Рет қаралды 927
This job has a high risk, make sure every step follows the work standards that have been made. safety first
Job description
PC 200 will supply its hydraulic power using a hydraulic hose to the travel motor EX2500, so that the lower structure of the EX2500 can be moved for slew replacement.