Рет қаралды 1,904
Video of the demolition of the 'Banenbrug' in Wijnegem by Hens NV (www.hensnv.be). The total weight of the bridge is 2500 ton. Hens is working from pontoons with 4 demolition excavators and with special supports under the bridge. What the demolition makes very complete is the design of the bridge over the Albertkanaal. It is a prestressed concrete bridge in form of a banana.
Both Caterpillar demolition excavators are modified by Pladdet (www.pladdet.nl) The Cat 352F has a Pladdet extension for giving more working reach and height. The Cat 349E demolition excavator has a special Pladdet Straight Boom. The Cat 349E is working with NPK S-36XCR concrete shear and 352F with NPK SV-380R concrete (www.npke.eu) Both NPK demolition shears and also other NPK crushers are supplied by NPK dealer DemTech B.V. (www.demtech.eu)