Рет қаралды 232
Flexamat Plus UV-T was installed to armor two spillways and access roads at a massive, multi greenhouse complex in California. Originally, articulating concrete block mats interlocked with cable was specified but Flexamat Plus UV-T was value engineered as an alternative.
Native growth is thriving within the Flexamat armor. The spillways have been overtopped and have held up like a champ! The access roads are actively used and are remain robust.
Installed August of 2021.