Introduction to sprinkler truck assembly production line

  Рет қаралды 121

ankatruck

ankatruck

Ай бұрын

Whatsapp/wechat:+8613886888137
E-mail:info@anka-truck.com
www.anka-truck.com/collection...
The first step is to prepare the truck chassis, inspect and process the chassis to be assembled, including cleaning, spraying anti-rust paint, etc.
Step 2. Install the water pump and standard parts. The water pump is the core component of the sprinkler truck. Workers will install the water pump and corresponding pipes, valves and other accessories in place, and conduct necessary tests.
Step 3. Assemble the prepared tanks to ensure that each chassis is equipped with a suitable tank to avoid overloading during transportation.
Step 4. Electrical system installation: including control panel, wires, tail indicators, etc. Make sure all electrical components are working properly and safe and reliable.

Пікірлер
How Coca-Cola Is Made.SUBSCRIBE
13:28
On Point Media KE.
Рет қаралды 542
Iveco ambulance configuration display
1:33
ankatruck
Рет қаралды 23
ЧУТЬ НЕ УТОНУЛ #shorts
00:27
Паша Осадчий
Рет қаралды 9 МЛН
Dump truck production workshop display
1:26
ankatruck
Рет қаралды 53
Chusheng overview video
5:38
Lucy Wang
Рет қаралды 7
Isuzu truck mounted crane truck introduction
1:15
ankatruck
Рет қаралды 332
ЧУТЬ НЕ УТОНУЛ #shorts
00:27
Паша Осадчий
Рет қаралды 9 МЛН