Рет қаралды 6,997
Take a look at all the latest work happening at Hyperia including engineers working at 236ft in the air with a crane lift a piece of steel rumoured to be a temporary strut to hold whatever they are working on above the track before lowering it into place! Hyperia is said to be reopening sometime this weekend (8th). Work continues in the area, with this evening the crane being taken down and looks to be ready to leave the site. Join me for all the latest hyperia updates as the reopening edges closer day by day!
Thorpe Park Resort - www.thorpepark...
Theme Park Guide - / themeparkguide
#hyperiaclosed #hyperiaupdate #thorpeparknewcoaster
Rides:
Stealth
Tidal Wave
nemesis inferno
the swarm
colossus
Saw the ride
storm surge
rumba rapids
detenator
Music - Thorpe Park IMA Score soundtracks inc nemesis inferno colossus...