Рет қаралды 831,724
This was a time-lapse project commissioned by Network Rail and Carillion. We captured the demolition and installation of a road bridge near Romsey in Hampshire.
36hrs condensed into 5.5 minutes.
The project was filmed by two static time-lapse cameras. One was attached to a small gantry overlooking the rail track and the other was positioned at ground level.
An Ainscough crane was hired to do the construction. It had a lifting capacity of 1,250 tonnes.