Рет қаралды 446
Wieser Concrete produced four precast concrete tanks for a new wastewater treatment system at the Menards office building expansion in Eau Claire, Wisconsin.
25,000-gallon Septic Tank
20,000-gallon Equalization/BioMicrobics MyFAST 1.0 Treatment Tank
20,000-gallon MyFAST 1.0/MyNitriFAST 1.0 Treatment Tank
7,700-gallon Clarification/Dose Tank
Contractor: Petersen Onsite
Treatment Systems: BioMicrobics
Contact Wieser Concrete:
(715) 647-2311
wieserconcrete.com