One of the new zipper trucks (road zipper, barrier transfer machine) positions the new moveable median barrier on the closed Golden Gate Bridge. As seen from Battery Spencer in the Marin Headlands on Sunday January 11, 2015.
Пікірлер: 11
@dinahsanders41479 жыл бұрын
An expensive truck and barrier, but this is going to save so many people so much time by easily adjusting to north/south traffic flow I can see how the math makes sense.
@aakla8 жыл бұрын
we have that in Hawaii, wait until it breaks down before rush hour and people are stuck in bumper to bumper traffic until 11pm. Some battery or such got fried so they put a back up battery in and fried that one to. But it only broke down once since we had it and we've had it for years.
@justintime50214 жыл бұрын
I drove into San Francisco on the really narrow side and on the way back it was also the narrow side ... I thought it was some kind of witchcraft.
@laminarflow9 жыл бұрын
Will the road zipper still work if it's involved in an auto collision?
@gartnilis81129 жыл бұрын
So are they going to change the lane configuration every day?
@TurnerMillsDesign7 жыл бұрын
They have to stop traffic in both directions to do this? Jeez.
@3goals4bonzai8 жыл бұрын
pfffft. where's the double decker seating for the hipsters along for the realignment?
@andyjukes9 жыл бұрын
It's also erasing and re-painting the lines! What sort of sorcery is this?
@KellyS_779 жыл бұрын
I can't tell if you mean this sarcastically or not, but I believe that what you think is a solid line is actually the top of the barrier. Either that or Voldemort has taken over the bridge.
@andyjukes9 жыл бұрын
Kelly S Oh my gosh, you're right. My mistake.
@KellyS_779 жыл бұрын
No worries, I had thought the same thing initially :)