Рет қаралды 211,717
Go to 9 minute mark for the machine work footage.
This week I have some footage from work. First job is a Heli-coil thread repair job in an aluminum housing, fixing an oil drain plug hole.
Second up is some shaft couplings I machined from 11" solid 1045 steel round stock. These are some custom sized couplings that had to be machined to the sample size. I do some heavy rough turning, taking 1/2" passes using my Iscar tooling designed for heavy stock removal. I'll finish up on the mill with some drilling and tapping.
Want to support the shop? / abom79
T-shirts always avaliable here: storefrontier....
Follow me on Instagram for daily uploads of current jobs. / abom79
Noga Mini Cool: amzn.to/2wpoN6p