Contract Name Construction of Double Lane Dual Carriageway Standard Expressway Road, Bridge and Allied Works (CH: 49+800 - CH:57+400, 7.6 Km)
Salient Features:
Contract No. :KTFT/ICB/Works/R&B/078/079/3
Contractor :M/S Kumar-Roshan-Sichuan JV, Chandol, Kathmandu-4
Employer: Kathmandu-Terai/Madhesh-Fast Track (Expressway) Road project Nepali Army Bhadrakali, Kathmandu, Nepal
Engineer M/S Yooshin-KEC-Pyunghwa JV in association with GIDAN-Sitara
Pvt. Ltd. Nepal
Date of Commencement: 31st Jan 2022
Original Contract Period: 33 Months 1000 days from the date of commencement
Original Completion Date: 26th October 2024
Defects Notification Period: 1825 days (5 Years)
Original Contract Amount :Nrs.5,907,103,839.58 (without VAT and PS)
Original Contract Amount Inclusive of VAT and PS: Nrs. 6,870,027,301.46
Total Length : 7.6 km
Bridges: 14 Nos Twin Bridges
Bridge Type : Rigid Frame/PSC Box Girder/Simply Supported /Continuous
Piles: 748 Nos;1200mm Diameter
Roadway Pavement : DBM; Asphalt Concrete
Slope Protection: Soil Nailing/Earth Anchor
Work Completion till April 2024=25.12%.
Special thanks to Mr. Nabin K. Bhatt.
#kathmandu_tarai_fast_track_construction
#KTFT #fasttracknepal #tunnelconstruction #Prosperity #fasttracknepal #megaprojects
#kathmandu #fasttrack #megaprojects #KathmanduTeraiFastTrack #NepalInfrastructure #GameChangerTransportation #fast #track #updateshorts
#travel #fasttrack #expressway #kathmandu #nijgadh #terai #hetauda #KTFT