Рет қаралды 50,609
As they dug the tunnel below Boston's elevated Central Artery, an army of contractors encountered the subterranean infrastructure that powered the city - gas, thermal, electric, telephone and sewer lines. It slowed down work and drove up costs. But for six years the overall cost of the Big Dig never changed. This episode unravels the Big Dig's accounting and explores why cost overruns came to define the project.
This is the sixth in a nine-part podcast series about history and politics of the Big Dig - one of the most notoriously troubled infrastructure projects in American history. It was created as an audio experience. This presentation includes archival images.
Episode 1: • The Big Dig began with...
Episode 2: • How two competing tunn...
Episode 3: • How Boston's Big Dig s...
Episode 4: • Here's why Boston's be...
Episode 5: • It took a feat of engi...
Episode 7: • How a power struggle o...
Episode 8: • Boston's Big Dig tunne...
Episode 9: • The Big Dig transforme...
You can find more about The Big Dig podcast at www.wgbh.org/p....
GBH News is a premier source for in-depth local news and original story telling based in Boston, Massachusetts.
Subscribe to the GBH KZfaq channel: www.youtube.co....
Follow GBH News on Instagram: / gbhnews
Like GBH News on Facebook: / gbhnews
Follow GBH News on Twitter: / gbhnews
We can’t do it without you. Support our award-winning community journalism by donating today: bit.ly/Support...