Рет қаралды 4,278
Time is money. On construction sites, this not only applies to the performance of a crane, but also to its assembly and maintenance characteristics. The faster a crane is ready for operation, the more cost effective it is. This premise was the top priority when developing the new WOLFF 235 B. In terms of performance, it replaces the popular WOLFF 224 B and ranks between the hydraulic WOLFF 166 B and the next larger WOLFF 275 B in the lower load moment range, thus fulfilling the demands of construction sites with a high volume of concreting work on high-rise buildings.