Рет қаралды 57,956
Located adjacent to the Mattapan MBTA Red Line station, this mixed-use redevelopment project consists of 135 residential units, 10,000 sq. ft. of commercial and retail space, a 70-space parking structure, and 50 surface parking spots. The large structure was realized with the PERI SKYDECK system. The slab formwork system with dropheads was used for the first level structural slab and second level post-tension slab. Additional over 4,000 sq. ft. of PERI PD-5 10K shoring was used on the project.
Visit our KZfaq channel:
/ perigroup
Corporate Website:
www.peri.com
Facebook: / peri
LinkedIn:
/ peri
Instagram:
/ pericorporate
Twitter:
/ perigroup
The user shall always observe the currently valid Assembly and Use Instructions of the PERI products used by him/her:
www.peri.com/en/terms-of-use....