This New Lock at the Soo Conceptual Construction Sequence Video shows the steps needed to complete the New Lock. Actual sequence of construction may vary.
Пікірлер: 7
@MakeMeFeelGo0d8 ай бұрын
Loving the animation and breakdown!
@wyldkat6035 ай бұрын
would be nice to hear whats going on. Difficult to read whats going on and then watch it at the same time.
@epistte6 ай бұрын
Will the new locks be wider or longer than the existing locks?
@princessofthecape20786 ай бұрын
Since they seem disinclined to answer, the new lock is apparently identical to the largest of the old locks (the one that doesn't get touched in this video). The two locks being replaced weren't used much because they were too small for newer lakers. While this is upping capacity, I agree with you: they should have gone bigger. My guess is that they figure that infrastructure limitations on the rest of the Great Lakes will prevent the ships themselves from ever getting much larger, so there's no need to future-proof.
@LokiOdinson-fz8ps3 ай бұрын
@@princessofthecape2078 check your attitude at the door princess. There is no reason to build bigger than the Poe. No ships will ever be built larger for the shallow harbors on the lakes.
@LokiOdinson-fz8ps3 ай бұрын
no reason to build anything larger than the Poe. The 1000ft boats are as big as the existing harbors can handle.
@princessofthecape20783 ай бұрын
@@LokiOdinson-fz8ps 'Check your attitude at the door'...? That's not attitude, this is: go take a short walk onto a busy highway.