Nice explanation. I am so glad to hear your explanation of the code requirements for this. While I am not as good on code, I am an Electrical Engineer and I can explain why you don't want to bond the neutral to the ground in more than one place. In your example, the neutral (white) is bonded to ground at the main building and is run to the out building. That neutral wire will have current passing through it because of the load from the out building and thus its voltage will be different. Also, because of the inductance of the wire and because the wire is long, the voltage on it (both in phase and amplitude) will be different from the ground (which should have not current flowing through it). Thus, if you connect the neutral and the ground at the out building you will introduce a current in the ground. This can be a safety hazard. This issue is called a "ground loop" as you can see that the ground and neutral connected at both ends makes those wires into a circle (loop) that current can flow through.
@electricalron
@electricalron 2 жыл бұрын
The neutral conductor will carry the unbalanced load current from the sub panel back to the main breaker panel. The neutral is still a GROUNDED conductor and is "neutral" between both UNGROUNDED 'HOT' LEGS in a 240/ 120 volt 4-wire set of feeders.
@richardwallace2182
@richardwallace2182 2 жыл бұрын
@@electricalron The unbalanced load on the neutral does not correct a ground loop though.
@connecticutaggie
@connecticutaggie 2 жыл бұрын
@@electricalron I agree that is how it works as long as you do not connect the ground to the neutral at the out building - which you should not do. All I was doing was explaining why - because though the neutral is still grounded, the inductance in the wire plus any unbalanced load will cause the neutral to be different from the ground at the out building.
@jdilksjr
@jdilksjr 2 жыл бұрын
Also, with the ground and neutral tied together at both ends you have turned that length of ground wire into a second neutral and the current that would normally flow on the neutral will now split itself between the two wires.
@MicahFunk
@MicahFunk Жыл бұрын
@jdilksjr and I might add that having current flowing on the ground has the potential to energize anything connected to that ground wire. That's an accident waiting to happen, and someone who touches an energized equipment case is going to get really pissed, shocked, or electrocuted. One or two of these results may have a secondary effect of someone else getting their ass kicked while being cussed out.
@MalTheProphet
@MalTheProphet 2 жыл бұрын
I wanted to let you know your passion for this is amazing and I’m glad for it.
@kieranneal8359
@kieranneal8359 Жыл бұрын
Although I was mostly just looking for info to make sure i was satisfying NEC requirements for a set of small greenhouses we have with new power, the last 5 minutes of this video was the most informative information regarding grounding vs bonding I have ever come across. Thank you.
@brianmcdermott2430
@brianmcdermott2430 10 ай бұрын
Great info. Clearing up a lot of questions. Thank you.
@Jakevrana
@Jakevrana Жыл бұрын
I really appreciate your explanations. When I was a worm apprentice my journeyman was a great teacher. He was patient and drew things out like you do and took the time to explain to us worms. He’s a master now and has his own company doing well, so I’m glad to see there are teachers like you and him out there. Being a sparky, there’s a lot to know
@OriaXu
@OriaXu Жыл бұрын
Very good video! Thanks! My meter is on the outside perimeter wall and to connect my house, my "electrician" actually told me i should bond the neutral/ground at both the meter and in the house panel... i sounded wrong but since i am only a hobby electrician, i assumed he knew what he was talking about! There is so much bs about grounding and bonding! So thank you for all your videos!
@altuber99_athlete
@altuber99_athlete 2 жыл бұрын
Amazing channel, love the highly detailed content! For the next video, could you please talk about separately derived systems (like stand-by generators), and whether they need ground rods or not, and whether their neutral needs to be bonded to the enclosure? Thanks.
@djhatton6858
@djhatton6858 Жыл бұрын
Good. Thanks for continue to discuss return path thru earth doesn’t trip breaker . Regarding the other video with energized ground rod I was hoping someone would repeat but add a 3 point resistance to ground on ground rod. Then measure current flow and see how v=ir is. I’ve used the video in my explaining
@fredbrown7954
@fredbrown7954 2 жыл бұрын
Nice Job with this explanation and use of Art 250.32 😊
@rogerpeterson4816
@rogerpeterson4816 Жыл бұрын
During the storm season in California, I have wired a 13K watt generator to a manual transfer switch to run certain loads. The generator has a floating neutral but the manual says to bond the generator frame to the neutral wire as well as drive a grounding conductor in the ground. The 240 volt plug going to the receptacle that connects to the transfer switch ultimately (as you know) connects to the service panel. My question is, "why would I bond the neutral to the ground and frame of the generator as well as stick an additional grounding electrode in the ground?". Thanks and enjoy the whole series! Roger Peterson, Monterey, CA
@rafalszachnowicz2831
@rafalszachnowicz2831 2 жыл бұрын
Good. Good. Good. That's the important topic. More about it. Always. Thanks so much!
@Paulilmys
@Paulilmys 2 жыл бұрын
Love your channel! Such great info.
@Deejonamoo
@Deejonamoo Жыл бұрын
We had a job once where we were installing a sub panel in a shed that was directly adjacent to house. The main panel was about 10 feet away and there was less than two feet of space between these buildings. We didn’t run a separate ground because our lead misunderstood the code but when the inspector came out and mentioned it he took a 2x4 and nailed it up between the buildings so they could be considered the same structure. The inspector laughed and passed it. I’m pretty sure the homeowner took the stupid board down as soon as we left but that’s not on us I guess.
@loromachaco1
@loromachaco1 Жыл бұрын
awesome explanation. simple and to the point. thank you.
@JJ-ix3sm
@JJ-ix3sm Жыл бұрын
Thank you so much for you info and time. You will always be blessed like all good ppl. Thanks again
@vince6829
@vince6829 2 ай бұрын
Thanks for sharing your knowledge.
@JamieStuff
@JamieStuff 2 жыл бұрын
Speaking as an EE, you can't have too many grounding electrodes. If there's *any* question, put in another ground rod. You want that green conductor to be as close to earth potential as possible, which is why it's not bonded to neutral anywhere other than the main panel. Neutral wires carry current, wires have resistance, and current through a resistance has voltage. The part about not using the earth as the grounding conductor reminded me of what I used to do as a teen when I wanted to go fishing. (Don't try this at home.) I'd water a bit of the yard, push a steel rod about a foot or two into the ground, and connect that rod to 120V. In a few minutes, the worms within about 5 feet of the rod would be wriggling on the surface, where I would just pick them up.
@oliverlawrence8036
@oliverlawrence8036 2 жыл бұрын
👀 Hmmmm sounds like a good idea though 🤔🤣
@christopherworks400
@christopherworks400 2 жыл бұрын
What creative teen the fished didn't try that at lest once.
@kevinpwayne
@kevinpwayne 2 жыл бұрын
./Sigh
@nobadmojo70
@nobadmojo70 2 жыл бұрын
Why would you not want the most efficient path back to the source? In this application it seems excessive grounding electrodes will prohibit the ground fault from being detected and opening the circuit, increasing the risk of being shocked.
@MrGatlin98
@MrGatlin98 2 жыл бұрын
What happens if you stood on that ground...barefoot?
@mikekennedy3173
@mikekennedy3173 Жыл бұрын
Very nice explanation of ground and neutral to Sub panel. really good.
@srira7910
@srira7910 Жыл бұрын
Great tutorial, colors and your ability to simplify the code (black ink on white paper) is very helpful. We've read papers on ground current running back to the Utility company, via the neutral connection. Would be helpful if you were able to elaborate on that, and perhaps dispel myths or misconceptions about it.
@valmikg1
@valmikg1 2 жыл бұрын
Very fascinating! Thank you!
@nonyadamnbusiness9887
@nonyadamnbusiness9887 11 ай бұрын
Very nice to see someone actually referencing the NEC.
@phildegruy9295
@phildegruy9295 2 жыл бұрын
Excellent video and excellent explanation!
@dustind292
@dustind292 2 жыл бұрын
Here in GA, we have to put a grounding electrode in every pole. When we do new pole locations, this is the biggest thing they want to see. We have to bond to the rebar cage and show this before we can pour concrete. Then we have to take the EGC and bond it to the pole itself, to the grounding electrode, and to the EGC going up the pole.
@guynxtdork
@guynxtdork 2 жыл бұрын
Thank you Mr. Stelzer. Thank you.
@rodolfovesga979
@rodolfovesga979 2 жыл бұрын
Awesomeness!!! Great code book Information!! Keep them coming lol!!!
@Technie87
@Technie87 Жыл бұрын
For the longest time I always thought that the ground rod would take the load first as it is the closest circuit. However, as you have mentioned the connection to the transformer is the lowest impedance circuit there is so it actually takes that(with some very small current I suppose going to ground). THUS bonding neutral to ground is vital as it will also coincidentally trip the breaker on the way out. Amazing information!
@felixgarcia4900
@felixgarcia4900 11 ай бұрын
Very clear the answer thanks
@Crazypug-eh7xi
@Crazypug-eh7xi 2 жыл бұрын
Outstanding explanation
@tomferrin1148
@tomferrin1148 2 жыл бұрын
A similar situation exists where the "external structure" is a well pump house. Usually the pump house is fed using only a single (often 240v) branch circuit, in which case the exception clause of 250.32 applies and a grounding electrode is _not_ required. But I've always errored on the side of caution in this situation and installed a separate grounding electrode. It only costs a few dollars more but I believe significantly increases the safety factor.
@mikeclarke3005
@mikeclarke3005 2 жыл бұрын
if new install I usually try install a sub panel in some well houses, pump on a separate 240V breaker, service outlet in case heating needed other use, and light on a separate circuit (4 slots) and a few install permanent 240V heating also so...
@DanielL143
@DanielL143 11 ай бұрын
Excellent; all I would add is that, additional ground electrodes (earth connections) can be added to provide additional support for electronics/radio and communications equipment etc. or to create equipotential environments for step and touch potential mitigation, static electricity mitigation etc. (all special applications) - BUT - all ground electrodes must be BONDED together in a Single-point grounding topology (think of the branches or roots of a tree) which runs back to the panel and with no double-bonding of neutral to ground anywhere in the system. The IEEE Emerald standard speaks to these special applications while being completely compatible with the NEC. NO isolated grounds please - they will cause problems. Also for those who might be interested Motorola developed the PANI system for segregating dirty and clean grounds for highly specialized telecom and computer applications. For the electronics engineer or technician, grounding is a big topic. This was a great coverage of the code aspects and perfect for the guy or gal who just wants to run power to his garage, barn, etc. for ordinary purposes. The video was informative and accurate. When all is done, you can check for neutral to ground potential and for objectionable current flowing on bonding conductors as part of a power quality audit. Using a ground resistivity meter can help verify that you have an effective grounding system. Obtaining say 1 or 5 ohms to ground is an engineering objective for certain sensitive applications (not your ordinary garage necessarily). Other special rules apply to bonding gas appliances, fuel tanks, around water meters etc. Stray voltages can be created by neutral return current flowing through the earth back to the transformer on the street (or wherever) due to the nature of our neutral-grounded power distribution system. Animals might be sensitive to stray voltage and special methods can be employed to mitigate this phenomenon. Lightning rods used to protect a building also have special engineering, construction and code requirements. Generators and transfer switches also have special grounding and bonding requirements. Devices inside electronic equipment such as SPD/TVSS, GFI's and EMI/RFI filters, even good old fuses and breakers will rely on good earthing and bonding practices to perform some of their functions - mitigating transients and noise in both Normal and Differential mode and quickly isolating fault currents. Make sure all utility cables (TV, phone, hydro etc.) are all bonded together at a common point. Termination to ground, of shield wires in communications and control systems cabling is highly misunderstood and is a whole separate topic. I've had great success with installing a 10 ft x 3/4 inch copper clad UL rated ground rod in a well of ground enhancement material (several brand names exist). Stay away from galvanized ground rods. Space electrodes properly and use rods over plates where feasible. Use good quality connections like UL rated crimp-on devices or exothermic welding to make your connections. Install rods in an inspection well where feasible. Make sure that the ground electrode conductor running back to the panel and the bonding conductors are of sufficient AWG. Avoid making loops in your bonding topology. Lots to know about grounding and bonding. Knowledge and understanding of both theory and practice are the keys. Good engineers, techs and electricians do not discount either - theory and practice should converge if you know what you are doing. In the end Safety is the priority. Just knowing the code is not always enough. Remember that the code is a minimum requirement for safety (mostly fire and shock). Crack open those textbooks and understand the electrical theory behind what you are doing. Other parts of the world have different grounding standards and systems and so if you have purchase a milling machine made in China, you may want to look at the electrical schematics first. Always remember that electricity, like water, will take every path it can - not the path of least resistance (a dangerous myth). It will happily run through your body to the earth and kill you if you give it a chance. Wear insulated work boots and gloves where required and don't assume that a ground wire does not have current running through it. Thinking that touching ground wires is always safe, might be your only and last mistake (documented fatalities have occurred where disconnecting a ground wire from an electrode while the neutral was bad and all of the load current was returning to the transformer through the ground). Stay curious, always ask why I am I doing this, this way and is it code compliant a a minimum; use PPE good quality tools and materials with the proper ratings. This channel is an excellent resource; please keep making videos and thank-you. Happy grounding. Daniel Lawlor.
@mikejoe6076
@mikejoe6076 2 жыл бұрын
Hello dustin my elec instructor, can you do a full video on panel branch cct balancing ,what appliances and rooms you would put on the L1 (A)and L2 (B) phase in a single phase domestic system for the lowest neutral current.
@mr.c3928
@mr.c3928 Жыл бұрын
I love this teacher!
@kenf2662
@kenf2662 2 жыл бұрын
Like my steel out building (shop). Yes, Un-Bonded at the sub-panel. Its great with a metal building that has conduit.
@spelunkerd
@spelunkerd 2 жыл бұрын
Great response. I wired a greenhouse beside a main building last summer, here in Canada. The greenhouse was fed by two circuits from the main building panel, with a system ground wire from the main building which was not attached to the metal of the greenhouse. There is no disconnect at the greenhouse. It was located about 50 feet away from the ground rods for the home. Our electrical code is a little vague, so before I poured the concrete pad I laid in a ground plate, and I attached that to both the building and the feeder ground wire. To my surprise, the inspector required me to disconnect the grounding electrode from both the greenhouse frame and the ground wire from the home before he would pass it. His concern was something about stray currents between the two grounding electrodes causing issues.
@rupe53
@rupe53 2 жыл бұрын
that's because you only have branch circuits, not a true feeder with a panel. In many areas they might still ask that the building metal and slab rebar be bonded to each other, and then to a ground rod... but NOT tied to the electrical. (unless there's a panel)
@kevinmach730
@kevinmach730 2 жыл бұрын
If I recall, in the US you're only allowed one feeder to an outbuilding, with a few exceptions. They would want us to put in a subpanel at that point and then run out multiple circuits from there.
@rupe53
@rupe53 2 жыл бұрын
@@kevinmach730 ... in hindsight, those two circuits may be a run of 12/3, in which case a shared neutral would actually be 240 volts. IOW, qualify as a feeder rather than 2 separate branch circuits. Two conduits and two different breakers might slide, but I would be asking the local inspector if that would pass code.
@kevinmach730
@kevinmach730 2 жыл бұрын
@@rupe53 I considered something similar for my own outbuilding, but since it just didn't make sense to go through all that work to only have the power provided by 12awg wire. A few people reminded me the work is same more or less either way, if you have the space in your main panel, might as well opt for a small sub panel in case your needs change later. I am glad I listened, because I was able to add a 240v breaker for a heater and air conditioner. Edit: Obviously, the wire was double the cost. and highway robbery at current prices. Plus I needed schedule 40 conduit, which you would get away without if you ran UF. But in my area, that requires digging down 2 feet as opposed to 17 inches.
@rupe53
@rupe53 2 жыл бұрын
@@kevinmach730 ... yes, it costs more, but in the long run you get MUCH more for a similar effort on the job. It's just a typical case of pay me now or pay me later to do it again.... so why bother with the shortcut.
@petercampbell4220
@petercampbell4220 Жыл бұрын
Mike holt did the nutty thing hooking up 120v to a 10 ft and 20 ft rod. Not enough to trip small breaker.
@felixgarcia4900
@felixgarcia4900 11 ай бұрын
Thanks Justin
@doublet9212
@doublet9212 2 жыл бұрын
I install signs for a living. We typically only install ground rods for signs that have electronic message boards. Mainly for “warranty” purposes but in actuality it’s for peace of mind on the boss’s end haha.
@eugenepohjola258
@eugenepohjola258 8 ай бұрын
Howdy. Yes. In older systems where the riser/feeder uses the same wire for ground and neutral a soil electrode at the aux. building is absolutely mandatory. In a newer system with separate ground and neutral the electrode is not so important if the riser is very short, say 40 feet or less. Bonding of conductive parts is essential in the aux. though. But yes. The Code says there shall be an electrode. If there is just a branch to the aux. to feed a few sockets, bonding of conductive parts is highly recommended. No matter if the branch is an old 2 wire or a newer 3 wire cable. Regards.
@stevekluesner4430
@stevekluesner4430 Жыл бұрын
A couple of points that I would add to what was covered (just an amateur who has some experience in these things) ; as a basic point of clarity , the primary reason for the installation of a grounding leg being installed as part of your circuit(s) is for it to pick up stray current/arcs/sparks(ing) that do not find their way to the neutral or register as an overload within the general parameters of the typical operation of the circuit ; that can be a stray current which originated from the supply circuit or as with the case of lightning it could be of a point of origin from outside of the intended design (in which case we could be talking about an amount of energy far in excess of the capacity that your system is designed for) the grounding system is there to allow for/provide a means to at least aid in providing a point of discharge for that stray current and/or potential excessive overload , it's not intended to be a main active conductor during normal operation. One other thing that I think might be worth mentioning is that the general indication in the video was that "grounding rods" are not "good" conductors (or shouldn't expect to be good conductors) I tend to believe that there's a pretty considerable amount of variability that could exist in that area . A person could put a simple 1/2" or 5/8" ground rod down somewhere in dry soil which as he was indicating may not have a great capacity to conduct , or you may find as I see at times in my area that the electrical service is grounded to a steel well casing in an area where it may only be a few feet to the ground water table and who knows what the soil structure brings to the equation (sometimes this could be the circuit structure without a neutral going back to the incoming supply source ; NOT something I recommend) . But the point to try to address for the purpose of having a smooth functioning system with the basic safeguards being discussed is to incorporate the existence of a grounding pathway sufficient to provide an extra measure of protection from "adverse" system discharge(s) &/or excessive overload but not one which is going to interfere with normal , preferred flow of current through your circuitry. Different areas may tend to have different preferable methods for sizing and installing a grounding system for your area ; as was indicated in the video it's likely to be a good idea to consult with an electrician or inspector in your area if you need help getting it sorted out.
@user-ed1dt1fo8n
@user-ed1dt1fo8n 2 жыл бұрын
Very good video Good information well done
@KevinCoop1
@KevinCoop1 2 жыл бұрын
Another excellent correct video! NEC indicates that you should NOT put ground rods on lighting poles. It came up in a Code class I took several years ago. The consulting engineer in the class got his mind blown when he found out he had been spewing them for years incorrectly.
@PepperStone3
@PepperStone3 2 жыл бұрын
I'm an apprentice so I was just the labor, but about 3 months ago we did exactly that. Rod in a lighting pole. Good to know. happen to know the section in the code?
@sleek55044
@sleek55044 2 жыл бұрын
Great information! Can you clarify this? What if an out building has a sub panel feeding another smaller sub panel in the same out building, would both sub panels require their own grounding rods? Would only the sub panel connected to the main be the only panel needing a ground rod? It is my understanding that only if the sub panel resides in the same building as the main will it not be required to have its own grounding rod. What is correct?
@Gruntled2001
@Gruntled2001 2 жыл бұрын
Dustin, I love you, man, and I appreciate the videos. I just wish you were in the common section a little more, answering questions and such.
@danukepaintball
@danukepaintball 2 жыл бұрын
Awesome as always man. I knew a lot of it but learned a few things. Best on youtube.
@draelon
@draelon 2 жыл бұрын
Been working this issue for weeks since I discovered it with my shelter house. Unfortunately the feeder line from the house to there didn’t have a ground run to it (not to mention he didn’t bother running one from the service connect across the driveway to the main house). Electrician has already come out and it’s planned to all be redone starting the first). This ain’t cheap but I’ll feel better having it done right.
@phildegruy9295
@phildegruy9295 2 жыл бұрын
Just went through essentially the same thing. No ground in the undersized feeder to the metal shop building and no ground rod at the shop building or the house. Now it's been corrected with a new feeder install exactly like shown in the video along with changing out the fire hazard Federal Pacific house panel with a modern one. Agree it's not cheap at all but I'm happy with the work done.
@keything8487
@keything8487 2 жыл бұрын
great video!!!!......have you done one on 10K-65K AIC beakers? and why the difference, and whats inna breaker?
@organicvids
@organicvids Жыл бұрын
For installing pool heater so i understand. Main panel breaker = cut off panel = sub panel with gfi and ground wire to earthing rod = separate meter to measure power usage of heater = pool heat pump heater which case housing has its own separate ground wire to earth? Standard 220 volt wiring through out with boded main panel only.
@randyyanez9629
@randyyanez9629 6 ай бұрын
Great video! Where can I find requirements for this disconnect in the NEC?
@washingtonman375
@washingtonman375 Жыл бұрын
Thanks for the great video, this came up on a job site just this week (in Washington state.) Is there a reason why you drew a disconnect on the outside of the accessory building fed by the feeders? I'm reading 225.32 saying the disconnecting means can be installed inside or outside the building being served. Appreciate your insight!
@clayhughes3263
@clayhughes3263 2 жыл бұрын
A few years ago I ran a 100A sub panel from my house’s main panel out to my shed. It was fully permitted work and inspected by the local city inspector. I’m glad he had never watched this video because there was definitely never any discussion of installing a grounding rod! Now I guess I won’t sleep well until I go install one. 🤦🏻‍♂️🙄😂
@aspensulphate
@aspensulphate Жыл бұрын
Actually, I think you need to install (2) rods.
@malcolmjones520
@malcolmjones520 4 ай бұрын
Thank you
@AngusNB
@AngusNB 5 ай бұрын
Thanks Dustin, great info. There has to be a reason that each building needs a ground rod. What bad stuff can happen if the secondary building subpanel is treated like a subpanel within the main building, no ground rod and bonded ground + neutral?
@masalachaimasta
@masalachaimasta Жыл бұрын
LOLZ at your outro. Nice one.
@foremancoaching3146
@foremancoaching3146 2 жыл бұрын
I try to think about it in terms of a fault at a device needs to trip the upstream breaker. It clarifies the thought process in grounding
@theprofessorfate6184
@theprofessorfate6184 2 жыл бұрын
If you want to pass inspections; Yes. INspectors aren't always up on code.
@franky-uz9pt
@franky-uz9pt 10 күн бұрын
this ground conductor will also help prevent differences on ground potential. have seen computer cable burned out by equipment with a 0.5v ground potential difference.
@TexasCanuck
@TexasCanuck 9 ай бұрын
Wow...I need to fix my metal building, LOL. I had a 100A sub-panel/distribution panel on a pole with L1/L2/N/G from the main in the house. I added a metal building (34x28) on a slap next the panel and actually moved the panel inside my structure. everything is as you show in 250.32(b) but I do not have a grounding rod at the metal building and my ground (green) is not connected to the metal building just to the ground strip in the sub-panel.
@aaron840
@aaron840 2 жыл бұрын
@Electrician U have you used the Combo #1, #2 bits before and what do you think of them, they are found in the Klein 32305 Tool. Also same for the The Klein ET310 what are your thoughts on those?
@Jorgerowland
@Jorgerowland 8 ай бұрын
Hi thanks for your video. Do I need to install a separate ground electrode for my solar panels on the dc side and another on the Ac side?
@Jack_of_1_Trade
@Jack_of_1_Trade 2 жыл бұрын
I agree with Cesar! I would have Simply said treat it as a sub panel & with ground rod
@gregsocha7902
@gregsocha7902 2 жыл бұрын
question: Metal industrial building. 480v 3 wire delta service therefore no neutral coming into building. The 240v transformer has the neutral and grounding conductor bonded to to the metal building. Is a ground rod also required? Awesome channel for a non electrician!!
@porfiriomagana7166
@porfiriomagana7166 2 жыл бұрын
Very nice breakdown, I really love your knowledge share!! As far your drawing, Can’t you just eliminate your disconnect and go straight to your panel?
@DaddyBeanDaddyBean
@DaddyBeanDaddyBean 2 жыл бұрын
IANAE, but I would think there has to be some kind of disconnect, whether a separate switch or a main breaker in the top of the sub panel. Interesting question, looking forward to seeing a better answer.
@RichardMcDonaldJr
@RichardMcDonaldJr 2 жыл бұрын
Great video. I'm in southern Missouri and there are basically no inspections here, except for a few municipalities. I see URD for feeders a lot, with no EGC. They just drive a rod. I fix a good number of these.
@kevinmach730
@kevinmach730 2 жыл бұрын
What sort of issues do they have when setup that way that you are asked to fix them?
@RichardMcDonaldJr
@RichardMcDonaldJr 2 жыл бұрын
@@kevinmach730 no issues to speak of, unless you have a ground fault. I normally get called to fix hack work, and I'm thorough.
@toddkerkhoff4672
@toddkerkhoff4672 2 жыл бұрын
In southern MO are boat docks treated as separate buildings? Boat dock electrocution is a legit problem..
@MrGatlin98
@MrGatlin98 2 жыл бұрын
I'm new. What's URD?
@RichardMcDonaldJr
@RichardMcDonaldJr 2 жыл бұрын
@@toddkerkhoff4672 Missouri has no statewide inspections, and very few boat docks 😁
@bobhill6318
@bobhill6318 Жыл бұрын
Do you have a video about how to install a service discount after the meter? Upgrading our electrical. House now has a main and a sub panel. Want to know how to bond and ground.
@lewy1
@lewy1 Жыл бұрын
I am a lineman and we put ground rods at every transformer and riser, so when my son built his detached garage with a panel I assumed he needed a ground rod , but the inspector (Ontario) said to disconnect it.
@tomassoyweyvon4902
@tomassoyweyvon4902 Жыл бұрын
Dustin should be required Viewing for every Apprentice, excellent info!!!
@bradroberts4255
@bradroberts4255 2 жыл бұрын
What about on a 400 amp service? Installed disconnect at the meter and ran conduit out to a barn with its own 200 amp panel. Can I ground the disconnect at the first set of ground rods or do I need to drive 2 more ground rods out at the barn?
@jubxxxjubz
@jubxxxjubz Жыл бұрын
Hey love the content I work in the solar industry and something I've been instructed to do has been confusing me a bit. I've been told in the past the reason we do this is due to some inspector somewhere in Florida. We do interconnections with generator systems and tap the line side of ATS's to feed disconnects for our sub panels. I've been told that when we do this the PV system becomes a service and that we're supposed to run a ground rod and bond our grounds/neutrals in the disconnect. (Which is fused). Is that correct? The other electricians I ask never really give me a solid explanation. I've always been under the impression that the EGC should be bonded to the ATS and the grounds and neutral separated. Just because the transfer from utility to generator doesn't mean that the PV suddenly becomes a service.
@azzkikin1
@azzkikin1 2 жыл бұрын
Can you do a video explaining how to wire up a RV/travel trailer with shore power (120v) to a panel in the RV? When to bond the ground and neutral, at the rv panel or is that considered a branch panel and you consider the pedestal the bonded panel?
@strehlow
@strehlow 2 жыл бұрын
It would be a sub-panel. The neutral and ground must not be bonded in that, otherwise current flowing in the neutral will be split between it and the grounding conductor, so there will be some potential on "grounded" metal cases.
@link10909
@link10909 Жыл бұрын
I am considering updating wiring for my garage, currently its fed by two hots and a neutral, No ground. Can I replace the fuse box with a breaker box and add grounding rods at the garage without tying it the main house system and still comply with code somehow? From a non-code safety stand point would it increase safety to add a ground at the garage or is there a hazard I am missing?
@highcountry360
@highcountry360 Жыл бұрын
Thank you. I will have to rewatch a few times to understand though 😂
@garyheurich6835
@garyheurich6835 Жыл бұрын
Do you have, or would you do, a video about the use of lightning rods?
@exesion1
@exesion1 Жыл бұрын
Have a question about grandfathered systems. Come across a lot of sub panels with only 1 conductor used for neutral and no ground. Should those have a ground rod installed as well? Inspectors call this one out a lot in my area.
@matt24fc
@matt24fc 2 жыл бұрын
Hey! I'm in florida, and wanted to run this by you, because I have had this argument online before. This is in the case of a Solar system, that is fed by a line-side tap, and not a breaker. Engineering, as well as inspectors, require a lineside tap from the main service panel (bonded) to feed a fused disconnect, which is also bonded. I see it as a "seperate" 1st means of disconnect, due to the inspectors and engineering. We are using pierce taps on the service lines on the line side of a main service panel, so upstream of the main disconnect. So we are branching unfused lines from the meter, creating a secondary system. Sorry for rambling, but in this case, we always and must bond our neutral and ground in the fused disco, and keep the MSP bonded as well. I see electricians arguing that you cannot have 2 1st means of disconnect, and that only the msp should be bonded. What is your take? I only equipment ground a disconnect (non-fused) when I'm feeding from a breaker.
@matt24fc
@matt24fc 2 жыл бұрын
BTW, I Love your page, been watching for years! I've been a solar installer, working under our electrician's lisence for 5 years, and am soon going to apply as an apprentice and work towards my journeyman's. I have upgraded service panels, changed out outlets, installed switches, lights, sub panels, ATS's, even meters and meter mains, all along with our solar and storage systems. I can't wait, and believe the years of watching your videos has a lot to do with why I am where I am today. Not a part of your discord or your advancement classes but believe I will be joining as soon as I officially make the switch! Thanks bro!
@matt24fc
@matt24fc 2 жыл бұрын
Ugh. Just rewatched the portion where you're talking about multiple buildings and then wind and solar and realized you said that those are all separately derived systems. Which is exactly what my comment said in 100× words. I've always been confident that I was understanding it correct, just see ppl argue it wrong sometimes on electrician pages. Lineside tap to disco, disco must be fused and neutral must be bonded to ground. If you read all this... I'm surprised, and thanks! Lol
@esthermcgough3995
@esthermcgough3995 Жыл бұрын
In one of your videos you were talking about old breaker boxes. What was the name of the place that may have old breakers?
@hobomobile1646
@hobomobile1646 Жыл бұрын
Great info, I think it answers my question but I have a specific scenario and I'd like your response. I'm connecting my "shop" (a prefab shed) to a 50Amp RV outlet. From my main service panel I've wired a 50A 240v outlet, then run a 100' Southwire 50A extension cord (6/3+8/1 ground) to a Reliance 50A inlet box, which can then be wired directly to a sub panel. (No transfer switch, no generator, I'm permanently powering the shed via the extension cord from the outlet.) The "sub" panel is actually a Square D 100 A Main Breaker Panel so I have my main disconnect. There is no ground bus bar on that panel. I assume I have to attach one separately, and hook up the equipment ground wire from the inlet box to it. So the main question is: do I need to stick an electrode in the ground and then connect that to a ground bus bar, or can I just attach the 8/1 grounding wire from the main panel to the ground busbar on the sub panel and call it good? Your video seems to say I need to do both: add a ground bus bar to the sub panel, then drive an electrode into the ground and tie it to that bus bar, then connect the equipment ground from the feeder wire as well. But this seems like multiple paths to ground, unless I'm totally muddled. Thanks!
@felixgarcia4900
@felixgarcia4900 11 ай бұрын
Nice drawing
@javiervela7711
@javiervela7711 2 жыл бұрын
Muy bueno very good
@nickdycus421
@nickdycus421 Жыл бұрын
Would u still need the green conductor going from panel to panel if the conduit you have your feeders in is steel conduit
@jplflyer
@jplflyer 2 жыл бұрын
I'd love to see a video of you actually wiring the subpanel. As you explained, the neutral does NOT tie to the ground inside the subpanel the way it would in the main house. If I look at the panel inside my house, both bare (ground) and white (neutral) wires can be attached to the same locations in the panel, and those are all attached to the panel itself. If I understand what you've said, that's different in a subpanel. The grounds will be tied together and grounded to the panel, but the neutral wires will NOT. Do subpanels thus come with one set of lugs for the bare ground / green and a different set of lugs for the neutral / white?
@donaldwood9187
@donaldwood9187 Жыл бұрын
When you purchase a breaker panel to use in an out building as a sub Panel.... most often you have to buy with the panel, and extra grounding Bar, for that brand of panel. Some brands come with them, but most do not. It should come with screws and the panel should have a place to attach it. Must use the screws that comes with the grounding bar. This will be your "Grounding" (Green Wire) connection for all equipment grounds. The Neutral Bar already in the panel is your "Grounded" / Neutral Bar, for all of your neutral wires, (white). Remove the Green ground screw from the Neutral Bar, or jumper, which ever it has. You don't need them. The Grounding Bar you install will be Bonded to the Breaker panel "can" using the screws that come with it.
@ericcook80
@ericcook80 2 жыл бұрын
Most of the hundred amp disconnects are so small and don't even come with a ground lug do you still have to bring your bear copper to the disconnect or is it fine to go to the panel as long as I Bond my disconnect
@ronaldbaugh3252
@ronaldbaugh3252 Жыл бұрын
Good evening, I am working on a older home real older wire. Working on three way, haven't determine if they are using California or Chicago method. Source to light to switches. been eliminating some wire and rewiring but this one like a lot i have already seen have been spliced to this and that, and just left in the attic. question is one three way switch has to be on to get the other one to work. I have tried eliminating to find travelers, but still coming up to the same thing. Any suggestions?
@aaronw9035
@aaronw9035 Жыл бұрын
Hmm In australia it’s kinda similar. We have MEN link earth and neutral at the main switchboard. The earth should be sized to the mains capacity. You do not install multiple earthing systems you can only have one at the origin
@jacobdellinger4931
@jacobdellinger4931 2 жыл бұрын
do you happen to have any load cal videos?
@austincraft327
@austincraft327 Жыл бұрын
can i use 5/8 copper rod to tie to footing rebar on my 24x30 wood shop?
@raylrodr
@raylrodr Жыл бұрын
What is required where a three wire USE triplex is run from the house to free standing frame structures without a seperate grounging conductor as in an older system? Do you have seperate grounding rods for each out building and do you bond wirh neutral in them?
@9111logic
@9111logic 4 ай бұрын
Thanks 🙏for sharing, even though I live in the UK physics is always physics. Do you have a video on separately derived systems perhaps? I built a solar shed which can provide power and/or be provided from the main building where the Victron inverter is supposed to lift the neutral to ground when connected to the mains. However I don't feel safe non having the two ground electrodes bonded together so I have arranged for an automatic contractor for phase, neutral and ground change over so to keep the two systems totally independent. However if the inverter is used for charging as well as assisting the all system would run on the main building earth bonded to the neutral at the service and I would still have the secondary grounding electrode connected to the PV system. Should I just bond the two grounding rods and not worry about it or have I done the right think by keeping the two systems grounds independent from each other?🤔
@randallcalhoun6604
@randallcalhoun6604 Жыл бұрын
This is interesting I built a garage that became my main service drop location (i moved the service meter and drop to the garage) making my house a subpanel of my garage via a 100amp feeder. My electrical inspector made me disconnect my original grounding electrode conductor. His reason was there should only be one ground at the source (service). Ie i have aabandoned rods at the house and a working ones at the garage (new service drop) Was this incorrect?
@caliresester1784
@caliresester1784 Жыл бұрын
So if it’s a sub panel and the detached garage has its own ufer do we need to run a ground from the main panel? Or can we originate our new ground from the detached building ufer?
@popstream4972
@popstream4972 11 ай бұрын
Is a disconnect code on the 2nd building if you have a breaker in the 1st building rated for the sub Pannell
@jesusortega5507
@jesusortega5507 2 жыл бұрын
So if I have a sub panel in my garage out back I need a disconnect before the sub panel?
@jeffeng8144
@jeffeng8144 Жыл бұрын
Can 2 structures, if they are close enough, share a pair of grounding rods?
@rosiegonzalez167
@rosiegonzalez167 Жыл бұрын
Can you do a video how to screw down flush mount panel
@kyledunaway6370
@kyledunaway6370 Жыл бұрын
What if you have this same scenario except your sub panel has a main breaker instead of a separate disconnect. The feed from the house feeds the main breaker.. would you connect your ground rod and the equipment grounding conductor on the ground bar in the sub panel?
@bamm2pointohh
@bamm2pointohh Жыл бұрын
So i have a 1 story duplex apartment 2 meters with disconect do i need 4 ground rods? 2 for each pane?l or can i put the ground rods at the disconnect and bond the 2 disconnects being as though they are the first point of disconnect
STOP Cutting Wires So Short!!! What Does Code Say?
6:37
Electrician U
Рет қаралды 120 М.
Why Do We Bond at the Service Panel and Not a Subpanel?
19:46
Electrician U
Рет қаралды 1,1 МЛН
The day of the sea 🌊 🤣❤️ #demariki
00:22
Demariki
Рет қаралды 90 МЛН
Неприятная Встреча На Мосту - Полярная звезда #shorts
00:59
Полярная звезда - Kuzey Yıldızı
Рет қаралды 7 МЛН
Sigma Girl Past #funny #sigma #viral
00:20
CRAZY GREAPA
Рет қаралды 26 МЛН
Fastest And Easiest Way To Drive Grounding Rods
4:52
Everyday Home Repairs
Рет қаралды 54 М.
Why Do We BOND Neutral & Ground in ELECTRICAL SERVICE PANELS?
17:05
Electrician U
Рет қаралды 875 М.
When NOT to drive a Ground Rod at a Detached Building
4:59
Electrical Code Coach
Рет қаралды 7 М.
What is the Difference Between Grounding, Bonding and Neutral?
15:15
KNOW WHAT YOU'RE DOING - or You Will FAIL Inspection!
18:15
Electrician U
Рет қаралды 134 М.
Why do we drive Ground Rods at Detached Garages?
5:07
Electrical Code Coach
Рет қаралды 30 М.
Grounding, System and Equipment [250.4, 2020 NEC]
33:35
MikeHoltNEC
Рет қаралды 100 М.
What is Voltage Drop? How to Avoid it and Telltale Signs!
34:26
Electrician U
Рет қаралды 83 М.
Why Are Rails Shaped Like That?
14:53
Practical Engineering
Рет қаралды 2,5 МЛН