On this project I show the start of the layout of the dock and deck and construction with the synthetic decking along with the boathouse to boatlift completion.
Пікірлер: 32
@UPutTheGayInGangster3 жыл бұрын
Beautiful project, Dale. Thank you for posting.
@mmanut2 жыл бұрын
DAMN, U GUYS DO GREAT WORK ‼️🛠️ Vinny 🇺🇸
@davidhook2613 жыл бұрын
Great! Thanks so much Dale! Keep the videos coming!
@DaleWHickman3 жыл бұрын
Thanks David I’m trying to put them together when I have time been pretty busy here 😃
@justindc31243 жыл бұрын
Great Work Dale !!!
@DaleWHickman3 жыл бұрын
Thanks Justin we have a great team effort on this project 👍
@lb7wade5183 жыл бұрын
Great job!!
@DaleWHickman3 жыл бұрын
Thanks Wade I think the guys knocked it out of the park on this one good clean job 💪
@alananderson29616 ай бұрын
Awesome job 👏👏👏
@DaleWHickman6 ай бұрын
Thank you! Cheers!
@johncanty90592 жыл бұрын
What size Excavator and vibratory are you using.
@michaelmixon2479 Жыл бұрын
If the attachment that does the vibration on the piling had a grabber unit like the logging industry uses for tree cutting, I think you would have much more control on the piling. Just a thought.
@DaleWHickmanАй бұрын
Thanks for watching my channel in your comment you were absolutely correct. I would love to have something like that. It Just adds additional weight to the end of the boom and then I would need a larger tractor which I’m starting to get oversize on my barges. Thanks again.
@allendabold56118 ай бұрын
I'm considering putting something like that at my place what is the cost of that job
@DaleWHickman7 ай бұрын
Thanks for watching my channel and your question. Sorry, but I do not like to discuss pricing on the Internet for my competition to find out my price points.
@Paulie12323 жыл бұрын
Hey Dale great job as always. I have two questions for you. What would you estimate the weight of a 6" post @ 16 feet. I'm seeing answers all over the place and what would the average charge be to drive 8 posts of the same as listed above.
@DaleWHickman3 жыл бұрын
Hey Paul really all depends on the time of treatment and how much the Pilings has dried out but it could be anywhere from 125 pounds to 80 pounds. Typical charges for pilings usually go in foot increments $8.00 per foot up to $10 per foot also different charges for different types of soil conditions.
@augustreil3 жыл бұрын
What a nice job Dale. Why don't the dock owners leave the pilings long so they or you can build railings off them ? Thanks and thumbs up. I see Chief the Foreman was there !
@DaleWHickman3 жыл бұрын
Hey August good to hear from you we present several different options when proposing the job and this is the option the customer chose, one issue with polls up and rails down here is during a hurricane a lot of trash will get hung up on the top as well. But we still do them they just look good. Yeah my wife said I need to start putting Chiefly in more of the videos I probably get more likes and comments and subscribers she’s right LOL my wife knows best!
@augustreil3 жыл бұрын
@@DaleWHickman, Thanks Dale. I would think customers would want a big, fat rope strung between them or something, but I guess that's just me, lol.
@geowhjr3 жыл бұрын
Nice video! Wondering if you used hurricane roof ties?
@DaleWHickman3 жыл бұрын
Hey GEORGE you got a good eye right there! There’s actually a beam on the outside and the lifter beams on the inside the hurricane clips are on the inside of the Roof beam where you can’t see them because it’s hidden by the lifter beams. Thanks for watching and commenting!!
@lloydhavekost4611 Жыл бұрын
Dale, admiring your equipment, what is the name of the attachment that drives the pilings? Did you have to custom order it, I don't see that at the equipment rentals in my area. Thanks
@DaleWHickman Жыл бұрын
Thanks for watching a video. I use an MTX on the smaller hoe’s and the Catapiller vibratory plates on the larger
@user-mg5sf5im3f Жыл бұрын
Dale, I’ve been doing alot of seawall work in Michigan, I’m still learning, lakefront property’s they should be with steel pipe and steel frame correct?
@DaleWHickman11 ай бұрын
Hey, thanks for watching my video in your comment. I don’t do any stihl Work down here cause we strictly deal with Sand so steel it’s not really necessary. We do a lot of vinyl seawalls and Woods seawalls and riprap. Good luck with your projects.
@shenoyglobal Жыл бұрын
can those posts in the water have plastic sleeve to protect it from elements?
@DaleWHickman Жыл бұрын
Thanks for watching my channel. I appreciate it. Yes we do offer that as an option as well.
@deaconoriginal3149 Жыл бұрын
What would I use to set pilings thru limestone? What auger? Is limestone jettable?
@DaleWHickman Жыл бұрын
Thanks for watching my channel Deacon, if you’re talking about, saw the limestone, we don’t run into that situation down here so I would not be the best person to ask. Although we do have to sit pilings to limestone rocks, which is not fun, we just have to keep vibrating and using a jet pipe trying to get the rocks moved all the way sometimes I even use a diver to help move the rocks rocks
@joegremillion14882 жыл бұрын
Dale, what size and brand is the vibratory plate for this video please.
@DaleWHickman2 жыл бұрын
Hey Joe thanks a lot for watching my channel I’ve had a lot of local competition copying what we’re doing so I don’t want to give out too much personal information I’m sure you could understand thank you 😊