Рет қаралды 121
Whatsapp/wechat:+8613886888137
E-mail:info@anka-truck.com
www.anka-truck.com/collection...
The first step is to prepare the truck chassis, inspect and process the chassis to be assembled, including cleaning, spraying anti-rust paint, etc.
Step 2. Install the water pump and standard parts. The water pump is the core component of the sprinkler truck. Workers will install the water pump and corresponding pipes, valves and other accessories in place, and conduct necessary tests.
Step 3. Assemble the prepared tanks to ensure that each chassis is equipped with a suitable tank to avoid overloading during transportation.
Step 4. Electrical system installation: including control panel, wires, tail indicators, etc. Make sure all electrical components are working properly and safe and reliable.