No video

Subbase Restoration with Soil-Cement Full Depth Reclamation

  Рет қаралды 74,105

Delaware T2 Center

Delaware T2 Center

Күн бұрын

Пікірлер: 14
@danagrey3534
@danagrey3534 2 жыл бұрын
A little different setup then what the few contractors use in Ohio. We did a mile long stretch that had poo sub base which the city said use to be low land and filled in. There is also a high water table and the road get a lot of truck traffic. The asphalt ranged 9 to 12 inches and we milled all of that and was hauled off to lot at the one end of the project. Then the subcontractor came in and if I remember right they could go 28 inches with the reclaim in one pass. So they reclaimed it with lime. Waited about a week, and then came back to do it again with cement. We also hauled back the asphalt milling, spread them and they got added in. But yeah the sub had a water truck hooked to the reclaimed. We ended up with an average of 3 feet reclaimed sub base. Let me tell you what, when we came back in a few weeks to adjust castings, you could bare cut it with a backhoe! Then the asphalt contractor came in and did 1 1/2" intermediate and level coat and 1 1/2" top coat and we did that back in 2005 Probably the best mile worth of road I have seen and I would hate to be the one who had to any sewer, or storm work in that section! We also used to do a lot of lime and cenment stabilization in the winter for a massive industrial park. Definitely higher application and initial upfront costs but it definitely pays off in the long run! Thanks for sharing and we'll done video! We did that
@DelawareT2Center
@DelawareT2Center 2 жыл бұрын
Great to hear about other means and methods. So many variants on the theme. The needs change with geography, climate, road design, etc. and the methods change with contractors and machinery and so forth. Thanks for the comment.
@tracemanning7088
@tracemanning7088 2 жыл бұрын
We do highway and airport work in California. We do it very different.
@DelawareT2Center
@DelawareT2Center 2 жыл бұрын
There are a wide variety of means and methods and this is just one approach by one contractor and local agency.
@dustinbrandel59
@dustinbrandel59 Жыл бұрын
All roads need massive stones buried beneath them, along their whole length. Like roman roads.
@rossshepherd2371
@rossshepherd2371 2 жыл бұрын
Why is the cutter/tiller not injecting water when doing the 12' cut. If you inject water with the pass than you dont have to come back and water the road everyday with water truck for 7 days. Sub base is done the same day and sealed off and cured to full within 30 days?
@DelawareT2Center
@DelawareT2Center 2 жыл бұрын
Means and methods vary by the contractor and the job. For example, when a milling machine is used rather than a reclaimer, I've often seen them inject water with the mix. However, it is important to keep the surface wet for several days, often the specs call for a week, to ensure that the cement can go to full hydration through the cross section.
@rossshepherd2371
@rossshepherd2371 2 жыл бұрын
when using just a milling machine they are just milling off approximately 2" correct to than come right behind and just resurface. And when just milling off 2' they use water to keep their drum cool and that prolongs the use of the teeth on the drum. But when using a tiller and if you go thru the asphalt and just get into 2" of dirt or soil. That dirt or soil will cool off the drum to where you don't need water but if you're just milling off just asphalt with no soil, the waters what keeps the drum cool and saves the carbide tip teeth. Here in midwest we inject water (lots of water) right in when tilling the cement into the soil and by the next day it is well within the specs of compaction and hardness.
@jamesnewell8698
@jamesnewell8698 2 жыл бұрын
@@rossshepherd2371 Agreed... when we were doing this in northern Alberta we had the same WR2000 we would inject water when mixing with the powder and soil to get a heavy thick clay like material then sheep pad it then set it to grade then smooth drum
@brentonholmes6860
@brentonholmes6860 Жыл бұрын
Nowhere near wet enough. The finish should be tight, not dusty like that
@tophauler8626
@tophauler8626 2 жыл бұрын
aggravating getting behind these things
@SG-uh6sw
@SG-uh6sw 2 жыл бұрын
You should get in front then
@Scoot8428
@Scoot8428 2 жыл бұрын
Seems your taking longer then normal compnies, i dont get it three pieces of equipment is all you would need
@DelawareT2Center
@DelawareT2Center 2 жыл бұрын
The work was performed by an independent contractor and we were just observers (and amateur videographers). What we see is that contractors use a wide range of means and methods to do this and other work. We scratch our heads also at times, but then, it's easier to talk about it then do it, so we defer to each contractor's approach.
Chip Seal over Full Depth Reclamation of Road Subbase
6:43
Delaware T2 Center
Рет қаралды 20 М.
Restoring Road Subbase with Full Depth Reclamation
4:38
Delaware T2 Center
Рет қаралды 50 М.
UNO!
00:18
БРУНО
Рет қаралды 4,9 МЛН
SCHOOLBOY. Последняя часть🤓
00:15
⚡️КАН АНДРЕЙ⚡️
Рет қаралды 13 МЛН
女孩妒忌小丑女? #小丑#shorts
00:34
好人小丑
Рет қаралды 56 МЛН
My Cheetos🍕PIZZA #cooking #shorts
00:43
BANKII
Рет қаралды 27 МЛН
Standard Laboratory Controls For Soil-Cement Mixtures
17:21
Ohio LTAP Center
Рет қаралды 16 М.
WR Series - Soil Stabilizer and Cold Recycler EN
7:35
Wirtgen Group
Рет қаралды 31 М.
Why Retaining Walls Collapse
12:51
Practical Engineering
Рет қаралды 3 МЛН
Soil Cement Base Course for Roadway Construction
4:36
Delaware T2 Center
Рет қаралды 10 М.
Pavement Preservation with Slurry Seal
16:22
Delaware T2 Center
Рет қаралды 54 М.
Full Depth Reclamation Process at DRYCO
3:03
DRYCO Construction
Рет қаралды 258
How are Underwater Structures Built?
8:18
Practical Engineering
Рет қаралды 6 МЛН
Not many people know the secret of this tool!!
3:01
Sanan
Рет қаралды 4,1 МЛН
UNO!
00:18
БРУНО
Рет қаралды 4,9 МЛН