Рет қаралды 6,252
This part of the build things have really progressed. The window has been installed, the pond has been insulated, the box welded liner from Kirky koi installed, bottom drains, return lines and skimmer attached to the liner ready for the big fill!
Social media
Instagram: Diaryofanaveragecarper