Рет қаралды 5,593
Continuing on from Stage 3 of the extended depot/shed area and abandoned viaduct, new tunnel portal infrastructure is added in readiness for the viaduct design and construction. Plus I take a look back at some of the highlights on the Station Road channel throughout 2023.
0:00 Introduction
0:47 Tunnel portal construction
20:48 Year in review
24:00 First up for 2024
24:21 Conclusion