HS2 COLNE VALLEY VIADUCT

  Рет қаралды 2,857

SIMONC

SIMONC

4 ай бұрын

another Dominique position update, its over the grand union canal with the section connecting one side to the other, its off on its new adventure over the last lake on its final journey to disassembly or death, its enjoying life so far gods speed..

Пікірлер: 13
@martinhooper-ix6pg
@martinhooper-ix6pg 4 ай бұрын
Thank you for your enthusiasm and efforts in bringing us this latest update on the progress of Domenique. Deeply saddened that the government cancelled the northern parts. Perhaps it will be revived by a future PM. Looking forward to the next clip as it leaves the lakes and goes uphill.
@SIMONC256
@SIMONC256 4 ай бұрын
thanks, its great that there's a few of us stephenwalker, cuemaster, peter the rock and myself documenting the progress of the colne valley, it's such a massive project and would be a shame if no one could see the engineering/construction/logistics of this behemoth.
@Carlos-im3hn
@Carlos-im3hn 4 ай бұрын
@@SIMONC256 thank you all doing this with different angles, views, comments, and at different times.
@StephenWalker42
@StephenWalker42 4 ай бұрын
Oh wow, Dominic has had a good week since moving on Tuesday, and is now ready to move forward again to the next V shape pier, a lovely view thanks.....
@SIMONC256
@SIMONC256 4 ай бұрын
thanks, yes its picking up speed now, no snagging issues so far , they did have some issue with cable tensioning a few weeks ago but all is good and she's sailing over calm water now
@DaveFiggley
@DaveFiggley 4 ай бұрын
No Ozrics? No Tangerine Dream, dear? Well done for being there at the right time to capture this historic moment. Note the black strip in the centre of the span which is there to protect the 'grout', ie more concrete, that they use to fill the gap. I'm guessing each central gap must be in the region of 24-36 inches and I've no idea how they do it. Still, some mysteries are best left unsolved, right? Keep 'em coming.
@SIMONC256
@SIMONC256 4 ай бұрын
thank you , will have music on the next video of copthall tunnel, " the vent holes of copthall" going in close to have a nose at the vent holes and moving wall, looks like they have almost finished the first vent hole and there massive big woooosh when the train pops inside. I was going to film today the join where the black strip wraps around and some closer views to uncover the mysteries of dominique, but really windy, poor little drone was flapping its little plastic wings at full speed...hopefully less windy in days to come, amen
@chairmakerPete
@chairmakerPete 4 ай бұрын
The project is a disaster, but this bridge is absolutely beautiful.
@Carlos-im3hn
@Carlos-im3hn 4 ай бұрын
HS2 will endure for 100 years. Hopefully helpful and can expand when possible North, West, and East.
@phweakwilled
@phweakwilled 4 ай бұрын
You got your way mate they cancelled the Manchester part. Stop moaning!!
@chairmakerPete
@chairmakerPete 4 ай бұрын
@@phweakwilled I was praising the architecture of this bridge, not moaning.
@mikeybabes7527
@mikeybabes7527 4 ай бұрын
@@Carlos-im3hn:- Politicians are SO shortsighted. None of them AND I mean NONE of them take the long view. If they had kept the Great Central Railway open, none of this environmental vandalism would need to take place. Off shoots from the GCW could have easily been built to Birmingham and up the Manchester at a fraction of the cost. And that is just the saving in money, if you look at what they have done here in Nottingham, what the Victoria station was and the eye sore that was built in its place, well, it makes one wonder.
@Carlos-im3hn
@Carlos-im3hn 3 ай бұрын
@@mikeybabes7527 I think they are slowing electrification of the entire UK rail line until the new nuclear Xe-100s (40 total) get installed by ~2036 ? The new nuclear reactors (80 MWe each, 4 per new plant) will provide total 3.2 GWe across UK...and then they can expand the electric rail lines. These nuclear will probably cost 60 billion....so it was HS2 Phas2a and 2b, or the new nuclear....they went with the X-Energy nuclear.
327. The highest canal aqueduct in the world just got emptied!
12:08
CruisingTheCut
Рет қаралды 612 М.
HS2 - Thame Valley Viaduct to Stoke Mandeville | 6th March 2024
7:58
No empty
00:35
Mamasoboliha
Рет қаралды 10 МЛН
КАК ДУМАЕТЕ КТО ВЫЙГРАЕТ😂
00:29
МЯТНАЯ ФАНТА
Рет қаралды 10 МЛН
Я обещал подарить ему самокат!
01:00
Vlad Samokatchik
Рет қаралды 9 МЛН
HS2, COLNE VALLEY VIADUCT LAKE NUMBER 2
4:47
SIMONC
Рет қаралды 2,6 М.
HS2 COLNE VALLEY VIADUCT SEGMENT ACTION TIME LAPSE 2
3:18
EWR Calvert to Winslow
12:53
The Boy
Рет қаралды 10 М.
update on the Dom and some copthall tunnel
6:03
SIMONC
Рет қаралды 1,5 М.
CASE STUDY: HS2 Colne Valley Viaduct
2:52
Premcrete Ltd
Рет қаралды 2,2 М.
HS2 LAKE NUMBER 2
7:28
SIMONC
Рет қаралды 2,5 М.
HS2 Colne Valley Viaduct
5:19
cuemaster
Рет қаралды 3,7 М.
The latest at where HS2 crosses the Grand Union Canal!
8:00
Peter the Rock
Рет қаралды 2,7 М.