We share some ideas without imposing anything on others. Try to benefit from what suits you or some ideas within the installation if it is suitable for you in reality.
One of the reasons for installing a Parallel system is that when necessary, you can modify and expand the system. Here, it has been modified, and the addition of batteries according to demand enables it to operate for 24 hours without any external power source. The explanation on this matter is lengthy.
However, a note before any comments: the project is implemented on the ground, and each site has its specific requirements, so everyone works according to their request. We provide an idea about our work with a guarantee as well.
1. Detailed explanation of the installation of Deye 8kw with accessories: [Link]( • Solar installation + @... )
2. Explanation of connecting the Parallel system, Volttronic 8kw: [Link]( • هاذا الفيديو مخصص لكل ... )
3. Video defining the charging settings in Deye inverter: [Link]( • تعريف برمجة الشحن الخا... )
4. How to define a lithium battery through BMS 8.7kw/10kw/12.5kw/15kw: [Link]( • شرح مهم جداً.♥️ كيف يم... )
5. How to activate Smart load to protect the battery: [Link]( • تعريف برمجة الشحن الخا... )
6. Installation of a three-phase elevator system, 11 floors, Felicity Inverter 15kw: [Link]( • تركيب نظام أنفرتر ثلاث... )
7. Modification of Parallel solar power system, 4 sets of 12kw/3ph with 24 gel batteries 200Ah: [Link]( • تعديل نظام طاقة شمسية ... )
8. Basics of Growatt 5kw inverter + installation of gel battery with consideration of charging and discharging + Longi solar panels: [Link]( • شرح أساسيات أنفرتر@Gro... )
9. How to protect against lightning during winter with all the accessories for installation: [Link]( • كيف عمل حماية من الصوا... )
10. Solar installation with Deye Inverter 8kw + Lithium battery Felicity 30kw: [Link]( • Solar installation + @... )
For more information and contact, you can visit the provided links.
We try to offer some suggestions on the ground.