Рет қаралды 490,148
This video is very useful to make rain water harvesting very easy.
The cost total expansion:
Cost of one ring concrete 2(1/2) ft
250 x 5 ( ring) = 1250
Then cap = 450
(Pipe you required)
Pipe line 46ft =2500
Transportation charge = 250
Total cast = 4250 ( without labour charge)
Without the material cost inside the rain water harvesting.
instagram - / deepakrajuchandrasekaran
#rainwater #rainwaterharvesting #aroundborewell