How to Install the TripSaver II Recloser

  Рет қаралды 87,100

T&D World

T&D World

8 жыл бұрын

An Arizona Public Service crew installs three Trip Savers on a Distribution Pole. At the same time, the crew dead-ends all three phases on each side of the pole. Host Utility: Arizona Public Service

Пікірлер: 48
@freethinkingamerican80
@freethinkingamerican80 3 жыл бұрын
As a Lineman I appreciate these videos, keep up the good work. These are very informative and shows the public what we do and a little how we do it.
@bamaslamma1003
@bamaslamma1003 2 жыл бұрын
Alabama Power recently installed one of those on the primary that feeds our neighborhood, single phase 7200 volt. Our neighborhood has lots of trees that have grown up near the lines. Even the winds from a summer storm would blow the trees into the lines and cause a short and pop the cutout fuse. Then we'd be without power for at least an hour until the fuse was replaced. It'll be interesting to see how this device performs.
@ElectroTree01
@ElectroTree01 Жыл бұрын
They did not strengthen the crossarm because of the recloser’s weight. They put a stronger one up to swap it from a tangent to a deadend crossarm.
@ucfsub
@ucfsub 6 жыл бұрын
It's interesting how rubber glove and sleeve policies differ from company to company, we have a ground to ground rubber glove policy, even while hot sticking and working tested dead and grounded lines. We'd also need sleeves if we were working within minimum approach.
@lewy1
@lewy1 6 жыл бұрын
ucfsub when working on tested and dead grounded lines do you also use cover up as clearly you feel it is not safe for bare conductor to touch any part of your body.
@ucfsub
@ucfsub 6 жыл бұрын
I don't feel unsafe about any of that. I was stating that our policy requires the use of rubber gloves even on tested dead and grounded lines. At no point could we exchange rubber gloves for leathers under any circumstances unless we were working on a pole that had no possibility of becoming energized i.e no foreign wires of any kind bridging to an energized pole.
@lewy1
@lewy1 6 жыл бұрын
ucfsub my question is does your company make you cover everything up because clearly they feel it is unsafe for any part of your body to contact a bare conductor.
@ucfsub
@ucfsub 6 жыл бұрын
Nope, and the best part is they wouldn't say a word if you were taking a nap across all 3 phases so long as you had your rubber gloves on.
@freethinkingamerican80
@freethinkingamerican80 3 жыл бұрын
I'd hate to be using sticks while wearing rubbers, screw that.
@TupmaniaTurning
@TupmaniaTurning 4 жыл бұрын
Really interesting video, even for a non-sparky like me! Great teamwork.
@TheSpajman
@TheSpajman 5 жыл бұрын
Thanks! Looking forward to doing my own next time.
@ghanimuhammadusman2891
@ghanimuhammadusman2891 7 жыл бұрын
Very good team work
@user-nv9ii2ee7s
@user-nv9ii2ee7s 7 жыл бұрын
good explanation for supervising consultant.
@danielelise7348
@danielelise7348 7 жыл бұрын
Steve,removal of the jumpers is a mere formality,so not really worth showing,however in saying that,had one of the tripsavers been defective from the factory,removal of the jumper on that phase may well have been interesting to say the least,I'm sure all went well though!
@kevingambino1570
@kevingambino1570 6 жыл бұрын
Would love to see the jumper removal process. We're having discussions and difficulty installing these live. We use rubber glove technique on 24kV lines and install the Trip Saver 2. However whenever we use an Amprobe to check current through the jumper and Trip Saver before jumper removal, no current seem to flow through the CLOSED Trip Saver. Thus we are afraid to remove the jumper fearing we might be interrupting the current flow, creating an arc and hurt ourselves. Therefore our practice involves a short outage per phase. We reinstall the fuse-out in the Trip Saver bracket to remove the jumper, remove the jumper, open the cut-out, install the trip saver then close it. Advise please
@glenguadagno7931
@glenguadagno7931 6 жыл бұрын
kevingambino1. look into load pickup jumpers. you can safety open a jumper with hotstick technique. if the recloser is defective the load brake jumper will snuff the arc.
@shahzadshahzad2326
@shahzadshahzad2326 7 жыл бұрын
amazing sir amazing
@andrepereira4115
@andrepereira4115 6 жыл бұрын
Que bagunça pra colocar chave XS, Aqui no brasil nós elevamos todas as 3 fases acima de nossa cabeça com o auxilio de uma cruzeta auxiliar,. assim podemos montar a estrutura embaixo e depois é só fazer o by-pass e fechar os jumpers..muito mais rápido prático e seguro.
@wingsley
@wingsley 4 жыл бұрын
Spanish translated by Google Translate: "What a mess to put XS key, Here in Brazil we raise all 3 phases above our head with the aid of an auxiliary crosshead. So we can assemble the frame below and then just bypass and close the jumpers..much faster practical and safe."
@kgc57
@kgc57 Жыл бұрын
I was always told not to ring any kind of copper or poly wire because it could create a weak point and break after sometime.
@edsel519
@edsel519 8 жыл бұрын
Good job
@powerlinekidforsman9360
@powerlinekidforsman9360 4 жыл бұрын
and there were like 2 selves on the middle phase
@lewy1
@lewy1 6 жыл бұрын
Why is the rope shorting out the jib. The rope should not be used unless it is attached to a link stick, just put the wire in a wire holder without the winch. Also what’s wrong with using a live line hoist or just attach the grip and hoist with rubber gloves.
@jerrystawnichy3873
@jerrystawnichy3873 3 жыл бұрын
Hello all, Does the trip saver also act as a lighting arrestor ?
@linehandibew6205
@linehandibew6205 Жыл бұрын
I love that a guy that doesn’t know “how to” is telling us “how to”
@oliveira7394
@oliveira7394 7 жыл бұрын
Gostei muito criativo.
@brugster75
@brugster75 7 жыл бұрын
Hello guys, why weren't the jumpers removed immediately after closing the Trip Savers?
@powerlinekidforsman9360
@powerlinekidforsman9360 4 жыл бұрын
and why did they need to put insulators on?
@binaryglitch64
@binaryglitch64 2 жыл бұрын
Damn Arizona, you got pined insulators, and these fancy TripSavers instead of wire tie offs and some basic fuzes ... y'all gettin fancy on us with your new tech... is that APS, Salt River, or the other one (I forgot what it was)? I might have to move back to AZ just to go do lineman work. Call me crazy, but I like the heat.
@johngallaspy7137
@johngallaspy7137 Жыл бұрын
Does having those double buckets make the time and equipment cost less and the pay more?
@connormondello1486
@connormondello1486 5 жыл бұрын
TripSaver II Recloser reduces customer outages.
@adrianleon2281
@adrianleon2281 4 жыл бұрын
So unsafe !!no cover up it all , good video of how Not to do line work
@orisonsquirrell
@orisonsquirrell 5 жыл бұрын
3:04 hot stick no gloves, bad habits
@jcoz5577
@jcoz5577 5 жыл бұрын
You're not meant to use gloves with a hot stick.
@sonnyclark6783
@sonnyclark6783 4 жыл бұрын
Glove it
@freethinkingamerican80
@freethinkingamerican80 3 жыл бұрын
APS doesn't allow rubber gloving even on 7200, only time we wore our rubbers was to.put cover on and a few other times. Besides that we sticked everything. I like sticking so no problem for me.
@general.long.v
@general.long.v 3 жыл бұрын
Good
@andrepereira4115
@andrepereira4115 3 жыл бұрын
Espero que isso foi somente um vídeo informativo, porque o TripSaver não adiantou nada, o circuito continua sem proteção.
@alexkrxxx
@alexkrxxx 3 жыл бұрын
they forgot to cut the main line jumpers right? or at least didn’t show that, or else the trip saver does nothing
@nancysmith9487
@nancysmith9487 Жыл бұрын
Triple saver for who not the lineman working jobs, Two if wires on ground laying after it faults. Then it saves a move... Think it's going to save a life laying energized waiting to be touched... Geniuses Save money time not lives...
@graceyu6974
@graceyu6974 2 жыл бұрын
@edge1289
@edge1289 5 жыл бұрын
Why is the lineman in the air cutting his own taps and skinning the ends in the air to install in the cutouts???? Arizona correct, I assume it’s warm there.... cutting the tap wire and skinning the wire is ground work, if I’m in the air you better ground hand for me. If you don’t ground hand for me correctly, you’ll only do it wrong once.
@wng8993
@wng8993 5 жыл бұрын
Maybe they are right with money in AZ and dont want to waste tap wire.
@rbatog
@rbatog 6 жыл бұрын
ineffective till the carry overs are removed lol
@mahendradebbarma3401
@mahendradebbarma3401 3 жыл бұрын
Waw
@paulzamarripa4294
@paulzamarripa4294 5 жыл бұрын
,
How to Change Out a Voltage Regulator
9:53
T&D World
Рет қаралды 100 М.
Primary Conductor Removal
8:27
T&D World
Рет қаралды 77 М.
Smart Sigma Kid #funny #sigma #comedy
00:26
CRAZY GREAPA
Рет қаралды 20 МЛН
ПРОВЕРИЛ АРБУЗЫ #shorts
00:34
Паша Осадчий
Рет қаралды 6 МЛН
HYDRAULIC PRESS VS ARMOR, USA AND RUSSIA
10:16
Crazy Hydraulic Press
Рет қаралды 244 М.
Temporary Extension Arm Installation
7:35
T&D World
Рет қаралды 37 М.
Recloser counter?... and other answered questions.
20:56
Bobsdecline - Lineman blogger
Рет қаралды 32 М.
How to Prepare a Highway Crossing Part 1
5:56
T&D World
Рет қаралды 18 М.
Epz grounding
18:09
Claytin Conrad
Рет қаралды 9 М.
How to Change Out a Capacitor Bank
7:01
T&D World
Рет қаралды 61 М.
TripSaver® II Cutout Mounted Recloser Installation & Operation
9:24
S&C Electric Company
Рет қаралды 14 М.
Columbus Indiana Power Pole Replacement March 24th 2023
33:29
How to Change Out a Recloser
5:41
T&D World
Рет қаралды 46 М.
Southern States Recloser Installation Video
6:21
SouthernStatesLLC
Рет қаралды 7 М.
Что делать если в телефон попала вода?
0:17
Лена Тропоцел
Рет қаралды 2,7 МЛН
iPhone, Galaxy или Pixel? 😎
0:16
serg1us
Рет қаралды 1,3 МЛН
Telefonu Parçaladım!😱
0:16
Safak Novruz
Рет қаралды 26 МЛН