Рет қаралды 30
Completion of the rehabilitation work for Manhole 204. New cable racking has been installed for network tenants and the cable vault has been thoroughly cleaned out and waterproofed. Security systems, including locking entry keys are now being installed to limit physical access to authorized parties.
Stay connected with us:
LinkedIn: / twdx-infrastructure
KZfaq: / @twdxinfrastructure