Let's take a look at the "Fast Footer" fabric footing form......
Пікірлер: 28
@jayeoliver92593 ай бұрын
Thansk for showing in details this process! I am carpentry-framing student and we just finished the concrete foundation module. This is a great visualisation/recap of the prep/pouring process!
@AaronHope_Sow3 ай бұрын
Really appreciate seeing these details and the pour Steve!
@jackjmaheriii3 ай бұрын
For what it’s worth… I’ve never used bag form, but I have had a lot of luck with this visqueen. The concrete cures a little slower, stays hydrated, a little better, so in theory it’s a little stronger and wicks less water.
@2point..03 ай бұрын
Hi Steve, I am going to use "Fast Footer" with a stepped footing, for a slab floor on one side and a full basement of the other side and also for I.C.F.'s in the State of Maine, Liked#37 N Subscribed!!!
@robthewaywardwoodworker99563 ай бұрын
Very interesting product. I had a custom footing company many years ago and I would have loved to try this fabric form system. Seems like it would lessen the wear and tear on the basic 2x forms for sure. Great details with the rebar.
@KING-FU3 ай бұрын
Recording in verticle mode with no FS expansion makes it almost unwatchable for me. JS
@charlieanstey99983 ай бұрын
Good details
@tammyhoffman64863 ай бұрын
Steve, Is it common for the electrical service grounding wire to be installed in the footing in residential construction as shown in your video? I know it happens in commercial buildings.
@stevenbaczekarchitect94313 ай бұрын
In MA it's required I'm told
@zefrum33 ай бұрын
Yea I saw that and was curious about it too
@tomsterism3 ай бұрын
From my understanding, the Fast Foot product primarily allows the waterproofing of the perimeter foundation of a structure. Assuming the use of ICF, they will set upon that smooth, leveled footing surface? Fast Form also offers a supporting "foot" of sorts that will allow the installation of some ICF forms as part of the footing pour, I think. A snazzy system.
@JTDesign13 ай бұрын
Dang Steve I've detailed that J bar for so long i no longer rememered why it was there. I've never seen a detail about alternating their direction either. Thanks. Now i need to update all my details.
@robthewaywardwoodworker99563 ай бұрын
If you ever do any detail drawings for the engineering in a building, you're likely to see that alternating J-bar detail a lot. I still remember the days when they would call for a keyway instead of rebar verts! Ha
@chipsmith74593 ай бұрын
Have a question? Why copper wire tied to the rebar?
@59seank3 ай бұрын
I have the same question. @9:39
@tlangdon123 ай бұрын
It's most often used to provide an earth connection for lightning protection systems, but it can also be the earthing system for the home's electrical installation. Rather than drive a single earth rod into the ground where it is subject to corrosion, the connection to the earth is made via the rebar and concrete footings over a large area. This protects the connection, and generally gives a better connection to earth. I do wonder though whether the plastic used to construct the forms is somewhat insulative and so negates the benefits. Googer Ufer grounding systems for more info.
@59seank3 ай бұрын
@@tlangdon12 Thanks for the info. You bring up a good question about the plastic being an insulator.
@chadcooper73483 ай бұрын
Nice battery powered vibrator. - Does the Fab Form also act as a wrb in any way? - Is the concrete slump/additives for this pour the same as what you poured for the ICF blocks? Thanks
@16jocko3 ай бұрын
Never move fresh concrete with the viborator and don’t let the concrete flow down the footing to a lower level. It is called aggregate segregation. Use the pump to place the concrete directly, that is why it is there.
@bobjoatmon19933 ай бұрын
Beat me to mentioning that. These are supposedly professionals but that's sure not.
@michaelomalley67263 ай бұрын
wow cool
@tammyhoffman64863 ай бұрын
Steve, It looks like the video topic label got misspelled. FROMED vs Formed
@antonkachulkin69803 ай бұрын
One more question: where is a pipe for water mitigation?
@shannabolser94283 ай бұрын
That would go on the outside of the footer after the forms come off.
@davidparker96762 ай бұрын
The pipe is laid outside the footer and covered in gravel and filter cloth. You want to keep the clay soil far from your foundation because it holds water for a long time. Gravel and sand will allow the foundation to drain and shed moisture from the floor and walls.
@Ronaaronhunt3 ай бұрын
Uh, i hate portrait video.
@TommyShlong3 ай бұрын
Another cool video. What is the copper cable running along the rebar for?