This video will help to do do the complete estimation of the Septic Tank And Soak Pit With 3D Model for complete visualizaztion.
Here we have made an attempt to explain the object with the 3d view so it will give you the clear concept.Here we have done the estimation of :
1.Earthwork in excavation
2.Cement concrete
3.1st class brickwork in cement mortar in septic tank
4.2nd class brickwork in soak pit
5.2nd class dry brickwork in soak pit
6.RCC work
7.Cement plastering
8.50 mm size brick aggregate
9.Coarse sand outer side of soak pit
10.Iron foot steps
You can watch the estimation of a single roomed building with verandah from this link: • ESTIMATION OF A SINGLE...
You can watch ESTIMATION OF TWO ROOMED BUILDING WITH 3D BY LONG WALL SHORT WALL METHOD ||M.CHAKRABORTI||IOE||TU|| from this link :
• ESTIMATION OF TWO ROOM...
You can watch Estimation Of Two Roomed Building With Verandah (M.Chakraborti ) from this link :
• Estimation Of Two Room...
You can watch ESTIMATION OF SLAB CULVERT WITH 3D MODEL :
• ESTIMATION OF SLAB CUL...
You can watch the detail aqueduct estimation from this link : • ESTIMATION OF AQUEDUCT...
AND IF YOU LIKE THIS VIDEO PLEASE SUBSCRIBE FOR MORE INSPIRATION TO MAKE SUCH VIDEOS.
Also join in our facebook page : / adv-learning-107385177...