Рет қаралды 2,245
Saturday July 11 2015 at 7.47. The 7.41 Sheffield to Bridlington (10.02) train early on its 91 mile trip. This is a single track line not far to the west of the other Rotherham crossing and it apparently gets 108 trains a day. Opposite is the CF Booth site where large numbers of trains are scrapped. 200 seconds of the wait here was cut out so the barriers were lowered 6 minutes before the train arrived when it was probably still in Sheffield.