Chipping wardens green tunnel being filled in ready for the A361 realignment and Excavation for the last section of tunnel.
Пікірлер: 7
@thorley19694 күн бұрын
In a few years time you won't even know that the railway is there. Awesome engineering.
@WTFdroning4 күн бұрын
This is why i love Documenting the progress so in ten years time we can see the difference. Nature always finds a way to reclaim and adapt, just take a look at the Great Central Railway that once ran through Woodford Halse, it truly beautiful and a Sanctuary for wildlife.
@gorgu082 күн бұрын
Also the reason it is massively over budget and the north of England is missing out, total travesty the over engineering of this section, a plain embankment would have been perfectly fine through this section…it needed stronger project management to say no, all the other railways round here are visible, this one is going to be as well
@WTFdroning2 күн бұрын
@@gorgu08 I totally agree with you, this should be a cutting and not some over inflated, so called "Green" tunnel.
@davecooper32382 күн бұрын
@@gorgu08How could an embankment replace a tunnel ?
@oldman17344 күн бұрын
Doesn’t seem to be much happening, considering the size of the project.