If you ever wondered what it takes to lay 14' of 8" sewermain 13' deep...here's the mechanics of it all. Enjoy the ride.

Пікірлер: 69
@koreanature
@koreanature Жыл бұрын
Wow, That's a great video. I will always cheer for you in Korea I'm looking forward to a great video. Have a nice day.
@gabebourgoin3589
@gabebourgoin3589 5 жыл бұрын
Excavator22 this is a Kobelco 350. Here in central FL we have sand , hard pan, and clay. Some suitable some unsuitable, but most of it wet.
@dougramey8668
@dougramey8668 2 жыл бұрын
Well that excavator will never have to be replaced. I fell asleep waiting for him to get the box pulled for that cut.
@gabebourgoin3589
@gabebourgoin3589 Жыл бұрын
Your slow on video too bud...trust me. 🚧
@jd470goperator7
@jd470goperator7 5 жыл бұрын
Good to see here I work for Ripa as a pipe operator
@roberthumphrey9664
@roberthumphrey9664 5 ай бұрын
The gingeraleeeee bandit haha
@236wdavis
@236wdavis 6 жыл бұрын
More videos of work please Gabe!
@brianwalker1386
@brianwalker1386 3 жыл бұрын
Very good
@cscott839
@cscott839 4 жыл бұрын
the dreaded well points been there.first time I ever did well points we had to use raw sewer to drill the well points 1500 feet 500 between mh it was bad lol.
@gabebourgoin3589
@gabebourgoin3589 3 жыл бұрын
That’s awful. I can’t imagine pointing with raw dookie. 🤔
@almohareb
@almohareb 3 жыл бұрын
Good work bro
@gabebourgoin3589
@gabebourgoin3589 3 жыл бұрын
Thank you sir.
@kylemaras
@kylemaras 4 жыл бұрын
Pretty lucky to be able to bed the pipe in native besides your base. Nice work putting the crown to the side ive fought with guys about where to put it with them saying it needs to go to the top!!??? Like wtf haha. Im confused to why your running such wide spreaders? Nice dig though bud looked good 😁. Ive been mainlining for 18 years and am currently sittin on a komatsu pc490 23 feet deep 42" storm in black heaving sand. (In the sumner valley in washington state where the mt rainer lahar went through a thousand years ago. Hard pan at 175' lol.) 2 foot below invert quarry spall over X, fabric then 5/8's around pipe jumping jacked base, pogo'd spring line jumping jack top. Pipe layer works hard for a stick doin all that and makes it hella slow De watering the whole 9.
@gabebourgoin3589
@gabebourgoin3589 4 жыл бұрын
Thanks Kyle. Why mix perfectly good bedding with the crap. I guess I’m just anal about things. I’m now a super running 10 crews and I spend most of the time shaking my head. A good crew starts with a good operator and pipelayer. If the 2 click you’ve got something. But to answer the spreader question, I was using the box to lay some large diameter RCP as well.
@12345cse
@12345cse 4 жыл бұрын
FYI tell top guys not to stand next to box have seen guys washed down one ended up in the bottom next to pipe
@TheCrustyFry
@TheCrustyFry 5 жыл бұрын
I take it this is Florida hence the palm trees. I always see you guys in the excavation business wellpoint absolutely everything down there regardless of the ground elevation and have always wondered how the ground water behaves in Florida. I do excavation work on the shore in the north east mostly on barrier islands and its all sand/mud at those low elevations and we well point it sometimes other times we use stone and lots of pumps. Once you leave the barrier islands and the elevation increases the ground water will eventually be non existent in some spots. You know when I was visiting florida on the east coast I saw a city crew installing a fire hydrant they were about 4 feet deep and they had a little well point system set up with a header maybe a 6x6 but they seemed to be at least at elevation 15 they were near the beach but they were up top a big hill and the ashy clay they dug looked like what you were digging. My question to you sir is how does the ground water behave down there is it like an artesian thing where it will boil up? In the same area but right on the road along the beach I watched a contractor set a precast storm water pump station they were maybe 13-15 foot deep and had it all sheeted up and well pointed and man those boys fought that for a few days but they got it they had a pile of sand it had to be 30 tri axel loads from digging that thing and kept loosing the hole before they sheeted it.
@gabebourgoin3589
@gabebourgoin3589 5 жыл бұрын
We do a combination of all that you mentioned. Looks dry in the video but that’s because of the points. We also use 6” perforated sock stalled with a huge trencher. Notice I’m laying in rock? The bottom is saturated clay. Not stable material for sewer. We have 4 basic soil types down here. Sand, clay, hard pan, and shelf rock or cap stone. Sometimes you need dewatering, sometimes you can outrun the water and lay on stone, but we also have good dry sand where you need no bedding. Elevation doesn’t matter much here you can find water just about anywhere you dig. Coastal or inland.
@Jake25755
@Jake25755 5 жыл бұрын
Do more mainline videos Gabe with pop evil playing! I’ve watched this video a hundered times, love this shit!
@dawidlepionka
@dawidlepionka 3 жыл бұрын
Awesome
@jeff7764
@jeff7764 3 жыл бұрын
13ft isn’t really all that deep for sewer. We’ve done shit 25-33 ft deep
@whollymollygaming2070
@whollymollygaming2070 2 жыл бұрын
Try laying 54ft
@henrywint7938
@henrywint7938 2 жыл бұрын
This time last year we were 35' down for sewer line. We were building a pump station but 50' is not uncommon,,now that will make your balls crawl back up inside ya
@gabebourgoin3589
@gabebourgoin3589 6 жыл бұрын
It’s called hard ass clay and shovel teeth on a wide bucket. Not to mention the box doesn’t help. Notice full buckets are coming off the top?
@leonallen9833
@leonallen9833 5 жыл бұрын
You can really tell who the wanna bees are that criticize vids so quick. You can tell who has experience from the comments. Nice work man I'm on the eastern shore of MD we battle water every day as well.
@wailnshred
@wailnshred 5 жыл бұрын
Don't worry about the haters.
@kylemaras
@kylemaras 4 жыл бұрын
Ya id like to know his explanation. Haha. Only thing i see thats weird ( critisize me all you want, i think this is a nice set of pipe) is why you pulled the box up out of ground before digging next set which all it does is engulf the bell making the pipelayer hand dig a bunch when you pull the box and have to beat it down again. Recommend leaving box where its at and pulling it. All in all quick set and nice work 😁
@gabebourgoin3589
@gabebourgoin3589 4 жыл бұрын
I don’t. Lay pipe! 🤣
@gabebourgoin3589
@gabebourgoin3589 4 жыл бұрын
Well the problem I was having was the box was sticking in the clay and if I got to far away the machine wouldn’t pull it free without a dance. Compensating for the conditions I guess.
@excavator22
@excavator22 5 жыл бұрын
Gabe, Are you in a 400? I'm in north Florida and most areas up here we have sand , sand and more sand! I'm bouncing between a 329e and a 336f.
@gabebourgoin3589
@gabebourgoin3589 4 жыл бұрын
350 Kobelco
@charlesbourgeois9029
@charlesbourgeois9029 3 жыл бұрын
Are these systems gravity or pressure?
@charlesbourgeois9029
@charlesbourgeois9029 3 жыл бұрын
Also what's the loader size back filling.
@dougramey8668
@dougramey8668 2 жыл бұрын
Gabe dirt goes on the pile not back in the hole before you get the pipe in. I AM JUST MESSING WITH YOU!! LOL
@barryguerrero6480
@barryguerrero6480 Жыл бұрын
Dumb question time: Why such a wide trench for such small diameter pipe?
@rye2282
@rye2282 2 жыл бұрын
how you keep it in line ?
@gabebourgoin3589
@gabebourgoin3589 2 жыл бұрын
We are running a pipe laser and my eye ball on the forward stake.
@joeabbott4588
@joeabbott4588 2 жыл бұрын
All that digging for a 8inch
@chasebusta1950
@chasebusta1950 4 жыл бұрын
Just got done with this same situation lol putting the ladder and taking all that time ain’t getting you no where. Smarter ways to be safe in with the trench box
@AlanMolstad
@AlanMolstad 3 жыл бұрын
the ladder is something that was always a concern for me and my crew when we were working. The day you skip putting it inside the trench box is the day OSHA shows up
@jeffreyzenz5534
@jeffreyzenz5534 4 жыл бұрын
Confused why the stone box if you're bedding in existing sand and how can you bed pvc in sand in wet conditions
@gabebourgoin3589
@gabebourgoin3589 4 жыл бұрын
Jeffrey Zenz I’m bedding with rock. Well points have the sand dry enough to use to go back in and compact for first lift.
@MiguelHernandez-ub3yd
@MiguelHernandez-ub3yd 3 жыл бұрын
Requirement. Forman or operator can't decide what to bed the ditch with..
@amilcaralva4613
@amilcaralva4613 4 жыл бұрын
Good video jus the music get my nerves.
@chriscolwell2963
@chriscolwell2963 2 жыл бұрын
Where's the rock
@gabebourgoin3589
@gabebourgoin3589 2 жыл бұрын
Dry conditions presented by the well points warrants rock under the structures only as per build specs. Did hit a few spots the well points weren't drying up that we had to rock.
@LUTHERJ304
@LUTHERJ304 5 жыл бұрын
Tell the new guy to stand on other damn side of ditch
@chasebusta1950
@chasebusta1950 4 жыл бұрын
Luther Blankenship lmao
@AlanMolstad
@AlanMolstad 3 жыл бұрын
Im a retired pipe layer, and your comment reminds me that the last 3 years I worked I spent about 60 to 70% of the time just attempting to keep the new guys alive.....
@chriscolwell2963
@chriscolwell2963 2 жыл бұрын
Ur machine or pipe is not center of box
@mikeznel6048
@mikeznel6048 2 жыл бұрын
Doesn’t matter. What matters is the pipe is in and the laser says it’s center.
@gabebourgoin3589
@gabebourgoin3589 Жыл бұрын
Boom is center cab isn't.
@ace74pa22
@ace74pa22 6 жыл бұрын
Go down 28 feet, than you'll see deep
@gabebourgoin3589
@gabebourgoin3589 4 жыл бұрын
Been to 30’ to set a wet well for a 8’ diameter lift station...does that count?
@salvadormendez9861
@salvadormendez9861 4 жыл бұрын
Try 33 feet
@k.schwartz3867
@k.schwartz3867 3 жыл бұрын
You get any slower digging and you're going to stop moving....
@k.schwartz3867
@k.schwartz3867 3 жыл бұрын
@LionelRichiesCrackpipe Ive dug more pipe than you can dream of. My guess is you have zero training and very little experience or were taught by someone who didn't know how to either. 13' is not deep sewer. When you hitting 20' plus then you have something to talk about. I can tell he's picking his tracks up, digging to deep into the ditch first, should be skimming the tops toward him till the bucket is full, he's not smooth, jerking stopping motions. I could out dig him two sets to his one. Especially in that sandy soil. Swinging way too far to the sides. All of that adds up to less production at the end of the day. Ive never had to pound the sides of a box that way. That tells me he has no clues and whoever is letting him do that should be fired too. Not to mention you are laying 8 inch and having to set it in with the hoe....Thats lazy. You can set that shit by hand. You can set C-900 water line by hand in 8" This is sewer pipe. That company is loosing money with these laborers and operators. They wouldn't last a day here.
@rodcody7278
@rodcody7278 3 жыл бұрын
Millon cubic yard club!
@MiguelHernandez-ub3yd
@MiguelHernandez-ub3yd 3 жыл бұрын
That's not deep...
@193theman
@193theman 5 жыл бұрын
This is painful to watch......If we dug like this around here we would be run off the first day.
@kylemaras
@kylemaras 4 жыл бұрын
Explain
@aaronmutter6021
@aaronmutter6021 2 жыл бұрын
@@kylemaras slow. slowest thing ive ever seen
@mikeznel6048
@mikeznel6048 2 жыл бұрын
What a jack ass comment. Where’s your videos? All talk…
@patrickquerry5768
@patrickquerry5768 Жыл бұрын
8 ft isn't deep dude
@gabebourgoin3589
@gabebourgoin3589 Жыл бұрын
It's 13 dude that's a 10' box. Pretty deep for Florida.
Lets lay some pipe!
25:45
DLH Farms
Рет қаралды 66 М.
Pipe Layer  pov
17:17
Hadw785
Рет қаралды 11 М.
Советы на всё лето 4 @postworkllc
00:23
История одного вокалиста
Рет қаралды 4,9 МЛН
Cat 330 Digging & Laying 900mm Concrete Pipes
10:00
Roadform Ltd
Рет қаралды 75 М.
Taking In Depth look at some of our Machine Fleet! - During Sewer Pipe Installation
16:23
Cat 330d digging and laying 60" concrete drain pipe
13:22
diggerman57
Рет қаралды 366 М.
storm drainage
14:27
Irish Diggerman
Рет қаралды 474 М.
grondverzetbedrijf reijer van der grift Volvo ew140c
14:05
Reijer Van Der Grift
Рет қаралды 232 М.
Hitachi Zaxis 470 LCH New Sewer Pipes
15:56
West Coast Construction Channel
Рет қаралды 106 М.
Elk Grove Deep Sewer - Manhole
1:18
sacsewer
Рет қаралды 64 М.