Flexamat Low Water Crossings

  Рет қаралды 2,715

Flexamat

Flexamat

2 жыл бұрын

Installation of Flexamat for low water crossings utilized by the US Forest Service and NRCS.
The Angeles Forest Service maintains a stretch of maintenance and access roads near the Pacific Crest Trailhead in Santa Clarita, CA. The project involved rehabilitation of two low water crossings, which were experiencing heavy erosion as a result of recent wildfires. The Forestry had originally designed the two crossings with a combination of rip rap and concrete. Flexamat offered the Forest Service and NRCS a cost-saving alternative to their design which resulted in a quicker installation and a more natural look.

Пікірлер
Heartwarming Unity at School Event #shorts
00:19
Fabiosa Stories
Рет қаралды 25 МЛН
Building A Low Water Crossing - Un-Vented Ford
6:03
C & F OUTDOORS ADVENTURES
Рет қаралды 1,3 М.
Low water crossing Blanco River Flood
1:20
Water Ranching
Рет қаралды 4,1 М.
2016 BMP Stream Crossings
11:32
SC Forestry Commission
Рет қаралды 4,1 М.
Making A Creek Crossing Part 2 @wildcatwilly
11:10
WildcatWilly
Рет қаралды 1,3 М.
Building a Bridge over a Creek
5:38
Pete Rogers
Рет қаралды 174 М.
Landowners Spring Water Collection System
6:26
BASE CAMP WNC
Рет қаралды 40 М.
EP#4: The Easiest & cheapest Way to Make a Steep Ditch Crossing 80 Acres So. IL Project
8:31
Kapper Outdoors 2.0 Excavation & Land Management
Рет қаралды 1,8 М.