Рет қаралды 318
1:30 -- #29 comes out of the shop
2:35 -- I do play some music for a bit here while we take a look at the full train, waiting for them to take off
4:34 -- This is when the sound is properly synced
6:00 -- Train on the mainline, "you guys wanna get water?"
7:13 -- Blow-down begins
8:37 -- Train begins trip up to Depot
11:04 -- Train goes under old trestle frame
Follow the Candy Cane Express from the air as the crew readies the train for the last day of operation in 2022.
Welcome to this long-format Virginia & Truckee Railroad (V&TRR) video. It's about 16 minutes long if you include the drone returning to the shop from the depot. This video is drone footage but there is sound for most of the video. I used an Air 2S DJI drone and a Zoom H2n mic to get the sound.
We show the #29 coming out of the shop, coupling to the consist for the Candy Cane Express / Train O'Lights train, and backing up to the mainline. There they blow down the boiler, releasing huge clouds of steam!
From there the train heads up to the depot and we follow all the way along.