Рет қаралды 2,726
Following on from Part 1, further detailing is added to the upper section of the signal box and assembly of the lower section begins. This includes a laser-cut lever frame design where the levers can pivot and be positioned in either setting.
0:00 Introduction
1:46 Upper section details added
11:43 Lower section assembly
12:14 Lever frame design
15:50 Lower section brick wrap
24:23 Lower section completed
26:02 Finishing details added
36:12 Conclusion