Рет қаралды 671,807
The TCC 78000 gantry crane has a lifting capacity of up to 1,600 tonnes. This rail mounted heavy lift crane moves over 420 metres on a portal between the Liebherr-MCCtec Rostock GmbH factory site and the adjacent quayside. Equipped with a double trolley (two rails per side) and a rail gauge of 30 metres, the gantry crane provides optimum flexibility for handling all types of large-sized goods.
Learn more about our maritime production site at the Baltic Sea:
www.liebherr.com/en/deu/about...