HV GIS Termination Installation

  Рет қаралды 77,701

Du Hoang

Du Hoang

6 жыл бұрын

Пікірлер: 24
@kennyg1358
@kennyg1358 3 жыл бұрын
Ten times more engineering and work than I would have guessed.
@moondog7862
@moondog7862 Жыл бұрын
Shocking cable preparation, crossed screenwriters, scored the conductor with a knife too😂😂
@mahendrangm4706
@mahendrangm4706 5 жыл бұрын
Wow super...
@douro20
@douro20 3 жыл бұрын
I'm guessing that the heating step is to ensure that the core is completely dry before installing the termination.
@VienDuHoang
@VienDuHoang 3 жыл бұрын
It might be one of the reasons, but the main reason is to make the cable straight and even, before installation.
@zizizizi1709
@zizizizi1709 3 жыл бұрын
110кV? What type is that termination? connex5? connex6s?
@hkvlog4143
@hkvlog4143 3 жыл бұрын
Im a asistent cable jointer and have a experience of six years on 132kv, 220kv,400kv. i worked in qatar for six years. If you need asistent cable jointer then i would be much happy to work with you
@VienDuHoang
@VienDuHoang 3 жыл бұрын
Thank Khadka. Actually, I'm in Viet Nam. But should I have any job, I would let you know. Thank you.
@hkvlog4143
@hkvlog4143 3 жыл бұрын
@@VienDuHoang Thankyou sir , this is my email id = Harikhadka414@gmail.com
@Jim1Guo
@Jim1Guo 2 жыл бұрын
Looks like dry type plug-in termination
@aqibbajwa2003
@aqibbajwa2003 4 жыл бұрын
Which accessory this one?
@VienDuHoang
@VienDuHoang 3 жыл бұрын
3M my friend, it is HV cable accessories.
@bluesignal2334
@bluesignal2334 2 жыл бұрын
How much hours it takes for one termination
@sergeignatievsky4955
@sergeignatievsky4955 2 жыл бұрын
More than 1
@hkvlog4143
@hkvlog4143 4 жыл бұрын
Round cuter no have
@aqibbajwa2003
@aqibbajwa2003 4 жыл бұрын
Hi guys way not use cable streping machine to save time
@VienDuHoang
@VienDuHoang 3 жыл бұрын
the semi-con bonded to XLPE layer, no cutting machine could remove it evenly, and might make the XLPE thinner by removing too much of the insulation. Glass cutting is the safest way, but time consuming.
@zaitonyahya4768
@zaitonyahya4768 Жыл бұрын
3m❤3m❤3❤3❤
@zaitonyahya4768
@zaitonyahya4768 Жыл бұрын
Mitsubishi
1 Termination
15:37
Du Hoang
Рет қаралды 20 М.
Raychem plug-in termination (RPIT)
9:20
All Round Supplies
Рет қаралды 147 М.
Heartwarming Unity at School Event #shorts
00:19
Fabiosa Stories
Рет қаралды 14 МЛН
I Can't Believe We Did This...
00:38
Stokes Twins
Рет қаралды 120 МЛН
БОЛЬШОЙ ПЕТУШОК #shorts
00:21
Паша Осадчий
Рет қаралды 11 МЛН
Components of GIS (Gas insulated Switchgear) | Explained | TheElectricalGuy
9:09
Gaurav J - TheElectricalGuy
Рет қаралды 37 М.
UNDERGROUND CABLE | GIS Termination | XLPE
17:01
Mission Transmission
Рет қаралды 14 М.
HV-CONNEX Installation (short version)
3:01
PFISTERER
Рет қаралды 55 М.
HV CABLE TERMINATION
16:33
SajeevRaju Mixed Vlog
Рет қаралды 7 М.
Electrical and Insulation Testing of HV Gas Insulated Switchgear
1:36:24
35kv tbody
20:27
Barry Grounds
Рет қаралды 7 М.
CONNEX for medium voltage connection systems
2:12
PFISTERER
Рет қаралды 13 М.
PFISTERER Connex | 33kV MV Medium Voltage Size 3 Bushing Connector Plugs
10:58
HV Joints   High Voltage Cable Joints Using 3M Cold Shrink QSIII QS3000
13:19
iPhone 15 Pro в реальной жизни
24:07
HUDAKOV
Рет қаралды 402 М.
⚡️Супер БЫСТРАЯ Зарядка | Проверка
1:00
Отдых для геймера? 😮‍💨 Hiper Engine B50
1:00
Вэйми
Рет қаралды 1,2 МЛН
PART 52 || DIY Wireless Switch forElectronic Lights - Easy Guide!
1:01
HUBAB__OFFICIAL
Рет қаралды 65 МЛН