No video

Two Parting a load line on an Altec Digger Derrick

  Рет қаралды 8,909

Altec Incorporated

Altec Incorporated

Күн бұрын

Refresh your knowledge of two-parting a digger derrick load line and calculating lifting capacity for two parts of line.
Learn more: Register with Sentry Online and view the full video here: store.altecsen...
…or call 205-208-8260

Пікірлер: 3
@kobecurley
@kobecurley 4 ай бұрын
Any info on the rating of that rigging point?
@culbyj3665
@culbyj3665 Жыл бұрын
so basically u need to have a snatch block greater in WLL in excess of 30k LBS? does altec recommend a safety factor in WLL When Rigging a two parted Line? We just received a 2023 3 stage Digger derrick and there wasn't much clarification on Working Load Limits.. This video was somewhat helpful. Can You explain further plz reach out
@pdou6796
@pdou6796 6 ай бұрын
WLL is a calculated fraction of breaking strength, so consider that WLL provides the necessary safety factor by default. Your snatch block must have a capacity greater than the weight of the load hanging from the hook, since the snatch block carries the full weight of the load. Likewise, the winch line rated working load, or single line pull, already has the safety factor figured in. ANSI 10.31 requires digger derrick winch line to have a safety factor of 5 to 1. Just ensure the winch line pull is not exceeded and your safety factor is intact. When 2-parted, each part of the winch line above the snatch block will carry 1/2 (half) the total load weight. Check the capacity of each component of the lifting system, including the rigging, so you don't overload any individual component. When lifting at maximum capacity, remember that all capacity values are for static loads. This includes the capacities listed on the load chart. Rough or abrupt movement can dramatically increase the forces on the lifting system and can exceed capacity. This could result in loss of unit stability or structural damage, which puts everyone in danger.
How to dig a hole and set a pole
17:29
Altec Incorporated
Рет қаралды 23 М.
CCO Digger Derrick Operator Candidate Video
18:07
CCO Certification (NCCCO)
Рет қаралды 19 М.
黑天使遇到什么了?#short #angel #clown
00:34
Super Beauty team
Рет қаралды 43 МЛН
Please Help Barry Choose His Real Son
00:23
Garri Creative
Рет қаралды 21 МЛН
小丑把天使丢游泳池里#short #angel #clown
00:15
Super Beauty team
Рет қаралды 41 МЛН
Load Angle Chart
2:48
Northwest Lineman College
Рет қаралды 30 М.
PRINOTH ALTEC electric utility video
16:24
Prinoth
Рет қаралды 15 М.
Let's Talk Oxy Acetylene
18:52
This Old Tony
Рет қаралды 1,8 МЛН
Elliott D86
4:07
ElliottEquipCompany
Рет қаралды 585
Setting Three Phase Poles
3:48
Kankakee Valley REMC
Рет қаралды 21 М.
How to use Altec DL/DM Digger Derrick Optiview controls?
2:31
Altec Incorporated
Рет қаралды 8 М.
Log Arch - Urban Logging Trailer Build Pt 7
20:06
Matthew Cremona
Рет қаралды 206 М.
Sawing Lumber With Water Powered Sash Sawmill at Leonard's Mills
8:11
buying a crane / derrick digger
24:56
charley + sarah
Рет қаралды 2 М.
Pole Setting: Utility Line Technician
14:19
CTE Skills.com
Рет қаралды 197 М.
黑天使遇到什么了?#short #angel #clown
00:34
Super Beauty team
Рет қаралды 43 МЛН