PMP Certification - Most Important PMP Exam Questions and Answers (2024)

  Рет қаралды 155,202

EduHubSpot

EduHubSpot

Күн бұрын

Are you preparing for the PMP exam? In 2023 alone, I have seen 100’s of failure stories across the internet. More and more people are failing because some of the PMP practice tests on internet gives you an impression that PMP exam is simple.
Though, I don’t mean to scare you but the reality is PMP exam have a considerable number of scenario-based questions and to understand those PMP questions, you need to know the underlying patterns. This video takes you through the 15 underlying patterns and also some of my best-selling techniques such as
• Varun Anand’s World-famous elimination technique
• Neil Armstrong technique
• Einstein technique
We have covered different types of questions:
• Fill in the blank questions
• Drag & Drop questions
• Multiple answer choice questions
• Scenario based question
• Mathematics question
Normally, we don’t record PMP exam questions and answers videos because it takes lot of effort at our end. However, if you want to access those videos, below are the links.
First video I recorded in 2019 was on PMBOK 6th edition. Some more argue that this video is no longer valid but I beg to differ because this video is not about PMP questions. Watch this video to understand how I am eliminating the wrong choices. That is what you have to learn.
Do check out the link for Video: • PMP Exam Questions And...
Second video, I recorded was on PMP exam content outline or PMBOK 7th edition was 2021 and this is a very important video as well.
Do check out the link for Video: • PMP Questions and Answ...
I really feel proud when people says that they are grateful for our free content which has helped them to pass PMP in first attempt with above target. Do check thousands of comments from people around the world for this videos & every videos, which we consider as their blessings & love for us & our channel.
During our video, I talked about many other PMP related videos which you can check out below.
PMP Most Important Video Before Actual PMP Exam:
• PMP Most Important Vid...
Lot of people get confused on Types of Project Life Cycles. So we recorded a video on that. Here is the link:
• PMP 2024: PMP Exam Pre...
If you have any questions, you can reach out to our support team at services@eduhubspot.com
If you want Mentor Varun’s direct email then you can reach out at varun.anand@eduhubspot.com
If you want to know about our world famous PMP bootcamp, you can check out this link: www.eduhubspot.com/course-det...
If you want to know about our PMP mentor program, you can check out this link: www.eduhubspot.com/mentorship...
Finally, if you want to get free access to our PMP Exam Content Outline tool, just shoot a message to our support team and during a zoom call they will send you that.
Connect with us on WhatsApp: wa.me/message/XVI7DMTEACX7L1
Check out our website now: www.eduhubspot.com/
Happy Studying!
#EduHubSpot #PMP #PMPExamPrep #PMPCertification
Timestamps:
Introduction: 00:00:00
Question 1 : 00:04:32
Question 2 : 00:09:55
Question 3 : 00:15:05
Question 4 : 00:19:36
Question 5 : 00:26:41
Question 6 : 00:33:23
Question 7 : 00:37:56
Question 8 : 00:42:54
Question 9 : 00:49:18
Question 10 : 00:52:15
Question 11 : 01:01:09
Question 12 : 01:04:18
Question 13 : 01:07:45
Question 14 : 01:11:22
Question 15 : 01:13:04
Behind the Scene : 01:17:21

Пікірлер: 16 000
@EduHubSpot
@EduHubSpot 2 жыл бұрын
Timestamps: Introduction: 00:00:00 Question 1 : 00:04:32 Question 2 : 00:09:55 Question 3 : 00:15:05 Question 4 : 00:19:36 Question 5 : 00:26:41 Question 6 : 00:33:23 Question 7 : 00:37:56 Question 8 : 00:42:54 Question 9 : 00:49:18 Question 10 : 00:52:15 Question 11 : 01:01:09 Question 12 : 01:04:18 Question 13 : 01:07:45 Question 14 : 01:11:22 Question 15 : 01:13:04 Behind the Scene : 01:17:21
@sumeshunnithan
@sumeshunnithan Жыл бұрын
1. D . Since the assignment is security classified , I tried to remove remaining options. 2. D. A well defined success criteria with customer is definitely avoid all the gaps in expectations 3. A. Testing team will start the validation after the completion of the development of all requirements. 4. B & D. The functional failure is seen on post delivery. So there is a gaps in definition of ready. This has to be explained. Also the fix was come out from an individual, he has to explain the risks and lessons learned post quick fix integration 5. predictive life cycle --> A project where scope, cost and time will be determined in the early phases of life cycle. Interactive life cycle --> A project where the scope is determined early in the project life but time and cost will be constantly modified. Teams will do series of repeated cycles until it reaches perfection. Incremental life cycle --> Scope is constantly changing for new deliverable, butt rollout of the deliverable would be done in a known phased approach. Hybrid life cycle --> A project which needs to be launched in the market as quickly as possible 6. D. Ensuring the format validity is the prior step before the other steps. 7. A & E. To keep the engineers familiar with their current job. 8. Analogous Estimating --> Some of the activities on the project have been done previously in some other similar project Parametric Estimating --> For the some of the activities , a range of estimates is preferred due to insufficient historical data Three point estimating --> Cable installation activity is directly proportional to the number of labor hours put in by the staff Bottom up Estimating--> LaKedra is planning to use WPs to estimate and make her way up on the WBS 9. D. This must be aligned with the project stake holders as the impact on timeline and budget is inevitable after 60% of project completion. 10.A & C. Options are derived directly from the figures given. 11. Avoid - I don't have time to deal with this right now. You both can take a decision on your own Smooth - I heard that you both did a great job in resolve the phase 1 issues. Good job and keep it. Compromise - Do half development as per Ron and other half as per Susy. Problem solve - Let's talk about the issue and reason for favoring one approach over the other. Once we discuss the viewpoints, lets adopt a solution which is good for the project 12. Activities - A direct reflection on what to accomplish 13. B & D . Kanban board will help to maintain the frequent tracking. Common milestones and overall dependency NW will ensure the alignment consistency. 14 A . CR will record the data for further steps and references. 15. B . Backlog refinement may help to explore options to avoid patented component dependency.
@satyaserene
@satyaserene Жыл бұрын
1. B - have retrospectives, so that feedback can be incorporated. 2. A - continuous retrospectives on the increments eliminates the surprises at the end of the projects, making sure customers be happy with end product. 3. D - once you finish once phase of all developments, you are into finishing testing the individuals. 4. B & C - deninition of ready & done will help. 5. Predictive - where scope, time, cost are dtermined in early phases Iterative - Project where scope will be determined, cost & time will be modified; because its repetetive, team doing series of repeated cycles until perfection Incremental - Project needs to be launched in market as soon as possible Hybrid - Scope is changing, other deliverbales are done in known phased approach 6. D - since its legal issue, any new modulation should be checked with compliance team. 7. A & B - as team may be lacking motivation and need creative spike; there seems there is enough tenchincal expertise in the team 8. Analogous - Cable installation is directly proportional to number of labor hours put in Parametric - Some activities on project have been done previously in some other similar project Three point - For some activities, a range of estimates is preferred due to insufficient historical data Bottom Up - Planning to use work packages estimate and her way up on WBS 9. D - as there is change reflecting in the schedule and budget, change request needs to be submitted informing to stakeholders 10. A & C - as 20k$ should be spent by time of 20% work done, actual spent is 15k$, so its under budget and schedule planned should be 30% work to be done but only 20% done, so 10% lack in schedule 11. Avoid - I dont have time to deal, you both take a decision on your own Smooth - I heard that you both did a great job in resolve phase 1 issue, good job and keep it up Compromise - Do half as per Ron and other hald per Susy Problem Solve - Lets sit and talk and reson for favor in approach over other. Once we discuss, lets adopt a solution good for project. 12. A - WBS has all activities listed into it. 13. B & D - common kanban boards can be used to see progress of both teams and also common milestones with overall dependency network which syncs the both teams deliverables 14. B - Since its disregard to legal requirements that changes are proposed, verify with organisation legal team for guidance. 15. B - since its legal issue, its better to perform backlog refinement working with compliance team
@NitinKumar_utube
@NitinKumar_utube Жыл бұрын
Question; 1 I choosed A because common E- Kanban is the best option to let everyone know what is going in project. I have also confused about option C but I little know about scrum of scrum. 2 This is obvious that continous and increment feedback is the strength of agile mindset. Hence conflits can be avoided further we one get incremental feedback rather than a unexpected outcome later. 3 I did not know about this answer. 4 I eliminated A & E since these were not the solutions. Among C,D, B, think C& D are the correct close one. 5 Its about PLCs. That’s quite explanatory. 6 When there is a legal mandate & a blocker to implement it, Once should first reach out to legal team to determine the solutions and way round. 7 Motivation & Meetings about the problem may help to increase the productivity. I am partially correct. 8 Its about estimation methods. That’s quite explanatory. 9 D comes out as an extreme next option to choose & this will help PM to move on with the right mindset. 10 While following SV & CV formula, it helped to choose the answer. 11 I learnt it in Eduhubspot 1st class. All self explainatory. 12 I did not know about this answer. 13 I did not know about this answer. 14 If there is an legal impact, First one should discuss with the legal team before an direct actions. A,B,C are direct actions which cant help. 15 B solving the problem.
@aleksandramodrow9863
@aleksandramodrow9863 Жыл бұрын
Q1: C - scrum of scrums because it is a scaled agile technique that offers a way to connect multiple teams on more frequent basis to work together to deliver solutions. Q2: A - obtaining feedback on incremental more frequent basis to ensures that the consumer’s success criteria are being met. Q3: A - this dependency demonstrates that one activity must be fully complete before any following activity may begin. The development of all the requirements must be fully completed before testing individual modules may begin. Q4: C and D - The work is already completed in this scenario. Examination and identification of gaps in Definition of Done could help the team figure out the solution to the problem and prevent this from happening in future because it helps to answer the q’s of what’d did we miss, what went wrong. Additionally, understanding what the Team Member’s rational was for solving the problem the way he/she did, helps identify gaps in his/her thinking/approach. That combined with identification and analysis of lessons learned (why this things happened, what could be done to prevent it) contributes to prevention of the same issues in future. Q5: A-Iterative Life cycle; B-Predictive life cycle; C-Hybrid life cycle; D-Incremental Life cycle Q6: D - since this is a new regulation checking in with Compliance Team and making sure the application of fold-out flap meets the legal requirements (is in compliance with) of the Regulation should be the first step. Once confirmed the team can move on to the next steps, which would be updating sprint backlog and making sure the lanes are ready for printing the following week. Q7: C and D - adding T-shaped profiles may help because they have specified design engineering knowledge and skills but also have more general knowledge in the areas that cover execution of the new duties assigned to the team. Getting help to mentor the team on how they can combine their new duties with their design work would equipped them with skills necessary to execute their work effectively and efficiently. Q8: A - Bottom up; B - Three point estimating; C - Analogous estimating; D - Parametric estimating Q9: D - before any changes are made, the project manager needs to figure out what the updated delivery date and budget would be based on the circumstances . Once that done he/she should communicate with project stakeholders and submit the change request for approval before any “action” of changing is done. Q10: A and E
EV = 100,000*0.2= $20,000 SV= EV-PV -- PV cannot be determined based on the scenario CV = EV-AC = 20,000-15,000 =5,000 >1 Below Budget Q11: A - Compromise; B - Avoid; C - Smooth; D: problem solve Q12: A - the goal of WBS is to have work to be broken into smaller and more manageable components, which are activates. The activities are big enough to allow tracking of completion of each of them by team members. Q13: B and D- common Kanban Board would help to visualize the work of both teams, limit the WIP so there is no confusion, and increase efficiency. Creating common milestones and dependency network will allow both teams to break the silos and work more as a cohesive unit with clear delivery/milestones/work dependency and sequence expectations. Q14: B - implementing those alternations may cause critical compliance issues. Verifying with legal team for guidance hour be the first step before any actions are taken Q15: B - working with legal department and team on refining the backlog would ensure legal compliance and reduce the risk of potential intellectual property legal issues
@sripari93
@sripari93 Жыл бұрын
This is my first day of learning with nearly no agile knowledge or experience other than it’s use, so will be answering these at the moment without the PMI hat. 1. Unsure between A and C, electronic kanban board (basically common visualisations of activities) could work. Scrum of scrum layer i assume is a scrum between 2 different scrums(and by extension, 2 different teams with varying priorities), could work as well, as you might be able to align common goals/priorities together with the supplier. 2. A. As i feel with proper feedback on each release, the requirements could have been captured better. C was also in contention for me as the the scope/vision could have been laid out well initially itself. 3. A. Activity X has to finish for Y to begin. Possibly on critical path too. 4. C and D. Identifying scope gaps and trying to learn from the team member’s approach to solving the problem seem appropriate. 5. Predictive- 2, Iterative- 1, Incremental- 4, Hybrid- 3. Was confused if hybrid fit 3 or 4, but the key word was product launch needed to be asap 6. Unsure between C and D but probably leaning towards D. C could work as the team decides to solve the problem, hence add the scope into the backlog, not necessarily the unapproved solution. D Could work as the compliance team can approve/ disapprove of potential solution. 7. Unaware of most terms on there at the moment. Answering without the PMI hat, D & E are out, so I’ll go with A and B. 8. Unaware of these techniques at the moment. Answering without the PMI hat, i think Bottom up-1, parametric-2, analogous -3, 3 point -4 9. Unsure between B and D. A sounds like paperwork, that’s out for me. C is out, as it’s not the resource’s fault. B could work but is it fair to put all responsibility on the other members without knowing if they have the skillset? D as a statement doesn’t make sense to me, because if the stakeholders include a client, why do they have to live with a revised schedule and budget? Also don’t you submit a change request to a customer for out of scope or additional work? Why would you submit that to a potential client for someone from your team being removed by probably your executive. 10. Simple math. A and C, behind schedule, under budget 11. Avoid- 2, Smooth- 3, Compromise- 1, Problem solve- 4 12. Unsure between A or D 13. B and D sound right to track and visualise deliverables 14. B. Go to legal first 15. B sounds right. Work with the legal team to fix the backlog. C sounds a bit extreme, as that would stop work.
@misterjiggles5041
@misterjiggles5041 Жыл бұрын
I have no idea how you have the time to reply to every comment, but it's exactly the reason I chose your site. Anyone who works this hard definitely has my respect. Your questions are exactly like the course material and the video is REALLY helping me. This is perfect. I have a long way to go, but my application should be approved any day now (mine got audited, naturally) and then it's go time. Oh, and I love your accent! Don't apologize for talking so much, it's what we're here for!
@EduHubSpot
@EduHubSpot Жыл бұрын
Thank you so much for an amazing comment which is a blessing for me. Me & my team is working defiantly very hard to avail the best content for the PMP aspirants to ace PMP in their first attempt. Varun
@mayurmanjunathaiah
@mayurmanjunathaiah Жыл бұрын
@@EduHubSpot I believe it's not whether they have time to reply to each comment. It shows the commitment and dedication towards students and their ethics. After attending just 1 intro video and watching 1st video of Varun itself, my thought process has changed on how to look at solving the questions. I'm just sharing my thoughts and nothing otherwise 😊
@abhisheks.4745
@abhisheks.4745 7 ай бұрын
Q8. A- Bottom up B- Analogous C- Parametric D- Three Point Wasn't sure about the definitions of any
@abhisheks.4745
@abhisheks.4745 7 ай бұрын
Q9. B, as it's important to keep the team members informed and ask them to take up the work to complete the project on time
@maryyatuwa1320
@maryyatuwa1320 5 ай бұрын
Thanks for this video it was so helpful.
@clarissejumagdao5261
@clarissejumagdao5261 2 жыл бұрын
Questions can really get tricky! I really love the importance of understanding questions by scanning for keywords. The techniques such as Einstein, Neil Armstrong and process of elimination really came handy in answering questions as you get to be more focused in what is being asked so you can come up with better answers . Great Video #Eduhubspot !
@EduHubSpot
@EduHubSpot 2 жыл бұрын
Thanks Clarisse for your lovely comment & loving my different techniques. Good Luck !!! Varun
@EduHubSpot
@EduHubSpot 2 жыл бұрын
Congratulations on securing the 1st position in the contest, Clarisse! You get an Amazon Gift Voucher worth $50. Kindly email us at services@eduhubspot.com to claim your reward.
@itsmechicpalak
@itsmechicpalak 4 ай бұрын
amazing video Varun, thanks a ton!!! the knowledge you've given us free of cost is invaluable. you're an amazing amazing teacher!!
@EduHubSpot
@EduHubSpot 3 ай бұрын
Thanks for a wonderful comment which motivates us to make more free content for PMP aspirants. Varun
@mayasgarak
@mayasgarak 7 ай бұрын
Thanks a lot Varun. The video has given better understanding to prepare a roadmap for the PMP exam. Looking forward for the training starting in 3rd week of Jan'24.
@EduHubSpot
@EduHubSpot 6 ай бұрын
Your Most Welcome !! Thanks for loving the video. All the best for your training. Varun
@sijoshvasavan4990
@sijoshvasavan4990 7 ай бұрын
Great video and a lot of new concepts to learn. Most of the questions that i answered followed elimination technique by trying to get keywords from the questions asked and filtering out the most appropriate answer. My answers to all questions along with my understanding is given below. Q1: Option C - Agile is the most popular project management approach with Scrum being the most popular methodologies followed. This seemed to be the most appropriate one comparing the remaining options. Q2: Option D - The question referred to Agile project management. My mindset to choose option D was because this one spoke about scrum concept like stories and it completion. Q3: Option B - This looked quiet straight as i went by the detailed explanation of the question to select answer. Never thought it should be flipped. Q4: Option B and D - Looked to me like there was a gap in the definition of done so selected B to ensure the gap in definition of done gets covered in the definition of ready. Q5: Predictive Life Cycle: A project where scope, cost and time will be determined in the early phases of life cycle. Iterative Life Cycle: A project where scope will be determine early in the project life cycle, but time and cost will be constantly modified. Team will do series of repeated cycles until it reaches perfection. Incremental Life Cycle: Scope is constantly changing for the new deliverable, but rollout of the deliverable would be done in a known phased approach. Hybrid Life Cycle: A project which needs to be launched in the market as quickly as possible. Q6: Option D - As regulations are involved, it is best to consult with Compliance to check how long the product is valid. Q7: Option A and E - As a new additional task was added into the iteration, i assumed extending the iteration made more sense. Q8: Honestly dont know much about estimation technique and did a wild guess on matching the answers. Analogous Estimating: For some of the activities, a range of estimates is preferred due to insufficient historical data Parametric Estimating: Some of the activities on the project have been done previously in some other similar project Three-Point Estimating: Cable installation activity is directly proportional to the number of labor hours put in be the staff Bottom Up Estimating: LaKedra is planning to use work packages to estimate and make her way up on the WBS Q9: Option D - It is best to keep the stakeholders informed to keep them informed. Q10: Option A and C - Team progress is 10% behind where it should be, but should have involved $20,000 (20% of budget), of which $5,000 less has actually been spent. Q11: Avoid: I don't have time to deal with this right now. You both can take a decision on your own Smooth: I heard that you both did a great job in resolve the phase 1 issue. Good job and keep it up Compromise: Do half development per Ron and other half as per Susy Problem Solve: Let's sit and talk about the issue and the reason for favoring one approach over the other. Once we discuss the viewpoints, let's adopt a solution which is good for the project Q12: Option A - Tried eliminating the incorrect options and arrived at A. Q13: Options B and D - shared items would facilitate increased collaboration between the teams Q14: Option B - as the legal team would be best to address any concerns with legal requirements Q15: Option D - Saving cost seemed to be appropriate as majority work was complete and associated budget used.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Question 2 : Another good question, if the all stories has been completed, it means they have met the DoD. Option D is eliminated. Option C, a product backlog is dynamic, it changes based upon the feedback, it is prepared by the Product Owner who has a clear understanding of the. customer being its representative. Option B is eliminated. Option B is eliminated because the test plan is only to make sure that the acceptance criteria is met. Option A is the best answer because Agile is more on getting constant feedback and involvement from the customer. Correct Ans A Question 3 : If you know my flip technique, then you know the answer is Finish to Start (key words cannot BEGIN until dev COMPLETED) Correct Ans A Question 4 : Option A is an extreme choice. it is not giving the Director a solution. I remembered in engagement, before coming up to the executives, you need to come up with a solution and not just say it will be corrected. Option B - Definition of Ready will ensure that requirements are clear and before beginning the work, this should be established. At this point, the work has already been selected for that iteration. Option C is a good choice because definition of Done will ensure that the functions are working and meets the acceptance criteria and more importantly, the functions are working and it passed testing. Examining this can fill in the gaps on WHY the scenario happened. Option D is a good choice because this is taking ACCOUNTABILITY of the work done and recording the lesson learned to prevent this from happening in the future. Option E is an extreme choice. Correct Ans C & D Question 7 : There is a problem and you do spike to find out that problem. So A is a good choice. Option B is not a good choice because the question is on productivity and motivation. Option C is a good choice because Agile Team should be cross functional and generalized experts/ team member can help when we have requirements facing with different competencies. Option D is not a good choice because the problem is not about creativity. Option E is not even an option. We don’t do that. Time is fixed in Agile. Correct Ans : A & C Question 8 : A-3, B-2, C-4, D-1: Below are the keywords. Bottom Up - use work packages to estimate all the way up on the WBS. Parametric - Cable installation is directly proportional to number of labor hours. Analogous.- From previous similar project. Three point - range of estimates (triangular, standard, beta, variance) Question 12 : Activities come after WBS, so A is out. Bar chart and WBS are two different things all together, so B is out as well. List of risks are part of risk register, so C is out. Only option left is D which is team buy in. You want team to agree on whatever deliverables are assigned to them, so D is the best choice. Correct Ans D Question 15 : A - closing the project should be discussed first in a kill-point session to ensure everyone is on the same page. This is also an extreme choice. C is not a good choice because it of LEGAL issues with the current design. D is also an extreme choice. B is the best choice because knowing which features are patented can be removed and alternate solutions can be added in the backlog and reprioritized. Correct Ans B I read all your comments, overall good job and thank you for participating. Varun
@edwardbyaruhanga55
@edwardbyaruhanga55 7 ай бұрын
Thank you Varun for such a detailed video! I really enjoyed it.
@EduHubSpot
@EduHubSpot 6 ай бұрын
Thanks for loving my video ! Varun
@kalyanrao8634
@kalyanrao8634 2 ай бұрын
Just 13 minutes into the video- first class video, first class explanation. The way you broke the question into parts and explained to us is commendable.
@EduHubSpot
@EduHubSpot 2 ай бұрын
Thank you so much loving the video. Varun
@user-ho4fp3ge6e
@user-ho4fp3ge6e 8 ай бұрын
Thanks.... really good and tricky questions, your did with great effort for understanding.
@EduHubSpot
@EduHubSpot 8 ай бұрын
I am glad you loved my video. Thanks for watching. Varun
@juliebannerjea1698
@juliebannerjea1698 3 ай бұрын
Hi Varun, this video was excellent. Great new concepts and appreciate the definitions! Super helpful so much info and having recap of definitions really helped
@EduHubSpot
@EduHubSpot 2 ай бұрын
Thank you so much for loving the video. Varun
@user-mo3jl7de1b
@user-mo3jl7de1b 6 ай бұрын
Thank you Varun. Really enjoyed the video. You make PMP sound easy
@EduHubSpot
@EduHubSpot 6 ай бұрын
Glad you liked it !! Varun
@abhinavmishra3404
@abhinavmishra3404 7 ай бұрын
Answer 15: B) Will work on Backlog refinement and closely discuss with Legal Team - Logical Step. Thank You Varun and Entire EduhubSpot Team for making suck a interactive video. How knew, learning can be fun as well. Love the enthusiasm showed by Varun in entire video. The passion is "Real".
@EduHubSpot
@EduHubSpot 7 ай бұрын
Really loved your thought process. I need to steal this reasoning. Hahah !! Varun
@amitprusty3941
@amitprusty3941 7 ай бұрын
8. Analogous: some activities have been done previously, comparing with the similar nature of previous projects. Parametric: effort is estimated on one unit and numbers are used to calculate by multiplying with total number units. Three point: estimate the best, worst and average case as no clear details available. And then reach to a conclusion. Bottom up: estimate for small work package and then reach up to the activity/WBS/project.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Question 8 : A-3, B-2, C-4, D-1: Below are the keywords. Bottom Up - use work packages to estimate all the way up on the WBS. Parametric - Cable installation is directly proportional to number of labor hours. Analogous.- From previous similar project. Three point - range of estimates (triangular, standard, beta, variance) Varun
@user-ds5tg3ly6p
@user-ds5tg3ly6p 6 ай бұрын
Hi Varun , You spent lot of time to prepare it & I really respect to it. Its really clear the concepts & help in understanding the fundamentals. Great work by you & your backend team.
@EduHubSpot
@EduHubSpot 6 ай бұрын
Thanks for a wonderful comment & loving the video. Varun
@user-wr4kj5kh5t
@user-wr4kj5kh5t 4 ай бұрын
Very useful information and examples given while explaining the answers. Thank you
@EduHubSpot
@EduHubSpot 4 ай бұрын
Glad it was helpful! Varun
@kaurmanpreet123
@kaurmanpreet123 6 ай бұрын
Very much to the point questions actually asked in PMP exam. Very informative and detailed.
@EduHubSpot
@EduHubSpot 6 ай бұрын
Thanks for loving the video. Varun
@siruvanti
@siruvanti 23 күн бұрын
Thank you very much Varun. This is a great video lesson which I got in the beginning of PMP journey. Thanks
@EduHubSpot
@EduHubSpot 17 күн бұрын
I am glad you loved the video. Varun
@khaledahmed1880
@khaledahmed1880 2 ай бұрын
Excellent video, Varun! I appreciated the hard work you have put into this for us. Regards, Khaled
@EduHubSpot
@EduHubSpot Ай бұрын
Thanks for loving the video. Varun
@poupettetraore
@poupettetraore 3 ай бұрын
Very well explained thank you so much!
@EduHubSpot
@EduHubSpot 3 ай бұрын
Glad it was helpful! Varun
@patriciadeangelis9475
@patriciadeangelis9475 8 ай бұрын
Q10- B + C were my initial selections, before watching your explanation and learning about the formula. Thank you for this most logical explanation I really appreciate it!
@EduHubSpot
@EduHubSpot 8 ай бұрын
Question 10 : It is behind schedule (C because work completed is less than planned) and is under budget (A) because at 20%, the cost 20,000 cost based on efforts x rate and the actual is only $15k Correct Ans A & C Varun
@panitjedsadawaranon737
@panitjedsadawaranon737 7 ай бұрын
Thank you very much Varun. Now I passed PMP exam. Hope to see you continue doing such a great work!
@EduHubSpot
@EduHubSpot 6 ай бұрын
Many Congratulations ! Thanks for a wonderful comment, I am very happy that my video has helped in your PMP journey. Varun
@sujatarajput7800
@sujatarajput7800 2 ай бұрын
Thanks a lot Varun for the awesome video. got lot of new learnings
@EduHubSpot
@EduHubSpot Ай бұрын
My pleasure 😊 Varun
@PennyGosnell-yd2wk
@PennyGosnell-yd2wk 4 ай бұрын
I completed these questions after I did the HW#2 chapter quiz. I missed 5 of 15 questions on this one but I did learn a great deal from the explanations you provided on these questions. My trouble questions were: Q1: I chose A. I missed the boat on the Scrum of Scrum concept. Q2: I chose D. I didn't pick the best choice. Q6: I chose B. I didn't really connect that this was a compliance issue, so didn't pick the best choice. Q8: I got the Bottom up and Analogous estimating techniques correct. I mixed up the 3 point and Parametric estimating techniques. Your keyword explanations helped me have a better understanding of these, but I'll need to make sure I spend more time studying these techniques. Q12: I chose A. I missed the point that the team buy in is the most valuable deliverable of the WBS. AS a side note, I got Q10 correct, but I really didn't fully understand how I got the answer until I watched your explanation of these values. Earned value is a tough topic for me!
@EduHubSpot
@EduHubSpot 3 ай бұрын
Question 1 : Identify the problem in question. Problem is that your day is filled with meetings but you still want to know what’s going on. This is a real problem and real problem can be resolved by doing a scrum of scrum meeting. Coming up with a Kanban board is also good but still you are not meeting or its not really the best. Coming up with fishbowl or common retrospective might not be the best strategy. Correct Ans C Question 2 : Another good question, if the all stories has been completed, it means they have met the DoD. Option D is eliminated. Option C, a product backlog is dynamic, it changes based upon the feedback, it is prepared by the Product Owner who has a clear understanding of the. customer being its representative. Option B is eliminated. Option B is eliminated because the test plan is only to make sure that the acceptance criteria is met. Option A is the best answer because Agile is more on getting constant feedback and involvement from the customer. Correct Ans A Question 6 : This is a mandatory requirement and cannot be MISSED especially. Mass production of labels are beginning in a week (close). Option A is a predictive method that follows Change control process, so it's not agile. Option B can be a good choice so they can get feedback because the existing one is small to accommodate the warnings. Option C update the sprint backlog to add the new requirement is not the process of agile in terms it should be submitted first to Product Backlog and reprioritized. Option D can be a good choice but mass production will be done in a week which will cost the organization some wastage if not done sooner. To be sure though, the compliance team knows when it will start. If we know the validity, we can have time to plan for the requirement. Correct Answer is D Question 8 : A-3, B-2, C-4, D-1: Below are the keywords. Bottom Up - use work packages to estimate all the way up on the WBS. Parametric - Cable installation is directly proportional to number of labor hours. Analogous.- From previous similar project. Three point - range of estimates (triangular, standard, beta, variance) Question 12 : Activities come after WBS, so A is out. Bar chart and WBS are two different things all together, so B is out as well. List of risks are part of risk register, so C is out. Only option left is D which is team buy in. You want team to agree on whatever deliverables are assigned to them, so D is the best choice. Correct Ans D Varun
@d4uabc
@d4uabc 6 ай бұрын
Q-8 -- After googling the definitions of each of the estimating technique, my answer is herewith Analagpous estimating -- some of the activities on the project have ... Paremetric estimating -- cable installation is directly ... Three point estimating -- for some of the activities a range ... Bottoms up estimating (ths one i already knew) -- Lakendra is using WP's to build an estimate for WBS
@EduHubSpot
@EduHubSpot 6 ай бұрын
Question 8 : A-3, B-2, C-4, D-1: Below are the keywords. Bottom Up - use work packages to estimate all the way up on the WBS. Parametric - Cable installation is directly proportional to number of labor hours. Analogous.- From previous similar project. Three point - range of estimates (triangular, standard, beta, variance) Varun
@apinderbedi1224
@apinderbedi1224 2 ай бұрын
Lot of hardwork put in to create this video for us. Explaining each and every question with each choice in detail is really hard but you did it to help people like us who are trying to crack PMP.
@EduHubSpot
@EduHubSpot Ай бұрын
Thanks for a wonderful comment & loving the video. Varun
@prabhudevramachandra3563
@prabhudevramachandra3563 8 ай бұрын
I just followed your advice of pause the video use my intelligence to come up with the right answer choice. Q1 I was wrong, Q2-Q4, I have selected my choice correctly by understanding the question and selecting the right choice. TY
@EduHubSpot
@EduHubSpot 8 ай бұрын
Your Most Welcome !! You can follow that till Qus 15. Varun
@sravanishetty5639
@sravanishetty5639 3 күн бұрын
Great job Varun in sharing this valuable information . Thank you so much !!
@EduHubSpot
@EduHubSpot 9 сағат бұрын
Thanks for liking the video. Varun
@ksarunsakthi
@ksarunsakthi 8 ай бұрын
Q 2: I opted for Option D - Since its a Agile Project & Coming up with the agreement with customer for definition of done in the beginning of the sprint can help avoiding the situation of customer not considering it as success at the end of the project.
@EduHubSpot
@EduHubSpot 8 ай бұрын
Question 2 : Another good question, if the all stories has been completed, it means they have met the DoD. Option D is eliminated. Option C, a product backlog is dynamic, it changes based upon the feedback, it is prepared by the Product Owner who has a clear understanding of the. customer being its representative. Option B is eliminated. Option B is eliminated because the test plan is only to make sure that the acceptance criteria is met. Option A is the best answer because Agile is more on getting constant feedback and involvement from the customer. Correct Ans A Varun
@ranjithkumar7929
@ranjithkumar7929 3 ай бұрын
Very useful video and this is almost closure to the latest actual PMP exam-2024.Great hand-picked Varun Ji👌👍
@EduHubSpot
@EduHubSpot 3 ай бұрын
Thanks for loving the video. Varun
@sprusti8893
@sprusti8893 8 ай бұрын
Thanks Varun providing the details steps PMP . The question also tricky..
@EduHubSpot
@EduHubSpot 8 ай бұрын
I am glad you loved the video. Varun
@dckinion
@dckinion 5 ай бұрын
Great video on my way to becoming PMP certified. Thank you, Varun.
@EduHubSpot
@EduHubSpot 4 ай бұрын
Thanks for loving the video. Varun
@zond232
@zond232 7 ай бұрын
Thank you for valuable video!
@EduHubSpot
@EduHubSpot 6 ай бұрын
Your Most Welcome !! Varun
@divakarchandel6051
@divakarchandel6051 7 ай бұрын
Q7 - Ans C & D, I think in this scenario, the team is already highly skilled, but because of additional duties there is drop in productivity, so I would recommend some more recruitments and also mentoring the existing team through creative thinkers so that the team members would not feel overburdened and can smartly juggle around in all of their duties in most effective manner.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Question 7 : There is a problem and you do spike to find out that problem. So A is a good choice. Option B is not a good choice because the question is on productivity and motivation. Option C is a good choice because Agile Team should be cross functional and generalized experts/ team member can help when we have requirements facing with different competencies. Option D is not a good choice because the problem is not about creativity. Option E is not even an option. We don’t do that. Time is fixed in Agile. Correct Ans : A & C Varun
@jaouadettadmouti330
@jaouadettadmouti330 5 ай бұрын
i am humbly thankful for technique of finsh to start i stopped the video to whrite my comment you are amazing varun
@EduHubSpot
@EduHubSpot 5 ай бұрын
You made my day ❤️❤️❤️ Varun
@abhisheks.4745
@abhisheks.4745 7 ай бұрын
Q2. I selected A, because frequent feedback from customers can help reducing the amount of rework towards the end of the project. Keeping customers aligned helps keep the project in line with the requirement.
@EduHubSpot
@EduHubSpot 6 ай бұрын
Very impressive!! Varun
@brendahornung1990
@brendahornung1990 2 күн бұрын
I just started one of your Bootcamps. I have spent almost a year studying based on other program's approach. "everyone' told me that by taking more tests; I would improve - but I wasnt at all. I really appreciate - that I get to learn WHY the answers are correct or wrong. I wish I would of known about this last year. I am MORE CONFIDENT that I WILL pass the PMP - the first time. Thanks in advance, Brenda
@EduHubSpot
@EduHubSpot 9 сағат бұрын
Thanks for loving the video. I am sure you will ace the PMP in first attempt. All the best !! Varun
@ankitseksaria
@ankitseksaria 5 ай бұрын
Hey Varun & Team @Eduhubspot, Thanks so much for all your efforts, another excellent Q & A session!
@EduHubSpot
@EduHubSpot 4 ай бұрын
Glad you liked it! Varun
@yinusarafiuayodeji3351
@yinusarafiuayodeji3351 2 ай бұрын
I found this video helpful, great work Varun. I am taking my exam 30th May.
@EduHubSpot
@EduHubSpot 2 ай бұрын
All the best !! Varun
@atrisengupta9776
@atrisengupta9776 8 ай бұрын
Q13: B and D. Having a common kanban board will give more visibility and flow for work done by both teams. Having common milestones and dependency encourages team to work together - Atri
@EduHubSpot
@EduHubSpot 8 ай бұрын
Great job!! Varun
@sairamsubramanian5090
@sairamsubramanian5090 7 ай бұрын
Q1- C (I've no idea about other 3 options but I'm aware of daily scrum since the question had "less frequently" so guessed that scrum layer would be conducted on daily basis.) Q2-D (An agreement with customer on success criteria might prevent future projects). Q3- A. (The development needs to be finished so that testing can be started.) Q4- C&D (It seems the correct approach of a project manager) Q5- (Predictive life cycle-->2nd), (Iterative life cycle-->1st), (Incremental life cycle-->4th), (Hybrid life cycle-->3rd) Q6- D (Any New regulation has to be checked with compliance team) Q7- A & D (Design work has to be creative hence opting for those both options) Q8- (Analogous-->3rd), (Parametric-->4th), (Three point-->2nd), (Bottom up-->1st) Q9- D (Stakeholders need to be notified in case of impact on project schedule and budget) Q10- A&C (The project budget $100,000 and for 20% money spent should have been $20,000) Q11- (Avoid-->2nd), (Smooth-->4th), (Compromise-->1st), (Problem solve->3rd) Q12- C (A list of risks will help new project manager ) Q13- B & D (Both options might sync up the teams) Q14- B (Alterations in legal need to be verified with organization legal team ) Q15- B (Guessed this option as none of the rest options seems to coordinate with legal team )
@EduHubSpot
@EduHubSpot 7 ай бұрын
Question 2 : Another good question, if the all stories has been completed, it means they have met the DoD. Option D is eliminated. Option C, a product backlog is dynamic, it changes based upon the feedback, it is prepared by the Product Owner who has a clear understanding of the. customer being its representative. Option B is eliminated. Option B is eliminated because the test plan is only to make sure that the acceptance criteria is met. Option A is the best answer because Agile is more on getting constant feedback and involvement from the customer. Correct Ans A Question 7 : There is a problem and you do spike to find out that problem. So A is a good choice. Option B is not a good choice because the question is on productivity and motivation. Option C is a good choice because Agile Team should be cross functional and generalized experts/ team member can help when we have requirements facing with different competencies. Option D is not a good choice because the problem is not about creativity. Option E is not even an option. We don’t do that. Time is fixed in Agile. Correct Ans : A & C Question 8 : A-3, B-2, C-4, D-1: Below are the keywords. Bottom Up - use work packages to estimate all the way up on the WBS. Parametric - Cable installation is directly proportional to number of labor hours. Analogous.- From previous similar project. Three point - range of estimates (triangular, standard, beta, variance) Question 11 : A-2, B-3, C-1, D-4: Below are the keywords. COMPROMISE - HALF AND HALF; Avoid - let them do the decision; Smooth - "I heard that you both; Problem Solve - talk about the viewpoints then adopt… Question 12 : Activities come after WBS, so A is out. Bar chart and WBS are two different things all together, so B is out as well. List of risks are part of risk register, so C is out. Only option left is D which is team buy in. You want team to agree on whatever deliverables are assigned to them, so D is the best choice. Correct Ans D I read all your comments, overall good job and thank you for participating. Varun
@xyzcinemas107
@xyzcinemas107 7 ай бұрын
Q7 - Option B & D, Explantion - Team building will help to motivate themselves,also a help or some kind of input on the desgin in the current assignment will help to gain the productivity.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Question 7 : There is a problem and you do spike to find out that problem. So A is a good choice. Option B is not a good choice because the question is on productivity and motivation. Option C is a good choice because Agile Team should be cross functional and generalized experts/ team member can help when we have requirements facing with different competencies. Option D is not a good choice because the problem is not about creativity. Option E is not even an option. We don’t do that. Time is fixed in Agile. Correct Ans : A & C Varun
@noamanshaikh3206
@noamanshaikh3206 8 ай бұрын
Q. 4 answer - A & B its a positive approach to see a mistake, acknowledge it and accepting it, also stating the realty of the fact that mistakes happen going further being constructive with wanting to correcting it . the best way to correct an error of this size and inclusivity i think it is a productive approach to include the whole team to come up with a solution .
@EduHubSpot
@EduHubSpot 8 ай бұрын
Question 4 : Option A is an extreme choice. it is not giving the Director a solution. I remembered in engagement, before coming up to the executives, you need to come up with a solution and not just say it will be corrected. Option B - Definition of Ready will ensure that requirements are clear and before beginning the work, this should be established. At this point, the work has already been selected for that iteration. Option C is a good choice because definition of Done will ensure that the functions are working and meets the acceptance criteria and more importantly, the functions are working and it passed testing. Examining this can fill in the gaps on WHY the scenario happened. Option D is a good choice because this is taking ACCOUNTABILITY of the work done and recording the lesson learned to prevent this from happening in the future. Option E is an extreme choice. Correct Ans C & D Varun
@callumjayakody1145
@callumjayakody1145 5 ай бұрын
love it.. thanks mate...
@EduHubSpot
@EduHubSpot 5 ай бұрын
Glad you enjoyed it! Varun
@tarundpatel1
@tarundpatel1 7 ай бұрын
Q3- Ans 3 Option A- Finish to start. I like you concept of flipping the key words. Nevertheless, I apply a logic as, the first activity must finish to start the next activity..so the answer is Finish-to-start relationship.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Keep up the good work!! Varun
@skotsanya9332
@skotsanya9332 8 ай бұрын
Fantastic Video! It was loaded. I like it. Could not stop watching. Its 3:36AM Guys.... Thanks Varun!
@EduHubSpot
@EduHubSpot 8 ай бұрын
Thanks you so much for loving the video then enjoyed watching it !! Varun
@patriciadeangelis9475
@patriciadeangelis9475 8 ай бұрын
Q9- I definitely think option D is best choice, always notify client/team and revise the timeline (curious to watch your CO video, if cost ins't impacted I'm interested to learn the CO POV if fee doesn't change). Additionally, option B notifying team would be a function of D, as team members are also stakeholders. C- demanding words from resource not productive.
@EduHubSpot
@EduHubSpot 8 ай бұрын
Very impressive!! Varun
@MrDevesh2020
@MrDevesh2020 5 ай бұрын
Great set if questions and very well explained
@EduHubSpot
@EduHubSpot 4 ай бұрын
Glad you liked it. Varun
@atheekhashim5224
@atheekhashim5224 7 ай бұрын
Great Session & efforts! Below are my answers in attempt to get through the questions as a beginner to PMP. Q1 - Didn't know the answers. Q2 - A Q3 - A Q4 - C & D Q5 - Iterative , Predictive, Blank, Blank (Didn't know the definitions) Q6 - D Q7 - Didn't know the answers Q8 - Didn't know the answers Q9 - D Q10 - A & C Q11 - Compromised, Avoid, Smooth, Problem Solve Q12 - Opted A, But its the wrong answer, Didn't know definition of Team Buy In Q13 - B & D (Answered with uncertainty) Q14 - B Q15 - B
@EduHubSpot
@EduHubSpot 7 ай бұрын
Question 1 : Identify the problem in question. Problem is that your day is filled with meetings but you still want to know what’s going on. This is a real problem and real problem can be resolved by doing a scrum of scrum meeting. Coming up with a Kanban board is also good but still you are not meeting or its not really the best. Coming up with fishbowl or common retrospective might not be the best strategy. Correct Ans C Question 5 : A-2, B-1, C-4, D-3: Below are the keywords. A- 2 Predictive - cost, time, scope are determined at early phase. B-1 Iterative - series of repetitive cycles until it reaches perfection. C-4 can be used if product need to be launched quickly. D-3 scope is changing but roll out can be phased. Question 7 : There is a problem and you do spike to find out that problem. So A is a good choice. Option B is not a good choice because the question is on productivity and motivation. Option C is a good choice because Agile Team should be cross functional and generalized experts/ team member can help when we have requirements facing with different competencies. Option D is not a good choice because the problem is not about creativity. Option E is not even an option. We don’t do that. Time is fixed in Agile. Correct Ans : A & C Question 8 : A-3, B-2, C-4, D-1: Below are the keywords. Bottom Up - use work packages to estimate all the way up on the WBS. Parametric - Cable installation is directly proportional to number of labor hours. Analogous.- From previous similar project. Three point - range of estimates (triangular, standard, beta, variance) Question 12 : Activities come after WBS, so A is out. Bar chart and WBS are two different things all together, so B is out as well. List of risks are part of risk register, so C is out. Only option left is D which is team buy in. You want team to agree on whatever deliverables are assigned to them, so D is the best choice. Correct Ans D I read all your comments, overall great job and thank you for participating. This shows me exactly how you think and this is important for your PMP exam. Varun
@zuzuzimmi
@zuzuzimmi 6 ай бұрын
Q9: options C and D seem to be good choices. Ideally, PM would ask the functional manager to explain his/her decision, contact the team member who's going to unavailable and then basically approve or reject the decision to remove the staffer and only after that (or in case if PM approves the decision to remove the team member) the PM would go further to inform the stakeholders about the change. But because we can only choose one answer option here, I would select C as the first choice.
@EduHubSpot
@EduHubSpot 6 ай бұрын
Question 9 : A is not a good choice because project management plan is the HOW to manage situations like this referring to schedule and budget. B is a good choice but will overload the existing team members because of added work on top of already assigned work. C is not a good choice because the team member is a shared resource which can be pulled out anytime for some higher priority. Answer is D because it will basically cause a variance in schedule and cost baseline. Correct Ans D Varun
@user-vt8lb5xp3m
@user-vt8lb5xp3m 8 ай бұрын
Question 1: option C Having a scrum and providing quick summary on the activities will keep both team informed on progress as well it wouldn’t require more time and will be effective
@EduHubSpot
@EduHubSpot 8 ай бұрын
Keep up the good work!! Varun
@dineshbudha9433
@dineshbudha9433 6 ай бұрын
Q5: I have Project lifecycle basics knowledge only. So, I’m trying to answer this question with the help of keywords meaning and logics. Iterative LC: series of repeated cycles until it reaches perfection. We perform number of cycles to sure the perfection. Predictive LC: all terms determined in the early phases of life cycle. We determined all things in early stage but situation can be varied in real time execution. Incremental LC: Scope is constantly changing for the new deliverable, but rollout of the deliverable would be done in know phased approach. Hybrid LC: A project which need to be launched in the marked as quickly as possible. We make another version or update the later after market or customer feedback received.
@EduHubSpot
@EduHubSpot 6 ай бұрын
Question 5 : A-2, B-1, C-4, D-3: Below are the keywords. A- 2 Predictive - cost, time, scope are determined at early phase. B-1 Iterative - series of repetitive cycles until it reaches perfection. C-4 can be used if product need to be launched quickly. D-3 scope is changing but roll out can be phased. Varun
@rahmanshahid6570
@rahmanshahid6570 3 күн бұрын
Excellent video and really helpful in preparation. I was struggling to go through all the reference books for exam preparation but now got the clarity about exam preparation. Thanks a lot
@EduHubSpot
@EduHubSpot 9 сағат бұрын
I am glad you loved the video. All the best for your PMP exam preparation. Varun
@dineshbudha9433
@dineshbudha9433 6 ай бұрын
Q2: I’m little bit confused between option A & D, but I would like to select option D. Because we can define the project specification, requirement & time schedule before the project start and also, we can take mutual agreement on the same. Once our mutual agreement done after that both teams are on the same page to understand the project improvement.
@EduHubSpot
@EduHubSpot 6 ай бұрын
Question 2 : Another good question, if the all stories has been completed, it means they have met the DoD. Option D is eliminated. Option C, a product backlog is dynamic, it changes based upon the feedback, it is prepared by the Product Owner who has a clear understanding of the. customer being its representative. Option B is eliminated. Option B is eliminated because the test plan is only to make sure that the acceptance criteria is met. Option A is the best answer because Agile is more on getting constant feedback and involvement from the customer. Correct Ans A Varun
@mwanginjibu663
@mwanginjibu663 Ай бұрын
Really Helpful ..thank you Varun
@EduHubSpot
@EduHubSpot Ай бұрын
Your Most Welcome !! Thanks for loving the video. Varun
@sohilmehta1524
@sohilmehta1524 7 ай бұрын
Q2 - D - It's crucial to grasp the project success criteria in any project. This helps in understanding the client's mindset and the specific criteria they use to determine the success of a project. With this insight, we can plan releases according to the defined criteria, ensuring that they align with and meet the client's expectations.
@EduHubSpot
@EduHubSpot 6 ай бұрын
Question 2 : Another good question, if the all stories has been completed, it means they have met the DoD. Option D is eliminated. Option C, a product backlog is dynamic, it changes based upon the feedback, it is prepared by the Product Owner who has a clear understanding of the. customer being its representative. Option B is eliminated. Option B is eliminated because the test plan is only to make sure that the acceptance criteria is met. Option A is the best answer because Agile is more on getting constant feedback and involvement from the customer. Correct Ans A Varun
@esteenwana9734
@esteenwana9734 7 ай бұрын
Qtn 1: B. I would align the sprint releases to synchronize with the retrospective meetings because they usually take place once a month which to me is done less frequently as the question requested.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Question 1 : Identify the problem in question. Problem is that your day is filled with meetings but you still want to know what’s going on. This is a real problem and real problem can be resolved by doing a scrum of scrum meeting. Coming up with a Kanban board is also good but still you are not meeting or its not really the best. Coming up with fishbowl or common retrospective might not be the best strategy. Correct Ans C
@noamanshaikh3206
@noamanshaikh3206 8 ай бұрын
question 1 : answer - C answer is C, as to what i understand the complexity of that nature of the project (classified) and it requires external involvement; the only way to involve people from outside is to have a robust system in pleace that could satisfy the sensitive information and keep the involvement of the out sourced company limited to requirement of the project.
@EduHubSpot
@EduHubSpot 8 ай бұрын
Awesome job!! Varun
@renegiri27
@renegiri27 6 ай бұрын
Q13: Answer Selected: B and D. Since the issue is related to working in Silos , better coordination and dependency network between projects will enable to better sync up the Deliverables and hence I have chosen B and D
@EduHubSpot
@EduHubSpot 6 ай бұрын
Loving your thought process. Varun
@TheRedcroatian
@TheRedcroatian 3 ай бұрын
Dear Verun, firstly thank you for this QUALITY video!!! Small remark on question 7. T-shaped profiles are not just generalists. A T-shaped team member possesses a strong primary skill or area of expertise, often referred to as their “vertical” skill. What sets T-shaped individuals apart is their willingness and ability to acquire a broader skill set across various domains within the software development lifecycle. They have a working knowledge of other team members’ roles and responsibilities, which allows them to collaborate effectively. T-shaped team members excel in cross-functional collaboration. They can jump in to assist their colleagues when needed, ensuring the team can adapt to changes and tackle a wide range of tasks collectively.
@EduHubSpot
@EduHubSpot 3 ай бұрын
Question 7 : There is a problem and you do spike to find out that problem. So A is a good choice. Option B is not a good choice because the question is on productivity and motivation. Option C is a good choice because Agile Team should be cross functional and generalized experts/ team member can help when we have requirements facing with different competencies. Option D is not a good choice because the problem is not about creativity. Option E is not even an option. We don’t do that. Time is fixed in Agile. Correct Ans : A & C Varun
@AshwaniKumar-cr3ip
@AshwaniKumar-cr3ip 3 ай бұрын
Very helpful, thank you.
@EduHubSpot
@EduHubSpot 3 ай бұрын
Glad it was helpful! Varun
@dineshbudha9433
@dineshbudha9433 6 ай бұрын
Q13: option B is good choice I personally feel because kan-ban is good method to view whole project schedule, queues and progress. Other option C also seems good choice because IT work breakdown can help to software developing team to software release. It also helps to synchronous both team for the better communication and understand the deliverable.
@EduHubSpot
@EduHubSpot 6 ай бұрын
Question 13 : B is to have visibility of the deliverables and D is to have common milestones. A is not a good choice because agile is more suitable for software dev projects. C is maybe a good choice to split different tasks of the work package that will align with the software releases dependency but will not ensure sync for 2 different teams. E is same as C. Correct Ans B & D Varun
@senthivelgopal567
@senthivelgopal567 7 ай бұрын
Q1. Answer is D - Fishbowl windows for each site, because this can help to categorize site based on security requirement then and based on the requirement he can join the meeting in less frequent
@EduHubSpot
@EduHubSpot 6 ай бұрын
Question 1 : Identify the problem in question. Problem is that your day is filled with meetings but you still want to know what’s going on. This is a real problem and real problem can be resolved by doing a scrum of scrum meeting. Coming up with a Kanban board is also good but still you are not meeting or its not really the best. Coming up with fishbowl or common retrospective might not be the best strategy. Correct Ans C Varun
@prr71
@prr71 5 ай бұрын
Thanks much Varun for sharing the wealth of information to crack these exams! really appreciated! The energy,interest and knowledge shows how passionate you are on what you do👏. After having worked in IT for over 20yrs in mostly engineering, and with the mgmt exposure,involvement I got from it, wanted to change gears and wanting to be a TPM.. and here I am watching these to see if I really skip reading the PMBOK and appear for the PMP test(using my practical exp and kb getting from you and other contributors). Let me know what you think about this reverse engineering approach. on a 2nd note, would like to comment on the 3rd question.. the reason as to why the answer is "finish-start" is, because of the dependency ie Until something(development) is "FINISH", something (testing) can not be begun ("START") and therefore it is what it is(FINISH-START)! Going to continue to watch and learn these great sessions! Thanks again!
@EduHubSpot
@EduHubSpot 5 ай бұрын
Very Impressive !! Varun
@ramyapalanisamy4773
@ramyapalanisamy4773 8 ай бұрын
Q1. I choose option C, Why: As its a agile software project with daily meetings, executing scrum would help PM to sync with multiple meetings and can discuss things when its needed.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Great job!! Varun
@zuzuzimmi
@zuzuzimmi 6 ай бұрын
Q13: B and D --these are the only two options where coordination of tasks happens. the Kanban shows who started what and where things are left off for tne next responsible person/team to pick up it from there. The common milestones and dependency network will show who should finish what first for others to start doing their work afterwards.
@EduHubSpot
@EduHubSpot 6 ай бұрын
Loving your thought process. Varun
@jami9382
@jami9382 7 ай бұрын
Q4-Option C & D, team member solved the problem and its always good to identify the gaps and to discuss what went wrong.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Awesome job!! Varun
@mufaddalkapadia8270
@mufaddalkapadia8270 13 күн бұрын
Awesome - Thank you
@EduHubSpot
@EduHubSpot 13 күн бұрын
I am glad you loved the video. Varun
@d4uabc
@d4uabc 6 ай бұрын
Q-13 -- Answer choice D -- as a common MS plan & overall dependency network will highlight the interdependencies for the two team which should help in eliminating the "silo" BASED APPROACH. Second choice can be C & E -- i would say E as decomposing the prject network diagram into granular tasks would be the next step after development of common MS plan & would highlight the interdependencies to the two team at the tak level & help in eliminating the silo based approach.
@EduHubSpot
@EduHubSpot 6 ай бұрын
Question 13 : B is to have visibility of the deliverables and D is to have common milestones. A is not a good choice because agile is more suitable for software dev projects. C is maybe a good choice to split different tasks of the work package that will align with the software releases dependency but will not ensure sync for 2 different teams. E is same as C. Correct Ans B & D Varun
@amitprusty3941
@amitprusty3941 7 ай бұрын
11. Avoid: I don’t have time or some other constraint, hence I don’t want to do. Asking team to do themselves. Smooth: Appreciating for resolving the issue earlier and expecting team to do so again. Compromise: Equal weightage to 2 parties, hence half development as per Ron and other as per Susy Problem solve: analyzing the issue, getting solution from both. Measuring & comparing the factors against 2 parties and finally picking the best one.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Question 11 : A-2, B-3, C-1, D-4: Below are the keywords. COMPROMISE - HALF AND HALF; Avoid - let them do the decision; Smooth - "I heard that you both; Problem Solve - talk about the viewpoints then adopt… Varun
@farshadaboobacker
@farshadaboobacker 8 ай бұрын
Q1 - C (having focused scheduled meetings to sync would help) Q2 - A (regular feedback from customer would help) Q3 - A (development has to Finish and only testing can Start) Q4 - C and D (A and E cannot be correct, between B and C, C is better choice as one solution has not worked) Q5 - Iterative (repeated cycles keyword), Predictive (Scope, Cost and Time are pre-fixed), Hybrid (scope flexible and known rollout, Incremental (last choice) Q6 - D (check first with Compliance before proceeding and making next decision) Q7 - A and C (B - takes time, D - again time consuming, E - worst fit) Q8 - 1 is Bottom up (keyword make her way up), rest no idea Q9 - D (none of the other 3 will help to mitigate the resource issue) Q10 - A (15% only spent though 20% work done) and C (20% work done whereas the plan was 30%) Q11 - 1-B (avoid dealing both), 2-C (making both happy), 3-A (splitting equally to both), 4-D (best solution by discussing with both all pro/cons of both approaches and then decide) Q12 - A (assuming WBS is work breakdown system and its linked to activities) Q13 - B and D (keyword Common in both that can tackle the Silos issue in question) Q14 - B (disregard for Legal requirements in question, so best to take Legal advice) Q15 - C (issue is use of Patented component, remove it and develop alternative and proceed)
@EduHubSpot
@EduHubSpot 8 ай бұрын
Question 8 : A-3, B-2, C-4, D-1: Below are the keywords. Bottom Up - use work packages to estimate all the way up on the WBS. Parametric - Cable installation is directly proportional to number of labor hours. Analogous.- From previous similar project. Three point - range of estimates (triangular, standard, beta, variance) Question 11 : A-2, B-3, C-1, D-4: Below are the keywords. COMPROMISE - HALF AND HALF; Avoid - let them do the decision; Smooth - "I heard that you both; Problem Solve - talk about the viewpoints then adopt… Question 12 : Activities come after WBS, so A is out. Bar chart and WBS are two different things all together, so B is out as well. List of risks are part of risk register, so C is out. Only option left is D which is team buy in. You want team to agree on whatever deliverables are assigned to them, so D is the best choice. Correct Ans D Question 15 : A - closing the project should be discussed first in a kill-point session to ensure everyone is on the same page. This is also an extreme choice. C is not a good choice because it of LEGAL issues with the current design. D is also an extreme choice. B is the best choice because knowing which features are patented can be removed and alternate solutions can be added in the backlog and reprioritized. Correct Ans B I read all your comments, overall great job and thank you for participating. This shows me exactly how you think and this is important for your PMP exam. Varun
@AmanDeep-el8ow
@AmanDeep-el8ow 7 ай бұрын
Q3- C, felt this being the right answer due to its focus on all the modules starting first where as others have start to end approach or vice versa. Whereas first we need to ensure all the modules start atleast then end ll come own
@EduHubSpot
@EduHubSpot 7 ай бұрын
Question 3 : If you know my flip technique, then you know the answer is Finish to Start (key words cannot BEGIN until dev COMPLETED) Correct Ans A Varun
@user-dg9zh5eo4y
@user-dg9zh5eo4y 7 ай бұрын
Hello, so I recorded my answers and then posting them all here at once. Q1: I was confused between A and C. I answered A. For some reason I like for both teams to have the update and see it always on Kanban board so they have an update especially both are doing standups. Q2: I was also confused between A & D. I answered D. I like to have a feedback from customer (in sprint review usually) as I progress in the meeting and before the end of the project or the final project review or demo session. Q3: I answered A. Which was logic to me as they request to start the next work after I finish the previous one. So it is Finish to Start Q4: I was sure about D but was confused between C or B. I selected B & D. As I thought for some reason that Definition or Ready (DOR) means ready to be Released not ready to start working on it. Q5: I answered: Iterative, Predictable, Hybrid, and Incremental. Iterative because Time and cost is changing and scope will be planned in early phase in Sprint planning. Predictive is fixed all the time and planned before start the project. Hybrid is because something is changing and other is in well-known phased approach, incremental is because the fast or “quickly” to market approach Q6: My answer was D. For any change like this, I always prefer to go to the SME to verify before annoying the MGMT or get the next step of sending it to the factory. I need to have an approval first. Q7: I answered A and then the second one I selected B. I excluded D and E immediately. I was thinking of the idea that the team works fast and with quality but something came up recently and need to be corrected. So I selected B to remotivate the team while checking the reason in A. So, I excluded C as it would take time for the whole team to go again through the Forming, Storming, Norming, Performing process. Q8: I forgot these terms so I did answer it until I searched on the different Cost Estimate methods or techniques to remind me on their definitions. Q9: My answer was D. This was the only logical answer to me especially it is including the next best action of raising a change request. Q10: I answered A & C. This was a straight forward but without using formulas. Q11: I answered as following: A. Compromise (as it is not completed or correct solution) B. Avoid (ignore to listen) C. Smooth (the nice words) D. Problem solving (this has the solution imo) Q12: I answered A. WBS consists of the main requirements that consist of Activities along with time and owner. Q13: I answered B & D. B is good for better communication and as I mentioned, I like to have the kanban board visible by the team for better collaboration and alignment. And I excluded A, and E, then C as it is not helping. D is more logical option as it clarified the next steps and the major milestones. Q14: I answered B. As I answered one of the previous questions, I want to discuss with SME first to take their opinion and approval on this change. Although, I usually uses CAB not CCB but after reading what CCB means, I figured out that this is an early step so I excluded A, C is also still early and not the first step. D is not helping here and still B is better option. Q15: I answered B. A is not correct imo, C is not the first thing to do.. D is not an option to me as someone don’t five up easily 
@EduHubSpot
@EduHubSpot 7 ай бұрын
Question 1 : Identify the problem in question. Problem is that your day is filled with meetings but you still want to know what’s going on. This is a real problem and real problem can be resolved by doing a scrum of scrum meeting. Coming up with a Kanban board is also good but still you are not meeting or its not really the best. Coming up with fishbowl or common retrospective might not be the best strategy. Correct Ans C Question 2 : Another good question, if the all stories has been completed, it means they have met the DoD. Option D is eliminated. Option C, a product backlog is dynamic, it changes based upon the feedback, it is prepared by the Product Owner who has a clear understanding of the. customer being its representative. Option B is eliminated. Option B is eliminated because the test plan is only to make sure that the acceptance criteria is met. Option A is the best answer because Agile is more on getting constant feedback and involvement from the customer. Correct Ans A Question 4 : Option A is an extreme choice. it is not giving the Director a solution. I remembered in engagement, before coming up to the executives, you need to come up with a solution and not just say it will be corrected. Option B - Definition of Ready will ensure that requirements are clear and before beginning the work, this should be established. At this point, the work has already been selected for that iteration. Option C is a good choice because definition of Done will ensure that the functions are working and meets the acceptance criteria and more importantly, the functions are working and it passed testing. Examining this can fill in the gaps on WHY the scenario happened. Option D is a good choice because this is taking ACCOUNTABILITY of the work done and recording the lesson learned to prevent this from happening in the future. Option E is an extreme choice. Correct Ans C & D Question 5 : A-2, B-1, C-4, D-3: Below are the keywords. A- 2 Predictive - cost, time, scope are determined at early phase. B-1 Iterative - series of repetitive cycles until it reaches perfection. C-4 can be used if product need to be launched quickly. D-3 scope is changing but roll out can be phased. Question 7 : There is a problem and you do spike to find out that problem. So A is a good choice. Option B is not a good choice because the question is on productivity and motivation. Option C is a good choice because Agile Team should be cross functional and generalized experts/ team member can help when we have requirements facing with different competencies. Option D is not a good choice because the problem is not about creativity. Option E is not even an option. We don’t do that. Time is fixed in Agile. Correct Ans : A & C Question 8 : A-3, B-2, C-4, D-1: Below are the keywords. Bottom Up - use work packages to estimate all the way up on the WBS. Parametric - Cable installation is directly proportional to number of labor hours. Analogous.- From previous similar project. Three point - range of estimates (triangular, standard, beta, variance) Question 12 : Activities come after WBS, so A is out. Bar chart and WBS are two different things all together, so B is out as well. List of risks are part of risk register, so C is out. Only option left is D which is team buy in. You want team to agree on whatever deliverables are assigned to them, so D is the best choice. Correct Ans D I read all your comments, overall great job and thank you for participating. This shows me exactly how you think and this is important for your PMP exam. Varun
@matthewsmith7191
@matthewsmith7191 4 ай бұрын
For question 3, took a sec to realize why it's flipped but it's fairly obvious: while the question reads as the "start" task before the "finish" task, the "finish" task chronologically comes before the "start" task. So you have to finish dev before you can start testing (thus F-S).
@EduHubSpot
@EduHubSpot 4 ай бұрын
Awesome Job !! Varun
@sohilmehta1524
@sohilmehta1524 7 ай бұрын
Q9 - D - The option D is suitable bcz it’s a good way to inform the Project stakeholder about the change in delivery date and budget.
@EduHubSpot
@EduHubSpot 6 ай бұрын
Keep up the good work!! Varun
@abhisheks.4745
@abhisheks.4745 7 ай бұрын
For Q5, I selected A- iterative B- predictive C- incremental D- hybrid. As I wasn't very clear with the concepts of hybrid life cycle
@EduHubSpot
@EduHubSpot 6 ай бұрын
Question 5 : A-2, B-1, C-4, D-3: Below are the keywords. A- 2 Predictive - cost, time, scope are determined at early phase. B-1 Iterative - series of repetitive cycles until it reaches perfection. C-4 can be used if product need to be launched quickly. D-3 scope is changing but roll out can be phased. Varun
@AmanDeep-el8ow
@AmanDeep-el8ow 7 ай бұрын
Q6-D. Options B and D felt best but in B, there can be some delay since mass production is slated to begin in week. So parallel work with compliance team can save time and effort.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Question 6 : This is a mandatory requirement and cannot be MISSED especially. Mass production of labels are beginning in a week (close). Option A is a predictive method that follows Change control process, so it's not agile. Option B can be a good choice so they can get feedback because the existing one is small to accommodate the warnings. Option C update the sprint backlog to add the new requirement is not the process of agile in terms it should be submitted first to Product Backlog and reprioritized. Option D can be a good choice but mass production will be done in a week which will cost the organization some wastage if not done sooner. To be sure though, the compliance team knows when it will start. If we know the validity, we can have time to plan for the requirement. Correct Answer is D Varun
@tsreacts8281
@tsreacts8281 7 ай бұрын
Hi Varun, Thanks for the quick walkthrough and types of different questions Though i scored very less, however very helpful explanation to learn and correct 1. I am not aware of term scrum of scrum hence choose A 2. choose D, as question said stories completed and has Agile PM, expected Agile process followed 3. Good technique 4. choose B and D, rather than C,D 5. could answer it as course syllabus covered 6. choose C than D, clear after explanation 7. chose to Motivate the team as all of them are experts, new way to think after your explanation 8,9. could answer it as course syllabus covered 10. new concept could answer by math, clear after your explanation 11. could answer it as course syllabus covered 12. choose activities, new topic learnt 13. choosed common things between teams 15. CHoosed A than B as 60% of project already complete and legal issue to inform sponsor
@EduHubSpot
@EduHubSpot 7 ай бұрын
Question 1 : Identify the problem in question. Problem is that your day is filled with meetings but you still want to know what’s going on. This is a real problem and real problem can be resolved by doing a scrum of scrum meeting. Coming up with a Kanban board is also good but still you are not meeting or its not really the best. Coming up with fishbowl or common retrospective might not be the best strategy. Correct Ans C Question 2 : Another good question, if the all stories has been completed, it means they have met the DoD. Option D is eliminated. Option C, a product backlog is dynamic, it changes based upon the feedback, it is prepared by the Product Owner who has a clear understanding of the. customer being its representative. Option B is eliminated. Option B is eliminated because the test plan is only to make sure that the acceptance criteria is met. Option A is the best answer because Agile is more on getting constant feedback and involvement from the customer. Correct Ans A Question 4 : Option A is an extreme choice. it is not giving the Director a solution. I remembered in engagement, before coming up to the executives, you need to come up with a solution and not just say it will be corrected. Option B - Definition of Ready will ensure that requirements are clear and before beginning the work, this should be established. At this point, the work has already been selected for that iteration. Option C is a good choice because definition of Done will ensure that the functions are working and meets the acceptance criteria and more importantly, the functions are working and it passed testing. Examining this can fill in the gaps on WHY the scenario happened. Option D is a good choice because this is taking ACCOUNTABILITY of the work done and recording the lesson learned to prevent this from happening in the future. Option E is an extreme choice. Correct Ans C & D Question 5 : A-2, B-1, C-4, D-3: Below are the keywords. A- 2 Predictive - cost, time, scope are determined at early phase. B-1 Iterative - series of repetitive cycles until it reaches perfection. C-4 can be used if product need to be launched quickly. D-3 scope is changing but roll out can be phased. Question 6 : This is a mandatory requirement and cannot be MISSED especially. Mass production of labels are beginning in a week (close). Option A is a predictive method that follows Change control process, so it's not agile. Option B can be a good choice so they can get feedback because the existing one is small to accommodate the warnings. Option C update the sprint backlog to add the new requirement is not the process of agile in terms it should be submitted first to Product Backlog and reprioritized. Option D can be a good choice but mass production will be done in a week which will cost the organization some wastage if not done sooner. To be sure though, the compliance team knows when it will start. If we know the validity, we can have time to plan for the requirement. Correct Answer is D Question 7 : There is a problem and you do spike to find out that problem. So A is a good choice. Option B is not a good choice because the question is on productivity and motivation. Option C is a good choice because Agile Team should be cross functional and generalized experts/ team member can help when we have requirements facing with different competencies. Option D is not a good choice because the problem is not about creativity. Option E is not even an option. We don’t do that. Time is fixed in Agile. Correct Ans : A & C Question 8 : A-3, B-2, C-4, D-1: Below are the keywords. Bottom Up - use work packages to estimate all the way up on the WBS. Parametric - Cable installation is directly proportional to number of labor hours. Analogous.- From previous similar project. Three point - range of estimates (triangular, standard, beta, variance) Question 9 : A is not a good choice because project management plan is the HOW to manage situations like this referring to schedule and budget. B is a good choice but will overload the existing team members because of added work on top of already assigned work. C is not a good choice because the team member is a shared resource which can be pulled out anytime for some higher priority. Answer is D because it will basically cause a variance in schedule and cost baseline. Correct Ans D Question 11 : A-2, B-3, C-1, D-4: Below are the keywords. COMPROMISE - HALF AND HALF; Avoid - let them do the decision; Smooth - "I heard that you both; Problem Solve - talk about the viewpoints then adopt… Question 12 : Activities come after WBS, so A is out. Bar chart and WBS are two different things all together, so B is out as well. List of risks are part of risk register, so C is out. Only option left is D which is team buy in. You want team to agree on whatever deliverables are assigned to them, so D is the best choice. Correct Ans D Question 13 : B is to have visibility of the deliverables and D is to have common milestones. A is not a good choice because agile is more suitable for software dev projects. C is maybe a good choice to split different tasks of the work package that will align with the software releases dependency but will not ensure sync for 2 different teams. E is same as C. Correct Ans B & D Question 14 : PM is not sure what legal requirements that go disregarded. It can only be confirmed by Legal team. B. is the correct answer. A is not because the legal requirements are not validated yet. C is not because the change is not approved and validated. D can be a good choice to refer maybe there was a similar situation. Correct Ans B Question 15 : A - closing the project should be discussed first in a kill-point session to ensure everyone is on the same page. This is also an extreme choice. C is not a good choice because it of LEGAL issues with the current design. D is also an extreme choice. B is the best choice because knowing which features are patented can be removed and alternate solutions can be added in the backlog and reprioritized. Correct Ans B Varun
@ropasafo
@ropasafo 8 ай бұрын
5. 1=Iterative because of the word "repeat". 2= Predictive because everything is 'predicted' early 3= Hybrid because of the 'known phased approach' and the unpredictable nature of changing deliverables. 4= Incremental because it's the last choice and the speed demands of it will lead to it being incremented upon with time and developments one doesn't know about.
@EduHubSpot
@EduHubSpot 8 ай бұрын
Keep up the good work!! Varun
@ramyapalanisamy4773
@ramyapalanisamy4773 7 ай бұрын
Q3. I choose option A, Why; When project can start only after completing all other requirements so it would be finish-to-start relationship.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Great job!! Varun
@sohilmehta1524
@sohilmehta1524 7 ай бұрын
Q1 - C - Selecting the Scrum of Scrum layer and Execute option allows the Project Manager to quickly receive updates from the Scrum Master. This approach takes less time and makes it easier to grasp the risks and challenges faced by the Supplier team.
@EduHubSpot
@EduHubSpot 6 ай бұрын
Great job!! Varun
@naveenakula342
@naveenakula342 8 ай бұрын
Question 2: I chose the answer D. I was contemplating between A and D. However, when I get an agreement on success criteria and have a clear definition of done written, customer cannot say that I am not satisfied because you have fulfilled all the success criteria.
@EduHubSpot
@EduHubSpot 8 ай бұрын
Question 2 : Another good question, if the all stories has been completed, it means they have met the DoD. Option D is eliminated. Option C, a product backlog is dynamic, it changes based upon the feedback, it is prepared by the Product Owner who has a clear understanding of the. customer being its representative. Option B is eliminated. Option B is eliminated because the test plan is only to make sure that the acceptance criteria is met. Option A is the best answer because Agile is more on getting constant feedback and involvement from the customer. Correct Ans A Varun
@Shahabayesha
@Shahabayesha 6 ай бұрын
Hi Varun, This is my second Q&A after my first HW#0. I thought until my mentor gave, let me not lose my momentum, so I made a self-study plan in Eduhub spot and, it directed me to pick this up as an assignment. I thoroughly enjoyed and this time I heard the explanation in 1:75 speed as I was getting it and, I scored 10/15 i.e. 66.66 %. In this video for the first time I learnt the "Match the following" type of questions. I can't stop learning. Thank you so much. Regards, Ayesha
@EduHubSpot
@EduHubSpot 6 ай бұрын
10/15 is good score, i know you can get 15/15. thanks for the participation. Varun
@sachinyadav-eo3dp
@sachinyadav-eo3dp 7 ай бұрын
Q 13. Option C and D. The other options are focused on solving the issues of one of the team but these options include working with both the team simultaneously.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Question 13 : B is to have visibility of the deliverables and D is to have common milestones. A is not a good choice because agile is more suitable for software dev projects. C is maybe a good choice to split different tasks of the work package that will align with the software releases dependency but will not ensure sync for 2 different teams. E is same as C. Correct Ans B & D Varun
@shashikiranj818
@shashikiranj818 8 ай бұрын
Q.5 Here are my matches and my understanding. Hybrid - Its looks like a combination of Predictive & Agile since the scope is fixed but time & cost are modified Predictive - Scope, Time & cost are fixed Iterative - Scope is changing but the Release is fixed Incremental - I think with Incremental, the product will launched with minimum features and features will be released as and when they are ready.
@EduHubSpot
@EduHubSpot 8 ай бұрын
Question 5 : A-2, B-1, C-4, D-3: Below are the keywords. A- 2 Predictive - cost, time, scope are determined at early phase. B-1 Iterative - series of repetitive cycles until it reaches perfection. C-4 can be used if product need to be launched quickly. D-3 scope is changing but roll out can be phased. Varun
@angelica7509
@angelica7509 8 ай бұрын
Q8. Parametric I came to this answer using process of elimination. Analogous I picked this because the second definition clear installation activity is directly proportional to the labor hours. Bottom up will be my next answer, because the definition goes over that some of the project was already done. Lastly for the last definition I picked three-point since this is the last key word without a definition.
@EduHubSpot
@EduHubSpot 8 ай бұрын
Question 8 : A-3, B-2, C-4, D-1: Below are the keywords. Bottom Up - use work packages to estimate all the way up on the WBS. Parametric - Cable installation is directly proportional to number of labor hours. Analogous.- From previous similar project. Three point - range of estimates (triangular, standard, beta, variance) Varun
@sanjaysharma1477
@sanjaysharma1477 3 ай бұрын
C. Thinking thru your Neil Armstrong approach, C seems to be the very first action I would take as the PM.
@EduHubSpot
@EduHubSpot 3 ай бұрын
I wish you would have mentioned the question number, so I am really confused which question this explanation is for. Varun
@jeyhunhasanov760
@jeyhunhasanov760 5 ай бұрын
Hi want to ask you, is this platform where you choose your answers with drag and drop and various questions free? Or we need to subscribe in eduhub?
@EduHubSpot
@EduHubSpot 5 ай бұрын
We have close to 100 questions free but if you need access to 1000+ questions then you need to subscribe: www.eduhubspot.com/packages/pmp
@divakarchandel6051
@divakarchandel6051 7 ай бұрын
Q 10- Ans A & C. It is currently behind the schedule but also under budget also as only 15% of the budget has been utilized in completing the 20% of the work completed so far.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Keep up the good work!! Varun
@abhisheks.4745
@abhisheks.4745 7 ай бұрын
Q3. I selected A, because unless and until requirements are not finished, develeopment on modules can't start. So clearly, Finish to Start relationship.
@EduHubSpot
@EduHubSpot 6 ай бұрын
Great job!! Varun
@xyzcinemas107
@xyzcinemas107 7 ай бұрын
Q13 - Option B & D. Kanban board will help to list down the task with their current status which will help both teams to collaborate and communicate. Creating common milestone and dependency network diagram will help identify the coomon issues and find out the depency between both teams.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Very impressive!! Varun
@sachinyadav-eo3dp
@sachinyadav-eo3dp 7 ай бұрын
Q6. Option B. It is always a good option to develop a prototype and present it to the stakeholders especially for additional changes that are being implemented for the first time.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Question 6 : This is a mandatory requirement and cannot be MISSED especially. Mass production of labels are beginning in a week (close). Option A is a predictive method that follows Change control process, so it's not agile. Option B can be a good choice so they can get feedback because the existing one is small to accommodate the warnings. Option C update the sprint backlog to add the new requirement is not the process of agile in terms it should be submitted first to Product Backlog and reprioritized. Option D can be a good choice but mass production will be done in a week which will cost the organization some wastage if not done sooner. To be sure though, the compliance team knows when it will start. If we know the validity, we can have time to plan for the requirement. Correct Answer is D Varun
@shashikiranj818
@shashikiranj818 8 ай бұрын
Q2. I think answer is A. Obtaining feedback customer on each Incremental release demos and UATs will help to understand the expectation and correct it for the next iterations.
@EduHubSpot
@EduHubSpot 8 ай бұрын
Very impressive!! Varun
@dineshbudha9433
@dineshbudha9433 6 ай бұрын
Q4: this question makes lots of situations because all team member is in panic situation when it appears the implemented caused the function to fail. If I’m in this situation as a project manager I would like go with Option B & C. Option B for checking with team whether project is ready for working or not, if it is not ready then when it will ready to working and is there any possibilities to meet deadline with definition of ready. Option C as a part of good manager who always part of team like leader not like a boss. I personally work on and examine the situation try to come out with solution.
@EduHubSpot
@EduHubSpot 6 ай бұрын
Question 4 : Option A is an extreme choice. it is not giving the Director a solution. I remembered in engagement, before coming up to the executives, you need to come up with a solution and not just say it will be corrected. Option B - Definition of Ready will ensure that requirements are clear and before beginning the work, this should be established. At this point, the work has already been selected for that iteration. Option C is a good choice because definition of Done will ensure that the functions are working and meets the acceptance criteria and more importantly, the functions are working and it passed testing. Examining this can fill in the gaps on WHY the scenario happened. Option D is a good choice because this is taking ACCOUNTABILITY of the work done and recording the lesson learned to prevent this from happening in the future. Option E is an extreme choice. Correct Ans C & D Varun
@angelica7509
@angelica7509 8 ай бұрын
Q6.D. I picked D because the team would check with the compliance team to validate the new label flap. This will help to determine if the new fold is in compliance.
@EduHubSpot
@EduHubSpot 8 ай бұрын
Very impressive!! Varun
@divakarchandel6051
@divakarchandel6051 7 ай бұрын
Q9 - Ans D, Since the impact of moving out of the key resource is definitely going to impact on schedule and budget, I would involve the project stakeholders at this stage and would raise change request for the same.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Awesome job!! Varun
@xyzcinemas107
@xyzcinemas107 7 ай бұрын
Q7 - Option D. There is a impact on all the 3 factors of the project hence its very important to document and communicate it to the project stakeholders
@EduHubSpot
@EduHubSpot 7 ай бұрын
Question 7 : There is a problem and you do spike to find out that problem. So A is a good choice. Option B is not a good choice because the question is on productivity and motivation. Option C is a good choice because Agile Team should be cross functional and generalized experts/ team member can help when we have requirements facing with different competencies. Option D is not a good choice because the problem is not about creativity. Option E is not even an option. We don’t do that. Time is fixed in Agile. Correct Ans : A & C Varun
@rachnakhanna993
@rachnakhanna993 7 ай бұрын
Q14-B - first thing to do is to check if ok to do else subsequent activities may not be of use
@EduHubSpot
@EduHubSpot 6 ай бұрын
Great job!! Varun
@zuzuzimmi
@zuzuzimmi 6 ай бұрын
Q4: answers D and C. D --because that's where the explanation is as to why and how the failure happened. C --because obviously if the new solution leads to the failure then it means something was omitted from the definition of done (the assumption is that otherwise the team would have noted to check it before the release).
@EduHubSpot
@EduHubSpot 6 ай бұрын
Very impressive!! Varun
@ramyapalanisamy4773
@ramyapalanisamy4773 8 ай бұрын
Q2. I Choose option A, why: Getting feedback regularly from customer side would help project team to understand their needs and helps to improvise based on the suggestion in user tests.
@EduHubSpot
@EduHubSpot 7 ай бұрын
Awesome job!! Varun
@rachnakhanna993
@rachnakhanna993 7 ай бұрын
Q11- Avoid -2, Smooth-3, Compromise-1, Problem solve -4 - shows deeps diving to understand the problem to resolve the same without favouring or avoiding any
@EduHubSpot
@EduHubSpot 6 ай бұрын
Great job!! Varun
The Most Important 10 PMP Mindsets to Approach PMP Questions
40:03
Inside Out 2: Who is the strongest? Joy vs Envy vs Anger #shorts #animation
00:22
Useful gadget for styling hair 🤩💖 #gadgets #hairstyle
00:20
FLIP FLOP Hacks
Рет қаралды 9 МЛН
How Many Balloons Does It Take To Fly?
00:18
MrBeast
Рет қаралды 196 МЛН
What it feels like cleaning up after a toddler.
00:40
Daniel LaBelle
Рет қаралды 84 МЛН
180 PMP Exam Practice Questions - Updated for 2024
3:02:43
Helena Liu
Рет қаралды 27 М.
How I Passed my PMP Exam in 2 weeks!! (2023 Study Guide)
9:26
150 CAPM Exam Practice Questions - Updated for 2024
1:59:16
Helena Liu
Рет қаралды 15 М.
Inside Out 2: Who is the strongest? Joy vs Envy vs Anger #shorts #animation
00:22