Рет қаралды 462,787
While testing the new Inter City Express the train conks out after leaving the station blocking a siginificant amount of switches. Until the towing locomotive arrives, the dispatcher stuggles with handling the traffic.
Please bare in mind that this modelrailway is still under construction, which explicitly adresses missing catenary and screws in the tracks.
This layout is controlled by:
ESU Ecos 50200
Traincontroller 8 Gold
Camera:
Panasonic Lumix G70
Panasonic Lumix G Vario 14-140mm f3.5-5.6 ASPH Power OIS
Panasonic Lumix G Vario 12-60mm f3.5-5.6 ASPH Power OIS
Alex Anlage on Instagram:
/ alex.anlage
Read more about the layout (german)
stummiforum.de/viewtopic.php?f...