How to calculate the Planned % and Actual % in your Primavera P6 schedule without cost or resource loading.
Monitor the project without cost loading
---------------
Keep in Touch:
Join our email Newsletter, we send useful free content regularly: planningengine...
WhatsApp: +201277767728
Email: Info@PlanningEngineer.Net
Linked in: / planning-engineer-est
FaceBook Page: / planningengineerdotnet
FaceBook Group: / 1138400132963230
Twitter: / planningeest
Instagram: / planningengineerest
---------------

Пікірлер: 14
@rupeshns03
@rupeshns03 3 ай бұрын
this is really better and simple way to manage the projects which do not have costs and resources loaded. Many thanks for the guidance and the video.
@SJMK1987
@SJMK1987 2 жыл бұрын
actually, this is what I'm used to doing with my projects but in a way more accurate than this, Instead of Export and importing from excel, you can ignore it because when you assign the 1 $ resource for all activities at once you will get the cost is equal to the duration multiplied by the daily hours, which means the cost multiplied by 8 that's why you can keep it as it is because at the end of the day the cost already distributed based on durations, or you can divide by 8 using Global Change if you want the same values of durations. What I'm doing after this step, I distribute a WTG for each Stage of Construction WBS for example CIVIL - ELEC - MECH etc. Each one of those will have a different weight and be multiplied by the previous cost. this will give you a more accurate analysis
@bilroo4129
@bilroo4129 Жыл бұрын
Thank you for your topic, it is very useful for me, this case is frequently, mainly with a weak contractor or subcontractor
@shakeeln2020
@shakeeln2020 Жыл бұрын
Very nice 👌 technique For levelling as duration base ..
@PlanningengineerNet
@PlanningengineerNet Жыл бұрын
Thanks a lot 😊
@nasreldeenhassan5786
@nasreldeenhassan5786 Ай бұрын
Helpful I suggest to issue short videos about planning tips
@PlanningengineerNet
@PlanningengineerNet 16 күн бұрын
Great suggestion!
@agnosticpatriot
@agnosticpatriot Жыл бұрын
Super.. loved it.. I am having the same problem
@Lifehacksflakes
@Lifehacksflakes Жыл бұрын
شكرا م هاني
@Benjamin_Oluwole
@Benjamin_Oluwole Жыл бұрын
Please give the sign you replaced with nothing
@HarisRehman-kj9ty
@HarisRehman-kj9ty Жыл бұрын
very useful video, please tell me if we use estimated weightage and define weightages to all WBS, is this approcah is correct? rather then use global change and do the weightages?
@gursu1923
@gursu1923 Жыл бұрын
Dear Hany, very useful video again, if i may ask, during export/import option why dont we add original duration column in modify template and equalization on the spreadsheet original duration=budgeted units instead of copy paste P6 page and apply vlookup formula?
@ahmadsaeed-su9of
@ahmadsaeed-su9of 2 жыл бұрын
Engineer Hany isn't this method not much accurate as it depends solely on the duration of an activity which doesn't reflect on the actual weight of an activity as some activities have a big amount of cost but takes little time for being performed?
@ahmadaltayeb1983
@ahmadaltayeb1983 Жыл бұрын
Please Sir, I had a question, why percentages will not roll up to project level in primavera p6, please not that it is roll up in WBS level, and I already assign recourses, please advise.
Convert Primavera Cash Flow to Cash in and Cash Out
19:17
Planning Engineer FZE.
Рет қаралды 6 М.
import progress updates with actual dates to primavera p6
10:32
Planning Engineer FZE.
Рет қаралды 24 М.
Алексей Щербаков разнес ВДВшников
00:47
Recovery Schedule | Tips | Tricks | Steps
10:00
Planning Engineer FZE.
Рет қаралды 10 М.
Lesson 6 part 6 Add the cost to each activity in the schedule
7:52
Planning Engineer FZE.
Рет қаралды 112 М.
Import Cost from excel to primavera 6
7:40
Planning Engineer FZE.
Рет қаралды 62 М.
Productivity Rates for Construction Projects
15:50
Planning Engineer FZE.
Рет қаралды 15 М.
What P6 Schedule Comparison Tool Should You Use?
26:52
Plan Academy Inc.
Рет қаралды 9 М.
How To Use Resources in Primavera P6
7:09
Ten Six
Рет қаралды 7 М.
How to create activities and cost loading from BOQ
13:57
Planning Engineer FZE.
Рет қаралды 10 М.
Resource Loading in Primavera P6 - 5 Tips to make it EASIER
8:11
Plan Academy Inc.
Рет қаралды 28 М.