Find out how much we spent on the Open Condition in 2023 building #homewtelimach G2E from @Archon design office - #buildingadome to #open condition without dimming, true cost and scope of work.
We broke the first proverbial shovel on 18.04.2023 in order to reach the Open Condition after 4.5 months, i.e. 06.09.2023! Up to this stage, our construction was carried out using the commissioned system and the #SSO cost summary refers to the implementation of the investment using the commissioned system. On the contractor's side were materials, services, equipment and shipping. As Investors, we were only responsible for the surveyor and site manager. The expenses presented in the post do not include the fees for the power connection, deep well and site manager's remuneration (PLN 4,000). The power connection from PGE and the deep well are included in the pre-construction cost estimate - we described these expenses in episode 3 (link to episode below).
Did we spend a lot? We don't know. Could we have spent less? Probably yes! ...every build is different, everyone makes individual decisions about how to go about it, which contractor to choose, etc. What we wanted was peace of mind during the SSO construction process, and I can write with a clear conscience that we had that peace of mind! During these few months we did not argue with Kanalia even once! Of course, we considered at the beginning to choose a team in charge of the labour alone, but we quickly came down to earth.... We wouldn't have been able to handle so many issues on our own.
00:00 Introduction
00:24 Timelapse of the construction process up to the Open Condition
01:21 A look at the Archon cost estimate
03:54 Cost of level zero (foundations)
10:07 The cost of brick walls on the ground floor
14:39 The cost of the monolithic ceiling
19:20 The cost of masonry of the attic, roof tower and partition walls
26:22 The cost of roof sheathing, flashings, roof windows and guttering
33:23 Cost of all SSO stages
37:55 Summary sheet of SSO costs
Watch our other profiles:
➡️ / dom.pod.wawa
➡️ / dom.pod.wawa
➡️ / dom.pod.wawa
Previous episodes, SEASON 1 (2023):
• Za kilka dni będzie SS...
• Co mamy nowego na budo...
• Pierwsze dachówki (Cre...
• Kolejny dzień na budow...
• Prawie mamy Stan Surow...
• Wieźba dachowa w Telim...
• Dom w Telimach G2E / G...
• Plany na najbliższe et...
• Murowanie poddasza, śc...
• Murowanie ścian, desko...
• Realizacja fundamentów...
• Start budowy + koszt p...
• Pozwolenie na budowę -...
• Wkrótce zaczynamy budo...
Also check out our other videos from earlier in the house building process!