Рет қаралды 1,128
For this mission, Rossco experts are assembling a 9-axle combination with 3-axle booster. The job is to transport the 192,000-pound base unit of a Liebherr LR 1800-1.0 800-ton crawler crane to a wind farm. Here, a customer is busy setting up the crane. "And he is really pleased that we can load the element in one piece and not in two units. That results in a massive time saving," Ross Kovach describes another positive feedback.