Рет қаралды 477,881
Evacuating the Summit Six Chair Lift at Mt Hutt, after a malfunction due to high wind, New Zealand
The lift’s wire rope came off the tracks when high winds blew the chairs around. All the chairs had to be let down one at a time, each taking 10 or so minutes with about 30ish chairs to be let down. Mountain crew started from top of the mountain to the bottom, which is where we were, so we were one of the last groups.
There was a capsule on the back of the seat with a rope inside that we threw down to the crew below. They attached a stronger rope with a tbar seat on the other end, for us to pull back up and thread through a carabiner above. They then lowered us down using that.